← Back
Walk-up cooperative
323 WEST 11 STREET
MANHATTAN · BIN 1078298
💬 Discuss this project
1897Year Built
5Stories
C6Building Class
R6Zoning
31,206 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized62 Open Violations 60 unresolved · 2 paperwork only ▸
Walk-up cooperative · Owner of record: 323-325-327 WEST 11TH STREET OWNERSCORP. · 8,182 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof12p · 3 filings · 16 docs
Floor 52p · 1 filing · 20 docs
Floor 44p · 1 filing · 12 docs
Floor 3
Floor 2
Floor 1
3 jobs · most recent 09/11/2025
General Wiring
FiledStatusContractorScope
09/11/2025Permit IssuedBRIGHTLINK ELECTRIC INC.16 meters, 16 new_meters
10/05/2023CompleteBOROWIDE ELECT'L CONTR'S—
02/06/2023CompleteRJ ELECTRICAL CONTRACTORSGeneral Wiring
Building Lifecycle
All (109)Filed (9)Permit Issued (8)Signed Off (4)Violation (54)Inspection (5)Objection (2)Special Inspection (27)
08/13/2025
Permit issued — General Construction
M01180375-I1-GC
07/24/2025
Filed — Alteration
M01180375-I1
07/21/2025
Permit issued — Suspended Scaffold
M01248518-I1-SC
07/16/2025
Filed — Alteration
M01248518-I1
07/01/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
02/12/2025
Special inspection requirement — Masonry
WILLIAM DAVIS
02/12/2025
Special inspection requirement — Final
WILLIAM DAVIS
02/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DAVIS
02/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DAVIS
02/12/2025
Special inspection requirement — Post-installed Anchors
WILLIAM DAVIS
12/01/2023
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00936176-I1
10/05/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00936176-I1
10/05/2023
Permit issued — Sidewalk Shed
M00936176-I1-SH
04/24/2023
Signed off — Alteration
MINOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF EXISTING APARTMENT 4E AT FOURTH FLOOR AS PER PLANS.
M00774580-S1
04/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2023
Permit issued — Plumbing
M00774580-S1-PL
03/29/2023
Violation issued (HPD, closed)
A
03/17/2023
Permit issued — General Construction
M00800848-I1-GC
01/30/2023
Filed — Alteration
M00800848-I1
09/21/2022
Permit issued — General Construction
M00774580-I1-GC
08/15/2022
Filed — Alteration
MINOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF EXISTING APARTMENT 4E AT FOURTH FLOOR AS PER PLANS.
M00774580-S1
08/12/2022
Filed — Alteration
MINOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF EXISTING APARTMENT 4E AT FOURTH FLOOR AS PER PLANS.
M00774580-I1
08/12/2022
Special inspection requirement — Lighting in dwelling units
JOSE ADAMES
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
JOSE ADAMES
07/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
07/13/2022
Special inspection requirement — Final
JOSE ADAMES
03/01/2022
Signed off — Alteration
RENOVATION OF APT 5E ON 5TH FL, PARTITION WORK PER PLANS. INSTALLATION OF NEW ELECTRIC A/C SYSTEM WITH DUCT WORK IN APT. 5E AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00494743-S1
02/17/2022
Signed off — Alteration
RENOVATION OF APT 5E ON 5TH FL, PARTITION WORK PER PLANS. INSTALLATION OF NEW ELECTRIC A/C SYSTEM WITH DUCT WORK IN APT. 5E AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00494743-I1
01/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/30/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Lukyanov-Cherny
09/17/2021
Filed — Alteration
RENOVATION OF APT 5E ON 5TH FL, PARTITION WORK PER PLANS. INSTALLATION OF NEW ELECTRIC A/C SYSTEM WITH DUCT WORK IN APT. 5E AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00494743-P1
09/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Lukyanov-Cherny
08/05/2021
Permit issued — Plumbing
M00494743-S1-PL
07/29/2021
Permit issued — Mechanical Systems
M00494743-I1-GC-CX
06/28/2021
Filed — Alteration
RENOVATION OF APT 5E ON 5TH FL, PARTITION WORK PER PLANS. INSTALLATION OF NEW ELECTRIC A/C SYSTEM WITH DUCT WORK IN APT. 5E AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00494743-S1
06/23/2021
Objection raised — FG- 7.0. Dryer Compliance in R
06/23/2021
Objection resolved — Addressed
06/18/2021
Filed — Alteration
RENOVATION OF APT 5E ON 5TH FL, PARTITION WORK PER PLANS. INSTALLATION OF NEW ELECTRIC A/C SYSTEM WITH DUCT WORK IN APT. 5E AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00494743-I1
06/14/2021
Special inspection requirement — HVAC-R and service water heating equipment
Vladimir Lukyanov-Cherny
06/14/2021
Special inspection requirement — HVAC-R and service water heating system controls
Vladimir Lukyanov-Cherny
06/14/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Vladimir Lukyanov-Cherny
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2021
Violation issued (HPD, closed)
A
03/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Final
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Mechanical Systems
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Fenestration areas
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Insulation placement and R values
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Maintenance information
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Lighting controls
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Air barrier - visual inspection
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Lighting in dwelling units
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Vladimir Lukyanov-Cherny
03/29/2021
Special inspection requirement — Fenestration air leakage
Vladimir Lukyanov-Cherny
07/16/2020
Violation issued (ECB, closed)
Unknown
Latest 60 of 109 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CESMAR LAUNDROMAT LLC103/22/2026
INTERSYSTEMS203/21/2026
DOMINION PROPERTY GROUP203/21/2026
323-325-327 WEST 11TH ST OWNERS303/21/2026
323-327 WEST 11TH STREET OWNERS203/21/2026
323-325-327 W 11 ST OWNERS103/21/2026
323 325 WEST 11TH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS NEW YORK PLLC107/24/2025
ASHRAF CORP110/05/2023
GIULIA ALIMONTI101/30/2023
JOSE ADAMES208/15/2022
CHERNY ARCHITECT PLLC309/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS ENGINEERS203/21/2026
RIMKUS NEW YORK PLLC203/21/2026
Rigid Structural Design, LLC103/21/2026
JAM CONSULTANTS, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCO PLBG AND HTG INCPlumbing307/08/2026
PHILIP BALSAMElectrical103/21/2026
BAE RENOVATIONSGeneral Contractor107/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
JERRICK ASSOCIATES INCGeneral Contractor107/08/2026
TWO-TONE CONTRACTING CORP.General Contractor107/08/2026
A.M.N. CORPORATIONPlumbing107/08/2026
DOME K LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123107/24/2025
ATLAS ATC ENGINEERING INC8011101/30/2023
JOSE ADAMES6148108/15/2022
BUILDTECH ENGINEERING6369108/12/2022
CHERNY ARCHITECT PLLC1925309/17/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP08/13/2025
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP07/21/2025
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC10/05/2023
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC03/31/2023
DOB NOWGeneral ConstructionPermit IssuedGE 2A CONSTRUCTION03/17/2023
DOB NOWGeneral ConstructionPermit IssuedBAE RENOVATIONS09/21/2022
DOB NOWPlumbingSigned-offA.M.N. CORPORATION08/05/2021
DOB NOWMechanical SystemsSigned-offDOME K LLC07/29/2021
BISPLISSUEDORBIT PLBG & HTG INC10/09/2020
BISOTISSUEDA.L ELECTRICAL CORP11/19/2019
BISOTISSUEDA.L ELECTRICAL CORP08/27/2019
BISOTISSUEDA.L ELECTRICAL CORP03/07/2019
BISPLISSUEDORBIT PLBG & HTG INC03/05/2019
BISPLISSUEDORBIT PLBG & HTG INC07/19/2017
BISOTISSUEDBLACK SQUARE BUILDERS CORP07/17/2017
BISFSISSUEDC C CONTROLLED COMBUSTION09/21/2012
BISOTISSUEDFELIXX LLC10/13/2011
BISPLISSUEDBEST PLUMBING & HVAC INC10/13/2011
BISPLISSUEDJOHNSON'S PL,HT,W,S,LLC03/01/2010
BISOTISSUEDTAMC CONSTRUCTION INC11/10/2009
BISOTISSUEDBASONAS CONSTRUCTION CORP07/20/2007
BISEQISSUEDEVEREST SCAFFOLDING INC04/28/2006
BISOTISSUEDLUIS FERMIN03/27/2006
BISPLISSUEDAVON PLBG & HTG INC03/27/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/20/2000
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/29/1999
BISEQISSUEDROCKLEDGE SCAFFOLD CORP12/29/1998
BISOTISSUEDLU/SHEBA CONTRACTORS06/27/1995
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/01/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
02/12/2025MasonryWILLIAM DAVISspecial
02/12/2025FinalWILLIAM DAVISprogress
02/12/2025Tenant Protection Plan ComplianceWILLIAM DAVISspecial
02/12/2025Structural Stability – Alterations of existing buildingsWILLIAM DAVISspecial
02/12/2025Post-installed AnchorsWILLIAM DAVISspecial
08/12/2022Lighting in dwelling unitsJOSE ADAMESenergy_progress
07/27/2022Energy Code Compliance InspectionsJOSE ADAMESprogress
07/27/2022Fire-Resistant Penetrations and JointsLuis Pichardospecial
07/13/2022FinalJOSE ADAMESprogress
09/21/2021Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
09/16/2021Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
06/14/2021HVAC-R and service water heating equipmentVladimir Lukyanov-Chernyenergy_progress
06/14/2021HVAC-R and service water heating system controlsVladimir Lukyanov-Chernyenergy_progress
06/14/2021HVAC-R and service water piping design and insulationVladimir Lukyanov-Chernyenergy_progress
03/29/2021Fire-Resistance Rated ConstructionVladimir Lukyanov-Chernyprogress
03/29/2021FinalVladimir Lukyanov-Chernyprogress
03/29/2021Mechanical SystemsVladimir Lukyanov-Chernyspecial
03/29/2021Fenestration areasVladimir Lukyanov-Chernyenergy_progress
03/29/2021Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
03/29/2021Insulation placement and R valuesVladimir Lukyanov-Chernyenergy_progress
03/29/2021Maintenance informationVladimir Lukyanov-Chernyenergy_progress
03/29/2021Lighting controlsVladimir Lukyanov-Chernyenergy_progress
03/29/2021Air barrier - visual inspectionVladimir Lukyanov-Chernyenergy_progress
03/29/2021Lighting in dwelling unitsVladimir Lukyanov-Chernyenergy_progress
Latest 25 of 27.
▾Documents — 205 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026M00494743-S1Request digital key ↗
09/03/2026M00494743-P1Request digital key ↗
09/02/2026M00774580-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION18
07/13/2022140835158Open ↗
07/12/2022140835158Open ↗
07/08/2022140835158Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION17
12/12/2019123370342Open ↗
11/20/2019123370342Open ↗
11/20/2019123370342Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWLPC Approval/Permit7
09/03/2026M00494743-P1Open ↗
09/03/2026M00494743-S1Open ↗
08/15/2026M00494743-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications45
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
06/27/2019123370342Open ↗
04/17/2017122678218Open ↗
04/17/2017122678218Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M00774580-I1Open ↗
09/23/2026M00774580-I1Open ↗
09/23/2026M00774580-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00494743-S1Open ↗
09/03/2026M00494743-I1Open ↗
09/03/2026M00494743-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00774580-I1Open ↗
08/30/2026M00494743-I1Open ↗
08/25/2026M00494743-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/26/2012121377205Open ↗
10/07/2009120172623Open ↗
09/12/2008110339269Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/26/2012121377205Open ↗
10/07/2009120172623Open ↗
09/12/2008110339269Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/04/2019140835158Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/04/2019140835158Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/04/2019140835158Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING7
07/12/2022140835158Open ↗
07/08/2022140835158Open ↗
02/17/2022140835158Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
12/03/2019123370342Open ↗
09/24/2019140835158Open ↗
09/19/2019140835158Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
02/21/2012120764538Open ↗
05/19/2010120172623Open ↗
05/12/2010120172623Open ↗
▸BISPLUMBING (PL) SIGNOFF1
09/07/2022140835158Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/26/2012121377205Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
06/27/2019123370342Open ↗
07/15/2016122678218Open ↗
03/04/2019140835158Open ↗
▸BISSTREET TREE CHECKLIST1
07/28/2011120764538Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00494743-S1Open ↗
09/03/2026M00494743-P1Open ↗
09/02/2026M00774580-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/05/2019123370342Open ↗
06/27/2019123370342Open ↗
03/04/2019140835158Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/28/2011120764538Open ↗
10/07/2009120172623Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/12/2008110339269Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/27/2019123370342Open ↗
04/17/2017122678218Open ↗
03/09/2017121377205Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/12/2020123370342Open ↗
03/04/2019140835158Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/12/2020123370342Open ↗
03/09/2017121377205Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/04/2019140835158Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/07/2022140835158Open ↗
▸BISTECHNICAL REPORT: ENERGY1
07/28/2011120764538Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00494743-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/08/2022140835158Open ↗
11/12/2020123370342Open ↗
03/04/2019140835158Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/07/2022140835158Open ↗
▸BISPOST-INSTALLED ANCHORS1
09/07/2022140835158Open ↗
▸Approvals, Objections & Sign-offs18
▸BISLANDMARKS APPROVAL6
01/10/2020123370342Open ↗
08/27/2019123370342Open ↗
03/04/2019140835158Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/08/2022140835158Open ↗
11/12/2020123370342Open ↗
04/12/2017121377205Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/26/2012121377205Open ↗
07/28/2011120764538Open ↗
10/07/2009120172623Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/09/2017121377205Open ↗
01/02/2013120764538Open ↗
▸BISFINAL1
09/07/2022140835158Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
11/12/2020123370342Open ↗
01/10/2020123370342Open ↗
06/27/2019123370342Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/07/2022140835158Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION8
07/13/2022140835158Open ↗
02/18/2022140835158Open ↗
01/10/2020123370342Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET6
06/27/2019123370342Open ↗
04/21/2016122678218Open ↗
09/26/2012121377205Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
12/12/2019123370342Open ↗
12/03/2019123370342Open ↗
09/19/2019140835158Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/04/2019140835158Open ↗
▸Other Documents7
▸DOB NOWDHCR Document3
09/03/2026M00494743-S1Open ↗
09/03/2026M00494743-P1Open ↗
08/15/2026M00494743-I1Open ↗
▸BISPRELIMINARY1
09/07/2022140835158Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00800848-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01248518-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01248518-I1Open ↗