Single or multiple dwelling with stores or offices
325 BROOME STREET
MANHATTAN · Lower East Side · BIN 1005642
💬 Discuss this project
1900Year Built
5Stories
S9Building Class
C6-3AZoning
6,750 sfGross Floor Area
7Units
Rent Stabilized11 Open Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: 325 MANAGEMENT CORP · 1,908 sf lot · 3.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 2 docs
Floor 55p · 1 filing · 3 docs
Floor 45p · 1 filing · 3 docs
Floor 36p · 2 filings · 10 docs
Floor 25p · 1 filing · 3 docs
Floor 15p · 1 filing · 3 docs
Cellar11p · 1 filing · 19 docs
Basement2p · 1 filing · 5 docs
Sub-Basement2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILDING EQUITY MANAGEMENT1204/09/2026
ZORIA CONSTRUCTION NY503/22/2026
325 MANAGEMENT1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BDP EXPEDITERS GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORA BROTHERS CONSTRUCTIOGeneral Contractor303/21/2026
JUNO CONTRACTING CORPGeneral Contractor203/21/2026
ZORIA CONSTRUCTION NY INC.General Contractor203/21/2026
FRIED ELECTRIC CO.Electrical103/22/2026
THE RINALDI GROUP OF NYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECNICO SPECIAL INSPECTIO5939303/04/2025
SWL ENGINEERING INSPECTIO6912101/15/2025
JOSEPH BOTTA, PE, PC1139107/25/2023
O'ROURKE ENGINEERING, LLC5873107/25/2023
MJE CONSULTING ENGINEERIN8522106/22/2023
Building Lifecycle
All (68)Filed (7)Permit Issued (4)Signed Off (1)Violation (24)Objection (2)Special Inspection (30)
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
A
05/08/2026
Objection resolved — Addressed
05/01/2026
Objection raised — Other
04/08/2026
Filed — Alteration
Limited Exterior Repairs at the North and South. No change to use, egress, or occupancy.
M01357942-I1
02/10/2026
Special inspection requirement — Final
02/10/2026
Special inspection requirement — Masonry
02/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
12/02/2025
Violation issued (ECB, open)
Construction
08/11/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2025
Permit issued — Structural
M01146294-I1-ST
03/27/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/05/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jose Lockhart
03/05/2025
Special inspection requirement — Structural Steel - Welding
Jose Lockhart
03/05/2025
Special inspection requirement — Subgrade Inspections
Jose Lockhart
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Lockhart
03/05/2025
Special inspection requirement — Underpinning
Jose Lockhart
03/05/2025
Special inspection requirement — Final
Jose Lockhart
03/05/2025
Special inspection requirement — Footing and Foundation
Jose Lockhart
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jose Lockhart
03/05/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Jose Lockhart
03/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Jose Lockhart
03/04/2025
Filed — Alteration
Foundation wall repairs and emergency parging work. No change to use egress or occupancy
M01146290-P2
02/21/2025
Filed — Alteration
Foundation wall repairs and emergency parging work. No change to use egress or occupancy
M01146290-P1
02/18/2025
Special inspection requirement — Structural Steel - Welding
02/18/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/18/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/17/2025
Special inspection requirement — Underpinning
Jose Lockhart
02/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Lockhart
02/17/2025
Special inspection requirement — Final
Jose Lockhart
02/17/2025
Special inspection requirement — Footing and Foundation
Jose Lockhart
01/15/2025
Filed — Alteration
Emergency temporary shoring work and permanent structural repairs. No change to use egress or occupancy
M01146294-I1
01/15/2025
Permit issued — Foundation
M01146290-I1-FO
01/08/2025
Filed — Alteration
Foundation wall repairs and emergency parging work. No change to use egress or occupancy
M01146290-I1
12/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
12/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Levon Shaginyan
12/17/2024
Special inspection requirement — Wood – Seismic Resistance
JOSHUA LUCKRITZ
12/17/2024
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
11/21/2024
Special inspection requirement — Final
Levon Shaginyan
11/06/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2024
Signed off — Alteration
INTERIOR RENOVATION OF APT 3 ON THE 3RD FLOOR. NEW PARTITIONS, DOORS & FINISHES PER PLANS. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY
M00891390-I1
08/28/2023
Permit issued — General Construction
M00891390-I1-GC
07/25/2023
Filed — Alteration
INTERIOR RENOVATION OF APT 3 ON THE 3RD FLOOR. NEW PARTITIONS, DOORS & FINISHES PER PLANS. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY
M00891390-I1
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
06/29/2023
Special inspection requirement — Lighting in dwelling units
Leslie Barnett
06/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
Leslie Barnett
06/27/2023
Permit issued — General Construction
M00883743-I1-GC
06/22/2023
Filed — Alteration
M00883743-I1
09/26/2021
Violation issued (HPD, closed)
A
09/26/2021
Violation issued (HPD, closed)
B
09/26/2021
Violation issued (HPD, closed)
A
09/26/2021
Violation issued (HPD, closed)
B
09/26/2021
Violation issued (HPD, closed)
B
09/26/2021
Violation issued (HPD, closed)
C
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJUNO CONTRACTING04/02/2025
DOB NOWFoundationPermit IssuedTHE RINALDI GROUP OF NY01/15/2025
DOB NOWGeneral ConstructionSigned-offMORA BROTHERS CONSTRUCTIO08/28/2023
DOB NOWGeneral ConstructionPermit IssuedZORIA CONSTRUCTION NY INC06/27/2023
BISEQISSUEDROCK SCAFFOLDING CORP05/07/2010
BISOTISSUEDDAFFODIL GENERAL CONTRACTING04/01/2010
BISOTISSUEDDAFFODIL GENERAL CONTRACTING03/25/2010
BISFBISSUEDGEECEE MECH. SVCS INC.12/27/2005
BISFBISSUEDNEAL M. RUDIKOFF12/23/1996
1 project · most recent 08/07/2024
General Wiring
FiledStatusContractorScope
08/07/2024Permit IssuedFRIED ELECTRIC CO.General Wiring
2 projects · most recent 03/04/2025
Wood
FiledStatusContractorScope
03/04/2025Permit IssuedTHE RINALDI GROUP OF NY3 scope_items
01/15/2025Permit IssuedJUNO CONTRACTING CORPWood
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
02/10/2026Final—progress
02/10/2026Masonry—special
02/10/2026Tenant Protection Plan Compliance—special
03/05/2025Excavations - Sheeting, Shoring, and BracingJose Lockhartspecial
03/05/2025Structural Steel - WeldingJose Lockhartspecial
03/05/2025Subgrade InspectionsJose Lockhartspecial
03/05/2025Structural Stability – Alterations of existing buildingsJose Lockhartspecial
03/05/2025UnderpinningJose Lockhartspecial
03/05/2025FinalJose Lockhartprogress
03/05/2025Footing and FoundationJose Lockhartprogress
03/05/2025Tenant Protection Plan ComplianceJose Lockhartspecial
03/05/2025Subsurface Conditions – Fill Placement & In-Place DensityJose Lockhartspecial
03/05/2025Concrete - Cast-In-PlaceJose Lockhartspecial
02/18/2025Structural Steel - Welding—special
02/18/2025Subsurface Conditions – Fill Placement & In-Place Density—special
02/18/2025Excavations - Sheeting, Shoring, and Bracing—special
02/17/2025Tenant Protection Plan Compliance—special
02/17/2025UnderpinningJose Lockhartspecial
02/17/2025Structural Stability – Alterations of existing buildingsJose Lockhartspecial
02/17/2025FinalJose Lockhartprogress
02/17/2025Footing and FoundationJose Lockhartprogress
12/17/2024Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
12/17/2024Fire-Resistance Rated ConstructionLevon Shaginyanprogress
12/17/2024Wood – Seismic ResistanceJOSHUA LUCKRITZspecial
12/17/2024Post-installed AnchorsJOSHUA LUCKRITZspecial
Latest 25 of 33.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/30/2026M00883743-I1Request digital key ↗
08/29/2026M00891390-I1Request digital key ↗
08/25/2026M01146294-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
07/08/2010120405034Open ↗
07/08/2010120405034Open ↗
04/05/2010120132356Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
02/01/2019101456112Open ↗
07/08/2010120405034Open ↗
05/07/2010120343814Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026M00891390-I1Open ↗
08/30/2026M00891390-I1Open ↗
08/25/2026M01146290-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
09/22/2010120132356Open ↗
09/22/2010120132356Open ↗
09/03/2010120405034Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/30/2026M00883743-I1Open ↗
08/25/2026M01146294-I1Open ↗
08/18/2026M01357942-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/30/2026M00891390-I1Open ↗
08/30/2026M00891390-I1Open ↗
08/25/2026M01146290-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/08/2010120405034Open ↗
05/07/2010120343814Open ↗
08/13/2009120126602Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/08/2010120405034Open ↗
05/07/2010120343814Open ↗
08/13/2009120126602Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/30/2026M00883743-I1Open ↗
08/25/2026M01146294-I1Open ↗
08/13/2026M00891390-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
09/10/2009120132356Open ↗
09/10/2009120132356Open ↗
07/08/2010120405034Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
08/18/2009120132356Open ↗
08/13/2009120126602Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
05/07/2010120343814Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
07/08/2010120405034Open ↗
05/07/2010120343814Open ↗
08/18/2009120132356Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
09/22/2010120132356Open ↗
09/10/2010120132356Open ↗
09/10/2010120132356Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
09/22/2010120132356Open ↗
09/03/2010120405034Open ↗
08/28/2010120132356Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
07/08/2010120405034Open ↗
08/18/2009120132356Open ↗
08/13/2009120126602Open ↗
▸BISeFiling Job Application Cover Sheet1
05/07/2010120343814Open ↗
▸BISBOROUGH INTAKE FORM1
02/01/2019101456112Open ↗