← Back
Three families
3241 JOHNSON AVENUE
BRONX · Riverdale-Spuyten Duyvil · BIN 2084108
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R6AZoning
2,467 sfGross Floor Area
3Units
Rent Stabilized46 Open Violations ▸FDNY Report ↗
Three families · 3,535 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 16p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASIC GROUPS CORP612/10/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY ACOM ENGINEERING PLLC7061512/10/2020
ANDREW GOODRICH, P.E., PL965107/21/2020
Building Lifecycle
All (76)Filed (6)Permit Issued (2)Signed Off (1)Violation (47)Special Inspection (20)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
04/02/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, open)
I
11/15/2023
Signed off — Alteration
PROPOSED RELOCATE (3) EXISTING GAS METERS FROM 001 TO OSP, CAP & REMOVE EXISTING OIL (1) BOILER AND OIL TANK. INSTALL (1) NEW BOILER AND (1) NEW HOT WATER HEATER AT EXISTING MECH, ROOM. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
X00336023-I1
03/17/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, open)
I
02/17/2022
Violation issued (HPD, open)
A
02/17/2022
Violation issued (HPD, open)
I
05/09/2021
Violation issued (HPD, open)
B
05/09/2021
Violation issued (HPD, open)
B
05/09/2021
Violation issued (HPD, open)
C
05/09/2021
Violation issued (HPD, open)
C
05/09/2021
Violation issued (HPD, open)
B
05/09/2021
Violation issued (HPD, open)
B
05/09/2021
Violation issued (HPD, open)
C
05/09/2021
Violation issued (HPD, open)
B
05/09/2021
Violation issued (HPD, open)
C
04/02/2021
Violation issued (HPD, open)
I
04/02/2021
Violation issued (HPD, open)
A
12/14/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANDREW GOODRICH
12/14/2020
Special inspection requirement — HVAC and service water heating system controls
ANDREW GOODRICH
12/14/2020
Special inspection requirement — HVAC and service water heating equipment
ANDREW GOODRICH
12/14/2020
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
12/10/2020
Filed — Alteration
PROPOSED RELOCATE (3) EXISTING GAS METERS FROM 001 TO OSP, CAP & REMOVE EXISTING OIL (1) BOILER AND OIL TANK. INSTALL (1) NEW BOILER AND (1) NEW HOT WATER HEATER AT EXISTING MECH, ROOM. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
X00336023-P5
12/09/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
12/09/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
12/09/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
12/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
11/20/2020
Filed — Alteration
PROPOSED RELOCATE (3) EXISTING GAS METERS FROM 001 TO OSP, CAP & REMOVE EXISTING OIL (1) BOILER AND OIL TANK. INSTALL (1) NEW BOILER AND (1) NEW HOT WATER HEATER AT EXISTING MECH, ROOM. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
X00336023-P4
11/20/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
11/20/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
11/20/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
11/20/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
10/27/2020
Filed — Alteration
PROPOSED RELOCATE (3) EXISTING GAS METERS FROM 001 TO OSP, CAP & REMOVE EXISTING OIL (1) BOILER AND OIL TANK. INSTALL (1) NEW BOILER AND (1) NEW HOT WATER HEATER AT EXISTING MECH, ROOM. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
X00336023-P3
10/27/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
10/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
10/27/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
10/27/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
10/13/2020
Permit issued — Plumbing
X00336023-I1-PL
09/29/2020
Filed — Alteration
PROPOSED RELOCATE (3) EXISTING GAS METERS FROM 001 TO OSP, CAP & REMOVE EXISTING OIL (1) BOILER AND OIL TANK. INSTALL (1) NEW BOILER AND (1) NEW HOT WATER HEATER AT EXISTING MECH, ROOM. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
X00336023-P2
09/03/2020
Filed — Alteration
PROPOSED RELOCATE (3) EXISTING GAS METERS FROM 001 TO OSP, CAP & REMOVE EXISTING OIL (1) BOILER AND OIL TANK. INSTALL (1) NEW BOILER AND (1) NEW HOT WATER HEATER AT EXISTING MECH, ROOM. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
X00336023-P1
09/03/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
09/03/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
09/03/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
09/03/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
07/21/2020
Filed — Alteration
PROPOSED RELOCATE (3) EXISTING GAS METERS FROM 001 TO OSP, CAP & REMOVE EXISTING OIL (1) BOILER AND OIL TANK. INSTALL (1) NEW BOILER AND (1) NEW HOT WATER HEATER AT EXISTING MECH, ROOM. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
X00336023-I1
07/21/2020
Permit issued — Plumbing
X00336023-I1-PL
10/28/2019
Violation issued (HPD, open)
I
11/28/2018
Violation issued (HPD, open)
B
11/28/2018
Violation issued (HPD, open)
B
11/28/2018
Violation issued (HPD, open)
B
11/28/2018
Violation issued (HPD, open)
B
11/28/2018
Violation issued (HPD, open)
B
11/28/2018
Violation issued (HPD, open)
B
10/11/2018
Violation issued (HPD, open)
I
11/14/2017
Violation issued (HPD, open)
I
10/31/2016
Violation issued (HPD, open)
I
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/13/2020
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/21/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/14/2020Fire-Resistant Penetrations and JointsANDREW GOODRICHspecial
12/14/2020HVAC and service water heating system controls ANDREW GOODRICHenergy_progress
12/14/2020HVAC and service water heating equipment ANDREW GOODRICHenergy_progress
12/14/2020Energy Code Compliance InspectionsANDREW GOODRICHprogress
12/09/2020Energy Code Compliance InspectionsYING JIANGprogress
12/09/2020HVAC and service water heating equipment YING JIANGenergy_progress
12/09/2020HVAC and service water heating system controls YING JIANGenergy_progress
12/09/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
11/20/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
11/20/2020HVAC and service water heating system controls YING JIANGenergy_progress
11/20/2020HVAC and service water heating equipment YING JIANGenergy_progress
11/20/2020Energy Code Compliance InspectionsYING JIANGprogress
10/27/2020HVAC and service water heating system controls YING JIANGenergy_progress
10/27/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
10/27/2020Energy Code Compliance InspectionsYING JIANGprogress
10/27/2020HVAC and service water heating equipment YING JIANGenergy_progress
09/03/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
09/03/2020HVAC and service water heating equipment YING JIANGenergy_progress
09/03/2020HVAC and service water heating system controls YING JIANGenergy_progress
09/03/2020Energy Code Compliance InspectionsYING JIANGprogress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing6
08/26/2026X00336023-I1Request digital key ↗
08/26/2026X00336023-P1Request digital key ↗
08/15/2026X00336023-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature14
09/19/2026X00336023-P5Open ↗
09/19/2026X00336023-P5Open ↗
09/19/2026X00336023-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026X00336023-I1Open ↗
08/26/2026X00336023-P3Open ↗
08/26/2026X00336023-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/19/2026X00336023-P5Open ↗
09/17/2026X00336023-P1Open ↗
09/01/2026X00336023-P4Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan6
08/13/2026X00336023-P2Open ↗
08/13/2026X00336023-P3Open ↗
08/13/2026X00336023-P4Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026X00336023-I1Open ↗
08/26/2026X00336023-P3Open ↗
08/26/2026X00336023-P2Open ↗
Showing 3 of 6 on file for this type