← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Hudson Park
323 WEST 96TH STREET · BIN 1086029
💬 Discuss this project
2001Year Built
15Stories
D7Building Class
R8Zoning
133,697 sfGross Floor Area
173Units
LL97 CoveredRent Stabilized20 Active Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: Beacon NY · 16,867 sf lot · 7.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Heavy duty sidewalk shed installation3p · 1 filing · 4 docs
Sub-CellarPinnacle ManagementUnder Construction6p · 1 filing · 10 docs
Filed — no permit issuedFacade restoration and repair5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Shayab West2503/21/2026
Park West503/21/2026
323 West 96th Street403/21/2026
Hudson Park NY303/21/2026
85 Adams203/21/2026
Beacon NY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2026$30.0M—BEACON NY LLC → WEST 96TH STREET ASSOCIATES LLC$224/sf building
01/20/2016$27.0M—Private party → BEACON NY LLC$202/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Structural Engineering Buro109/30/2026
Bazini Engineering412/18/2025
Arquitectura Varela212/22/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&A Construction ServicesScaffold407/08/2026
Alafogiannis Plumbing & HeatingPlumbing207/08/2026
High Quality Electric ofElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Structural Engineering BU5883109/30/2026
Bazini Engineering1808312/18/2025
Building Lifecycle
All (91)Filed (5)Permit Issued (4)Signed Off (1)Facade (FISP) (8)Violation (60)Special Inspection (13)
09/30/2026
Filed — Alteration
Limited facade restoration, including replacing existing still lintels as needed, repairing cracked stone with epoxy, replacing damaged windowsills, and repairing damaged stucco.
M01461409-I1
09/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/16/2026
Special inspection requirement — Final
Ruslan Solovyev
09/16/2026
Special inspection requirement — Masonry
Ruslan Solovyev
05/07/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, open)
B
03/18/2026
Violation issued (HPD, open)
A
03/18/2026
Violation issued (HPD, open)
B
12/29/2025
Permit issued — Plumbing
M01330175-S1-PL
12/29/2025
Permit issued — Boiler Equipment
M01330175-I1-BE
12/18/2025
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR FIVE (5) REPLACEMENT GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330175-S1
12/18/2025
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR FIVE (5) REPLACEMENT GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330175-I1
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
12/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
12/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
07/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
07/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
06/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
03/18/2025
Violation issued (HPD, open)
C
03/11/2025
Violation issued (HPD, closed)
C
03/11/2025
Violation issued (HPD, closed)
C
03/11/2025
Violation issued (HPD, closed)
C
03/11/2025
Violation issued (HPD, open)
C
03/11/2025
Violation issued (HPD, closed)
C
01/23/2025
Violation issued (ECB, closed)
Construction
10/23/2024
Violation issued (HPD, open)
C
10/23/2024
Violation issued (HPD, open)
C
10/13/2024
Violation issued (HPD, closed)
C
10/13/2024
Violation issued (HPD, open)
C
10/13/2024
Violation issued (HPD, open)
C
10/08/2024
Cycle 9 facade report submitted
10/08/2024
Cycle 9 facade report signed — SWARMP
09/24/2024
Cycle 9 facade inspection completed
09/24/2024
Violation issued (HPD, closed)
C
09/24/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, closed)
C
09/18/2024
Violation issued (HPD, open)
C
09/12/2024
Violation issued (HPD, closed)
B
09/12/2024
Violation issued (HPD, open)
C
09/12/2024
Violation issued (HPD, closed)
B
09/12/2024
Violation issued (HPD, closed)
B
09/12/2024
Violation issued (HPD, closed)
A
09/12/2024
Violation issued (HPD, closed)
A
09/12/2024
Violation issued (HPD, closed)
A
09/12/2024
Violation issued (HPD, closed)
B
09/12/2024
Violation issued (HPD, closed)
C
09/12/2024
Violation issued (HPD, open)
C
09/12/2024
Violation issued (HPD, open)
C
09/12/2024
Violation issued (HPD, closed)
B
09/12/2024
Violation issued (HPD, open)
C
08/19/2024
Violation issued (HPD, open)
C
08/18/2024
Violation issued (HPD, open)
C
07/10/2024
Violation issued (HPD, closed)
C
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAlafogiannis Plumbing & Heating12/29/2025
DOB NOWBoiler EquipmentPermit IssuedAlafogiannis Plumbing & Heating12/29/2025
DOB NOWSidewalk ShedSigned-offR&A Construction Services02/16/2023
DOB NOWSidewalk ShedSigned-offR&A Construction Services06/10/2022
BISOTISSUEDG. Bauer11/10/2008
BISOTISSUEDUniversal Stone & Title08/17/2005
BISEQISSUEDOutdoor Installations04/26/2005
BISBLISSUEDBass Mechanical06/09/2003
BIS—ISSUEDJBF Construction04/11/2003
BISEQISSUEDJBF Construction04/09/2003
BISSPISSUEDMej Plumbing03/17/2003
BISSDISSUEDMej Plumbing03/17/2003
BISSDISSUEDMej Plumbing03/10/2003
BISEQISSUEDJBF Construction02/28/2003
BISEQISSUEDJTG Sons Scaff Co02/28/2003
BISOTISSUEDJBF Construction02/19/2003
BISPLISSUEDTri City Mechanical Group10/11/2002
BISBLISSUEDTri City Mechanical Group08/12/2002
BISMHISSUEDBasss Mechanical08/02/2002
BISEQISSUEDSpring Scaffolding04/24/2002
BIS—ISSUEDJBF Construction03/27/2002
BISEQISSUEDJBF Construction03/27/2002
BISSPISSUEDMej Plumbing03/26/2002
BISEQISSUEDJBF Construction01/18/2002
BISEQISSUEDSpring Scaffolding01/03/2002
BISMHISSUEDBasss Mechanical10/18/2001
BISPLISSUEDTri City Mechanical Group10/18/2001
BISOTISSUEDUrban Foundation Engineering04/17/2001
BIS—ISSUEDJBF Construction04/10/2001
BISEQISSUEDJBF Construction04/06/2001
BISEQISSUEDFMC Contractng02/08/2001
BISEQISSUEDFMC Contracting01/19/2001
BISEQISSUEDFMC Contracting01/19/2001
BIS—ISSUEDFMC Contracting01/19/2001
BIS—ISSUEDMJ Cunney10/30/1990
BIS—ISSUEDMJ Cunney09/05/1990
1 project · most recent 12/18/2025
Gas
FiledStatusContractorScope
12/18/2025Permit IssuedAlafogiannis Plumbing & HeatingGas
1 project · most recent 06/15/2022
FiledStatusContractorScope
06/15/2022Permit IssuedHigh Quality Electric of—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/25/2026Tenant Protection Plan Compliance—special
09/16/2026FinalRuslan Solovyevprogress
09/16/2026MasonryRuslan Solovyevspecial
12/18/2025HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
12/18/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/18/2025HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
12/08/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
12/08/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
07/21/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
07/21/2025HVAC-R and service water heating system controls—energy_progress
07/21/2025HVAC-R and service water piping design and insulation—energy_progress
06/30/2025Tenant Protection Plan Compliance—special
06/30/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
10/04/2026M01461409-I1Request digital key ↗
09/06/2026M01248918-I1Request digital key ↗
09/01/2026M00754241-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
11/10/2008110375549Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/29/2008110375549Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/04/2026M01461409-I1Open ↗
09/06/2026M01248918-I1Open ↗
09/01/2026M00754241-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/05/2026M01461409-I1Open ↗
09/23/2026M01330175-I1Open ↗
09/23/2026M01330175-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/05/2026M01461409-I1Open ↗
09/23/2026M01330175-I1Open ↗
08/26/2026M01248918-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/29/2008110375549Open ↗
10/29/2008110375549Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/29/2008110375549Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/29/2008110375549Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/06/2026M01248918-I1Open ↗
08/13/2026M01330175-I1Open ↗
08/13/2026M01330175-S1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/29/2008110375549Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
10/29/2008110375549Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/29/2008110375549Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/29/2008110375549Open ↗