ECB08/26/2026FAILURE TO MAINTAIN BUILDING AND ALL PARTS THEREOF IN A CODE-COMPLIANT MANNER. ATOI OF APARTMENT 1R, I OBSERVED MULTIPLE AC UNITS NOT WORKING, BROKEN COVERS ON ELECTRICAL SWITCHES, BROKEN 1ST FLOOR KITCHEN SINK$2K due
ECB08/26/2026WORK WITHOUT A PERMIT. CONSTRUCTION WORK NOTED. AT THE TIME OF INSPECTION OF APARTMENT 1R, I OBSERVED ERECTED PARTITIONS IN THE CELLAR LEVEL TO CREATE 2 BEDROOMS AT THE BACK OF THE BUILDING AND INSTALLED A DOOR$250 due
ECB08/26/2026OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS. AT THE TIME OF INSPECTION OF APARTMENT 1R, I OBSERVED THE CELLAR LEVEL WITH 2 BEDROOMS ARRANGED AND OCCUPIED A$2K due
HPD07/24/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD07/02/2026§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING , WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD07/02/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD07/02/2026§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD07/02/2026§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQFT AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD07/02/2026§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
ECB05/04/2010FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER RE:INSTALLATION/MAINTENANCE OF PLUMBING MATERIALS/EQUIPMENT PER PC102.3, 27-902. OBSERVED AND PHOTOGRAPHED ILLLEGAL GAS HOOKUP OF SPACE HEATER (GAS FLEX NOT ALLNothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 1,960 sf lot · 1.46 FAR built · Flood zone X