← Back
Over six families without stores
325 3 STREET
BROOKLYN · BIN 3020915
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6BZoning
8,132 sfGross Floor Area
8Units
Rent Stabilized40 Open Violations 39 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 325 THIRD STREET LLC · 2,533 sf lot · 3.21 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 2Under Construction10p · 1 filing · 20 docs
Floor 1Under Construction10p · 1 filing · 20 docs
CellarUnder Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
325 THIRD STREET1707/30/2026
DEPARTMENT OF EDUCATION103/22/2026
EQUINOX CONSULTING1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INGA CONSULTING ENGINEERS201/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC PAINTING CONTRACTING*General Contractor207/08/2026
JOHN HLAD P & H CO., INCPlumbing207/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416201/31/2025
Building Lifecycle
All (103)Filed (2)Permit Issued (4)Violation (60)Objection (22)Special Inspection (15)
07/29/2026
Permit issued — Plumbing
B01070060-S1-PL
05/20/2026
Permit issued — Mechanical Systems
B01070060-I1-GC-CX
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2025
Violation issued (HPD, open)
C
10/10/2025
Violation issued (HPD, open)
A
10/10/2025
Violation issued (HPD, open)
A
10/10/2025
Violation issued (HPD, open)
C
10/06/2025
Violation issued (HPD, closed)
C
10/06/2025
Violation issued (HPD, open)
B
10/06/2025
Violation issued (HPD, open)
B
08/15/2025
Violation issued (HPD, open)
B
06/05/2025
Violation issued (HPD, open)
A
05/21/2025
Permit issued — Plumbing
B01070060-S1-PL
05/19/2025
Violation issued (ECB, open)
Construction
04/25/2025
Objection raised — Plumbing
04/25/2025
Objection resolved — Addressed
04/18/2025
Objection resolved — Addressed
04/18/2025
Objection resolved — Addressed
04/18/2025
Objection resolved — Addressed
02/14/2025
Permit issued — Structural
B01070060-I1-GC-CX
02/03/2025
Objection raised — Admin
02/03/2025
Objection raised — Energy
02/03/2025
Objection raised — Plumbing
01/31/2025
Filed — Alteration
REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG. APARTMENT BLDG, WITH REBUILDING OF DAMAGED GWB NON-LOADBEARG. PARTITIONS. REPLACEMENT INTER. FINISHES. REPLACE DAMAGED SKYLIGHT GLAZING & MECH. VENTILATION @ BATHROOMS. REPAIRED WOOD FLR JOISTS.
B01070060-S1
01/14/2025
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
01/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
01/09/2025
Objection raised — Other
01/09/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
01/03/2025
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
01/03/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
12/20/2024
Violation issued (HPD, open)
B
12/20/2024
Violation issued (HPD, open)
B
12/20/2024
Violation issued (HPD, open)
B
11/26/2024
Violation issued (HPD, closed)
I
08/30/2024
Special inspection requirement — Wood – Seismic Resistance
ELIAS RASABI
08/29/2024
Objection raised — Fire_Protection
08/29/2024
Objection raised — Other
08/29/2024
Objection raised — Zoning
08/29/2024
Objection raised — Scope
08/29/2024
Objection raised — Inspections
08/29/2024
Objection raised — Other
08/23/2024
Filed — Alteration
REPAIR & RECONSTRUCTION OF EXT'G FIRE-DAMAGED AREAS IN EXTG. APARTMENT BLDG, WITH REBUILDING OF DAMAGED GWB NON-LOADBEARG. PARTITIONS. REPLACEMENT INTER. FINISHES. REPLACE DAMAGED SKYLIGHT GLAZING & MECH. VENTILATION @ BATHROOMS. REPAIRED WOOD FLR JOISTS.
B01070060-I1
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
08/23/2024
Special inspection requirement — Structural Wood Frame
ELIAS RASABI
08/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
08/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
06/28/2024
Special inspection requirement — Structural Cold-Formed Steel
ELIAS RASABI
06/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
06/21/2024
Special inspection requirement — Final
ELIAS RASABI
06/21/2024
Special inspection requirement — Mechanical Systems
ELIAS RASABI
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN HLAD P & H CO., INC07/29/2026
DOB NOWMechanical SystemsPermit IssuedNYC PAINTING CONTRACTING*05/20/2026
DOB NOWPlumbingPermit IssuedJOHN HLAD P & H CO., INC05/21/2025
DOB NOWStructuralPermit IssuedNYC PAINTING CONTRACTING*02/14/2025
BIS—ISSUEDTROOPER CONSTRUCTION LLC05/08/2017
BIS—RE-ISSUEDTROOPER CONSTRUCTION LLC03/15/2016
BIS—ISSUEDTROOPER CONSTRUCTION LLC04/21/2015
BISOTISSUEDTROOPER CONSTRUCTION LLC01/11/2013
BISPLISSUEDSTANLEY LEWIS CONTRG CORP08/31/2010
BIS—ISSUEDTROOPER CONSTRUCTION LLC03/31/2010
BISPLISSUEDSTANLEY LEWIS CONTRG CORP06/01/2009
BIS—ISSUEDTROOPER CONSTRUCTION LLC05/08/2009
BIS—ISSUEDTROOPER CONST LLC03/03/2008
BIS—ISSUEDTROOPER CONST LLC04/10/2007
BIS—ISSUEDTROOPER CONST LLC10/19/2005
BISSPISSUEDFIVE BOROUGH NYC LLC08/30/2005
BISPLISSUEDRELIABLE PLBG & HTG CORP08/10/2005
BIS—ISSUEDTROOPER CONST LLC10/20/2004
BISOTISSUEDTROOPER CONSTRUCTION LLC07/28/2004
BISPLISSUEDWADE PLBG & HTG12/04/2001
1 project · most recent 01/31/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/31/2025Permit IssuedJOHN HLAD P & H CO., INCGas, Water/Sanitary
1 project · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026Permit IssuedA & R ELEC'L CONTR'G INC.General Wiring
1 project · most recent 01/31/2025
Wood
FiledStatusContractorScope
01/31/2025Permit IssuedJOHN HLAD P & H CO., INCWood
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/14/2025Energy Code Compliance InspectionsELIAS RASABIprogress
01/14/2025HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
01/03/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
01/03/2025Lighting in dwelling unitsELIAS RASABIenergy_progress
01/03/2025Lighting controlsELIAS RASABIenergy_progress
08/30/2024Wood – Seismic ResistanceELIAS RASABIspecial
08/23/2024Energy Code Compliance InspectionsELIAS RASABIprogress
08/23/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
08/23/2024Structural Wood FrameELIAS RASABIprogress
08/02/2024Tenant Protection Plan ComplianceELIAS RASABIspecial
08/02/2024Tenant Protection Plan ComplianceELIAS RASABIspecial
06/28/2024Structural Cold-Formed SteelELIAS RASABIspecial
06/28/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
06/21/2024FinalELIAS RASABIprogress
06/21/2024Mechanical SystemsELIAS RASABIspecial
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01070060-S1Request digital key ↗
08/23/2026B01070060-I1Request digital key ↗
08/23/2026B01070060-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
04/28/2015301286347Open ↗
04/16/2015301286347Open ↗
12/14/2012320689331Open ↗
▸BISWORK PERMIT APPLICATION2
05/09/2017301286347Open ↗
01/14/2013320689331Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026B01070060-P1Open ↗
09/29/2026B01070060-P1Open ↗
09/01/2026B01070060-S1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/10/2013320689331Open ↗
01/14/2013320689331Open ↗
01/09/2013320689331Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01070060-S1Open ↗
08/23/2026B01070060-I1Open ↗
08/23/2026B01070060-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01070060-S1Open ↗
08/25/2026B01070060-I1Open ↗
08/23/2026B01070060-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01070060-I1Open ↗
08/23/2026B01070060-P2Open ↗
08/23/2026B01070060-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/14/2012320689331Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/10/2013320689331Open ↗
01/14/2013320689331Open ↗
01/09/2013320689331Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
05/10/2013320689331Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/15/2017301286347Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/14/2012320689331Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/10/2013320689331Open ↗
12/14/2012320689331Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
09/07/2017301286347Open ↗
04/02/2015301694183Open ↗
▸BISBOROUGH INTAKE FORM1
09/15/2017301286347Open ↗
▸BISEFILING COVER SHEET1
12/14/2012320689331Open ↗