2 Open Violations ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: KIMCO GREENRIDGE 674, INC · 164,750 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof14p · 10 filings · 20 docs
Floor 17p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENRIDGE PLAZA 674807/08/2026
KIMCO REALTY2707/08/2026
MCDONALDS103/22/2026
KIMCO GREENRIDGE 674203/21/2026
KINCO REALTY103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROSENBAUM DESIGN GROUP2603/21/2026
A TECH ENGINEERING NYC403/21/2026
SOL BUILDING CONSULTING SERVICES303/21/2026
LOUIS STRIAR1003/21/2026
BUILDING BROTHERS203/21/2026
SWA ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RETAIL PROJECT MANGEMENTGeneral Contractor2107/08/2026
ENVIRONMENTAL ABATEMENTGeneral Contractor407/08/2026
L S SIGNScaffold407/08/2026
OCS BUILDERS GROUP LLCGeneral Contractor307/08/2026
JAL CONTRACTING LLCGeneral Contractor303/21/2026
HOWARD ZAMKOFFElectrical303/21/2026
GENUINE PLBG & HTG LLCPlumbing207/08/2026
A1 SPECIALIZED, INCScaffold207/08/2026
99 CONSTRUCTION INCGeneral Contractor107/08/2026
JON ADAMOGeneral Contractor107/08/2026
OMUNDSEN CONSTRUCTION CORGeneral Contractor107/08/2026
A PLUS PLUMBING CORPPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
AMPERE ELECL SERVICES CORElectrical103/22/2026
R G M SIGNSScaffold107/08/2026
EISENSTEIN, SAMUELElectrical103/21/2026
INNER CITY CONTRACTINGElectrical103/21/2026
PREMIER ELEC'L CONTR'S INElectrical103/22/2026
PROFF ELECTRICAL LLCElectrical103/22/2026
RONALD TESTA, JR.Electrical103/21/2026
A & F FIRE PROTECTION COFire Protection107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DYNAMIC EARTH, LLC37341010/25/2024
RICHMOND TESTING LAB263710/14/2024
NKM ENGINEERING PLLC6244109/13/2023
DOMANI INSPECTION SERVICE843706/29/2023
A TECH ENGINEERING NYC, P6738906/27/2023
HUAN DESIGN INC7669103/21/2023
MACIA INSPECTION & TESTIN402203/23/2021
Building Lifecycle
All (251)Filed (49)Permit Issued (34)Signed Off (27)Violation (16)Inspection (23)Objection (72)Special Inspection (30)
03/26/2026
Violation issued (FDNY_NOV, closed)
01/12/2026
Violation issued (FDNY_NOV, closed)
11/24/2025
Violation issued (FDNY_ORDER, closed)
04/04/2025
Signed off — Alteration
Aldi: New slabs and footings for new configuration, steel framing for altered facade and for new roof equipment, masonry infill, joist reinforcement
S08049731-I1
04/04/2025
Signed off — Alteration
Aldi: New footings for reconfigured facade
S00909113-I1
03/11/2025
Signed off — Alteration
Aldi: Ext.&Int. modifications of exist. building. Removal of exist. canopies,storefront,load bearing&non-bearing partitions,susp. ceilings,lights. Construction of new facade&canopy,new EIFS finish. Install new storefront,partitions,ceilings,lights,doors.
S08049631-I1
03/07/2025
Signed off — Alteration
Aldi: Removal of existing HVAC units and distribution (ducts and diffusers). Installation of new HVAC units, exhaust fans, ducts, diffusers, and unit heaters.
S08049748-I1
03/04/2025
Signed off — Alteration
Aldi: Removal of exist. plumbing fixtures, gas meter & associated gas piping. Install new roof drains & storm piping, underground piping, drains, & vents for new refrigerated cases. New gas meter & piping. New fixtures with sanitary, supply, & vent piping
S08049760-I1
02/04/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-SIDED ACCESSORY SIGN ON EXISTING GROUND STRUCTURE - IN PROPERTY LINES - ALDI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01051822-I1
02/04/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - ALDI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01103411-I1
02/04/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-SIDED ACCESSORY SIGN ON EXISTING GROUND STRUCTURE - IN PROPERTY LINES - ALDI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01051823-I1
11/04/2024
Violation issued (FDNY_ORDER, closed)
11/04/2024
Violation issued (FDNY_ORDER, closed)
11/04/2024
Violation issued (FDNY_ORDER, closed)
10/25/2024
Filed — Alteration
Aldi: Removal of existing HVAC units and distribution (ducts and diffusers). Installation of new HVAC units, exhaust fans, ducts, diffusers, and unit heaters.
S08049748-P2
10/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Peter Howell
10/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Peter Howell
10/23/2024
Special inspection requirement — Shutoff dampers
Peter Howell
10/23/2024
Special inspection requirement — Duct leakage testing, insulation and design
Peter Howell
10/23/2024
Special inspection requirement — Final
Peter Howell
10/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Peter Howell
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Peter Howell
10/23/2024
Special inspection requirement — Maintenance information
Peter Howell
10/23/2024
Special inspection requirement — Mechanical Systems
Peter Howell
10/17/2024
Filed — Alteration
Aldi: Removal of exist. plumbing fixtures, gas meter & associated gas piping. Install new roof drains & storm piping, underground piping, drains, & vents for new refrigerated cases. New gas meter & piping. New fixtures with sanitary, supply, & vent piping
S08049760-P2
10/16/2024
Filed — Alteration
Aldi: Removal of existing HVAC units and distribution (ducts and diffusers). Installation of new HVAC units, exhaust fans, ducts, diffusers, and unit heaters.
S08049748-P1
10/16/2024
Special inspection requirement — Structural Cold-Formed Steel
RICHARD LEMANSKY
10/16/2024
Special inspection requirement — Post-installed Anchors
RICHARD LEMANSKY
10/16/2024
Special inspection requirement — Footing and Foundation
Peter Howell
10/16/2024
Special inspection requirement — Concrete - Cast-In-Place
Peter Howell
10/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Peter Howell
10/16/2024
Special inspection requirement — Final
Peter Howell
10/16/2024
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
10/16/2024
Special inspection requirement — Final
Peter Howell
10/15/2024
Special inspection requirement — Interior lighting power
Peter Howell
10/15/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Peter Howell
10/15/2024
Special inspection requirement — Fenestration areas
Peter Howell
10/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Peter Howell
10/15/2024
Special inspection requirement — Exterior lighting power
Peter Howell
10/15/2024
Special inspection requirement — Air barrier - visual inspection
Peter Howell
10/15/2024
Special inspection requirement — Vestibules
Peter Howell
10/15/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Peter Howell
10/15/2024
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
RICHARD LEMANSKY
10/15/2024
Special inspection requirement — Final
Peter Howell
10/15/2024
Special inspection requirement — Fenestration air leakage
Peter Howell
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Howell
10/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Peter Howell
10/14/2024
Filed — Alteration
Aldi: New footings for reconfigured facade
S00909113-P1
10/14/2024
Filed — Alteration
Aldi: New slabs and footings for new configuration, steel framing for altered facade and for new roof equipment, masonry infill, joist reinforcement
S08049731-P1
10/14/2024
Filed — Alteration
Aldi: Ext.&Int. modifications of exist. building. Removal of exist. canopies,storefront,load bearing&non-bearing partitions,susp. ceilings,lights. Construction of new facade&canopy,new EIFS finish. Install new storefront,partitions,ceilings,lights,doors.
S08049631-P2
10/10/2024
Signed off — Alteration
Installation of a complete fire sprinkler system. Plans filed herewith. No change in use, egress, or occupancy.
S01012175-I1
09/11/2024
Permit issued — Sign
S01103411-I1-SG
09/09/2024
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - ALDI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01103411-I1
08/19/2024
Objection resolved — Addressed
08/16/2024
Objection raised — Scope
08/08/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/07/2024
Filed — Alteration
Installation of a complete fire sprinkler system. Plans filed herewith. No change in use, egress, or occupancy.
S01012175-P2
08/05/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 251 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offWEINFELD, ELLIOT09/11/2024
DOB NOWSignSigned-offWEINFELD, ELLIOT07/23/2024
DOB NOWSignSigned-offWEINFELD, ELLIOT07/23/2024
DOB NOWSignSigned-offWEINFELD, ELLIOT07/23/2024
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC04/19/2024
DOB NOWFoundationSigned-offRETAIL PROJECT MANGEMENT03/08/2024
DOB NOWSidewalk ShedPermit IssuedENVIRONMENTAL ABATEMENT02/23/2024
DOB NOWConstruction FencePermit IssuedENVIRONMENTAL ABATEMENT02/22/2024
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT01/22/2024
DOB NOWGeneral ConstructionSigned-offRETAIL PROJECT MANGEMENT01/22/2024
DOB NOWStructuralSigned-offRETAIL PROJECT MANGEMENT01/22/2024
DOB NOWPlumbingSigned-offRRP PLUMBING CORP01/12/2024
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN09/20/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/05/2023
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT06/28/2023
DOB NOWStructuralSigned-offRETAIL PROJECT MANGEMENT06/21/2023
DOB NOWGeneral ConstructionSigned-offRETAIL PROJECT MANGEMENT05/08/2023
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT05/08/2023
DOB NOWStructuralSigned-offRETAIL PROJECT MANGEMENT05/08/2023
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP04/24/2023
DOB NOWStructuralSigned-offRETAIL PROJECT MANGEMENT04/07/2023
DOB NOWGeneral ConstructionSigned-offRETAIL PROJECT MANGEMENT04/07/2023
DOB NOWMechanical SystemsSigned-offRETAIL PROJECT MANGEMENT04/07/2023
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC03/29/2023
DOB NOWGeneral ConstructionSigned-offSONG DONG03/24/2023
DOB NOWMechanical SystemsSigned-offJAL CONTRACTING LLC03/15/2023
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC03/14/2023
DOB NOWMechanical SystemsSigned-offJON ADAMO12/06/2022
DOB NOWMechanical SystemsSigned-offOCS BUILDERS GROUP LLC04/07/2021
DOB NOWMechanical SystemsSigned-offOCS BUILDERS GROUP LLC02/22/2021
DOB NOWMechanical SystemsSigned-offOMUNDSEN CONSTRUCTION COR08/16/2019
DOB NOWSignSigned-offR.G.M. SIGNS INC07/29/2019
DOB NOWSignSigned-offMAD SIGNS INC05/15/2019
DOB NOWSignSigned-offMAD SIGNS INC01/25/2019
BISMHISSUEDEMCOR SERVICES NY/NJ INC12/05/2007
BISMHISSUEDDABOCO INC&DUANE READE INC05/17/2007
BISPLISSUEDCAPITAL CONTR P&H CORP05/01/2006
BISMHISSUEDGREGG MECHANICAL CORP03/14/2006
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/29/2003
BISOTISSUEDINTERBORO SIGN & MAINTENANCE CO05/27/2003
+ 11 more permits on file
12 projects · most recent 01/22/2026
General Wiring Lighting
FiledStatusContractorScope
01/22/2026Permit IssuedCATELLO ELEC'L CONT., INCLighting
10/07/2024CompletePROFF ELECTRICAL LLC—
09/20/2024CompletePROFF ELECTRICAL LLC—
02/21/2024CompleteRICHARD NEU—
01/17/2024CompleteSOLID STATE ELECTRIC LLC—
01/30/2023CompletePREMIER ELEC'L CONTR'S INGeneral Wiring
01/05/2023CompletePREMIER ELEC'L CONTR'S IN1 meters, 1 new_meters
07/28/2019CompletePAUL VERARDI—
06/25/2019Permit IssuedMARTINEZ ELECTRICAL CONTGeneral Wiring
02/11/2019CompleteLION HEART ELECTRIC CORPGeneral Wiring
06/07/2018CompleteAMPERE ELECL SERVICES COR—
06/07/2018CompleteAMPERE ELECL SERVICES COR—
1 project · most recent 09/27/2023
FiledStatusContractorScope
09/27/2023——1 scope_items
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
08/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/05/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/31/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
05/01/2024Pass-Final PL - UndergroundPassView ↗
04/11/2024Pass-Final PL - UndergroundPassView ↗
03/08/2024Pass-Final PL - UndergroundPassView ↗
03/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2023Pass-Final PL - UndergroundPassView ↗
03/17/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/23/2024Maintenance informationPeter Howellenergy_progress
10/23/2024Shutoff dampersPeter Howellenergy_progress
10/23/2024HVAC-R and service water piping design and insulationPeter Howellenergy_progress
10/23/2024Duct leakage testing, insulation and designPeter Howellenergy_progress
10/23/2024HVAC-R and service water heating system controlsPeter Howellenergy_progress
10/23/2024Mechanical SystemsPeter Howellspecial
10/23/2024Energy Code Compliance InspectionsPeter Howellprogress
10/23/2024FinalPeter Howellprogress
10/23/2024HVAC-R and service water heating equipmentPeter Howellenergy_progress
10/16/2024Footing and FoundationPeter Howellprogress
10/16/2024FinalPeter Howellprogress
10/16/2024Structural Cold-Formed SteelRICHARD LEMANSKYspecial
10/16/2024FinalPeter Howellprogress
10/16/2024Structural Steel - DetailsRICHARD LEMANSKYspecial
10/16/2024Subsurface Investigations (Borings/Test Pits)Peter Howellspecial
10/16/2024Concrete - Cast-In-PlacePeter Howellspecial
10/16/2024Post-installed AnchorsRICHARD LEMANSKYspecial
10/15/2024Fire-Resistant Penetrations and JointsPeter Howellspecial
10/15/2024Fenestration areasPeter Howellenergy_progress
10/15/2024Interior lighting powerPeter Howellenergy_progress
10/15/2024Air barrier - visual inspectionPeter Howellenergy_progress
10/15/2024Lighting controlsPeter Howellenergy_progress
10/15/2024Fenestration and door U-factor and product ratingsPeter Howellenergy_progress
10/15/2024VestibulesPeter Howellenergy_progress
10/15/2024Fenestration air leakagePeter Howellenergy_progress
Latest 25 of 150.
▾Documents — 247 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch44
08/26/2026S00099800-I1Request digital key ↗
08/25/2026S00481550-I1Request digital key ↗
08/23/2026S08041087-I1Request digital key ↗
Showing 3 of 44 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/26/2026S00199854-I1Request digital key ↗
08/25/2026S00465742-I1Request digital key ↗
08/15/2026S00199854-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026S00157763-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/26/2026S00185234-I1Request digital key ↗
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
12/05/2007510019454Open ↗
▸Seals & Professional Certifications150
▸DOB NOWProgress Inspector Seal & Signature60
09/28/2026S00827603-P1Open ↗
09/28/2026S00827603-P1Open ↗
09/02/2026S00827578-I1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
08/26/2026S00199854-I1Open ↗
08/23/2026S00817142-P1Open ↗
08/23/2026S00817142-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/28/2026S00827603-P1Open ↗
09/01/2026S00841049-I1Open ↗
09/01/2026S08049731-P1Open ↗
Showing 3 of 37 on file for this type
▸BISPC FULL REPORT1
10/26/2007510019454Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/26/2007510019454Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/26/2007510019454Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/26/2007510019454Open ↗
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
08/26/2026S00199854-I1Open ↗
08/23/2026S00817142-I1Open ↗
08/23/2026S00817142-P1Open ↗
Showing 3 of 38 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/26/2007510019454Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00909113-P1Open ↗
08/13/2026S00909113-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
10/26/2007510019454Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/05/2007510019454Open ↗
▸Other Documents1
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026S00185234-I1Open ↗