← Back
BuildNYC
Two family converted from one family
3233 OLINVILLE AVENUE
BRONX · BIN 2056195
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5Zoning
972 sfGross Floor Area
2Units
2 Active Violations ▸FDNY Report ↗
Two family converted from one family · 3,125 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFire repair and vertical enlargement, 2nd floorUnder Construction3p · 2 filings · 20 docs
AtticFire repair and vertical enlargement, 2nd floorUnder Construction14p · 1 filing · 20 docs
Floor 2Fire repair and vertical enlargement, 2nd floorUnder Construction16p · 2 filings · 20 docs
Floor 1Fire repair and vertical enlargement, 2nd floorUnder Construction16p · 2 filings · 20 docs
CellarFire repair and vertical enlargement, 2nd floorUnder Construction1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
21-23 Featherbed Lane103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2015$460K—21-23 FEATHERBED LANE CORP → Private party$473/sf building
01/30/2014$180K—Private party → 21-23 FEATHERBED LANE CORP.$185/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nmi Architecture210/14/2026
Jun Yan, PE210/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Migliore Restoration203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
State Contracting Corp NYGeneral Contractor104/09/2026
Theory 3 GroupGeneral Contractor110/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jun Yan, PE7170410/14/2026
Nmi Architecture6825210/14/2026
Building Lifecycle
10/15/2026
Signed off — Alteration
Installation of temporary shoring. In response to Boro. Comm. Em. Dec. # 19623 issued due to fire damage. Limited to the installation of temp. st. shoring and enclosure of bdg. envelope. No repair, reconstruction, enlargement, or alt work in this filing.
X01323706-I1
10/14/2026
Filed — Alteration
THIS APPLICATION IS FILED FOR FIRE REPAIR AND ADD VERTICAL ENLARGEMENT ON THE 2ND FLOOR AT THE REAR SIDE OF THE BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01371453-S2
10/14/2026
Filed — Alteration
THIS APPLICATION IS FILED FOR FIRE REPAIR AND ADD VERTICAL ENLARGEMENT ON THE 2ND FLOOR AT THE REAR SIDE OF THE BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01371453-P1
10/12/2026
Special inspection requirement — Structural Cold-Formed Steel
10/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
51 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTheory 3 Group10/08/2026
DOB NOWStructuralSigned-offState Contracting Corp NY12/30/2025
2 projects · most recent 10/14/2026
Wood
FiledStatusContractorScope
10/14/2026Permit IssuedTheory 3 GroupWood
11/28/2025Signed-offState Contracting Corp NY—
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
10/12/2026Structural Cold-Formed Steel—special
10/09/2026Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
10/09/2026Structural Stability – Alterations of existing buildingsJUN YANspecial
10/09/2026Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
10/09/2026Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
10/09/2026Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
10/09/2026Fenestration air leakageNASHAT IBRAHIMenergy_progress
10/09/2026Fenestration areasNASHAT IBRAHIMenergy_progress
10/09/2026Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
09/15/2026Final—progress
09/15/2026Structural Stability – Alterations of existing buildings—special
09/15/2026Structural Wood Frame—progress
04/08/2026Fenestration and door U-factor and product ratings—energy_progress
04/08/2026Fenestration areas—energy_progress
04/08/2026Energy Code Compliance Inspections—progress
04/08/2026Fire-Resistance Rated Construction—progress
04/08/2026Fenestration air leakage—energy_progress
04/08/2026Insulation placement and R values—energy_progress
04/08/2026Fire-Resistant Penetrations and Joints—special
03/24/2026Structural Stability – Alterations of existing buildings—special
11/24/2025Structural Wood FrameJUN YANprogress
11/24/2025Structural Stability – Alterations of existing buildingsJUN YANspecial
11/24/2025FinalJUN YANprogress
27 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account