← Back
Two family brick
324 85 STREET
BROOKLYN · BIN 3153105
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R4-1Zoning
2,600 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Two family brick · 2,400 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 23p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2024$1.6M—Private party → Private party$623/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI705/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394405/09/2025
Building Lifecycle
All (29)Filed (7)Permit Issued (3)Signed Off (2)Violation (3)Inspection (5)Special Inspection (9)
11/24/2025
Violation issued (HPD, open)
I
06/02/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071110-I1
05/28/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071114-I1
05/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/21/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/15/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/09/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071110-P3
05/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/03/2024
Violation issued (HPD, open)
I
11/26/2024
Permit issued — General Construction
B01071110-I1-GC
11/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/12/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071114-P2
09/11/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071110-P2
09/11/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071114-P1
09/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/11/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
08/02/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071110-P1
07/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/09/2024
Permit issued — Plumbing
B01071114-I1-PL
07/08/2024
Permit issued — General Construction
B01071110-I1-GC
07/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071110-I1
07/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01071114-I1
03/16/2022
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/26/2024
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC07/09/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC07/08/2024
1 project · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/15/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/09/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
05/09/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
05/09/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/11/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/11/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/11/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/11/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/11/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/11/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026B01071110-P1Request digital key ↗
08/24/2026B01071110-P3Request digital key ↗
08/24/2026B01071110-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 17
08/24/2026B01071110-P1Open ↗
08/24/2026B01071110-I1Open ↗
08/24/2026B01071110-P2Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026B01071110-P1Open ↗
08/24/2026B01071110-I1Open ↗
08/24/2026B01071110-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01071110-P1Open ↗
08/31/2026B01071110-P2Open ↗
08/23/2026B01071110-P3Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01071110-P1Open ↗
08/31/2026B01071110-P2Open ↗
08/23/2026B01071110-P3Open ↗