← Back
BuildNYC
Elevator cooperative
325 EAST 57TH STREET
MANHATTAN · BIN 1040000
💬 Discuss this project
1929Year Built
15Stories
D4Building Class
R10Zoning
92,593 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized20 Active Violations 19 unresolved · 1 paperwork only 4 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 325 Tenants Corp - C\O B.H.S. Management · 8,234 sf lot · 11.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade repairs1p · 1 filing · 8 docs
Floor 15Unit 15B9p · 1 filing · 19 docs
Floor 14
Floor 13
Floor 12
Floor 11Unit 11DUnder Construction12p · 1 filing · 10 docs
Floor 10
Floor 9Unit 9C3p · 1 filing · 8 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Unit 4A7p · 1 filing · 7 docs
Floor 3
Floor 2
Floor 1
CellarInstall new fuel storage tank3p · 1 filing · 9 docs
Site & exteriorFacade repairs11p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
325 Tenants3203/22/2026
BHS703/22/2026
Eberhart Brothers603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sustainable Design Engineering205/21/2026
Brendan Kelly312/22/2025
Miriam Daniel210/04/2024
New Age105/16/2024
Lawless & Mangione211/04/2022
Paul Perdek, Prof. Engineering111/11/2021
A2 Architect203/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code603/21/2026
J A Expediting803/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyline Restorationspecialty_contractor603/21/2026
NYC RemoldersGeneral Contractor303/21/2026
Cosme Plumbing & HeatingPlumbing207/08/2026
Powers Bridging & ScaffoldingScaffold107/08/2026
HI-Tech Plumbing & HeatingPlumbing107/08/2026
Plumbing P & HPlumbing107/22/2026
Judd ElectricElectrical103/21/2026
Samuel & Sons P & HPlumbing107/08/2026
Gibco ConstructionGeneral Contractor107/10/2026
GMG Home ServicesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sustainable Design Engineering1404105/21/2026
Architecture and5545212/22/2025
New Age Engineering7746205/16/2024
NY Restoration Technology6187211/04/2022
Building Lifecycle
All (137)Filed (13)Permit Issued (13)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (6)Objection (5)Special Inspection (19)
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
C
08/26/2026
Violation issued (HPD, open)
B
08/17/2026
Cycle 10 facade report submitted
07/31/2026
Cycle 10 facade inspection completed
07/21/2026
Permit issued — Plumbing
M01393577-S1-PL
07/08/2026
Permit issued — General Construction
M01393577-I1-GC
06/17/2026
Objection resolved — Resolved
06/08/2026
Objection raised — Scope
06/05/2026
Objection raised — Scope
06/04/2026
Cycle 10 facade report signed — SWARMP
05/21/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 11D ON THE 11TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW KITCHEN AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01393577-I1
05/21/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 11D ON THE 11TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW KITCHEN AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01393577-S1
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
04/28/2026
Special inspection requirement — Lighting in dwelling units
Kenny Mak
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
04/27/2026
Special inspection requirement — Final
Kayan Tse
03/06/2026
Signed off — Alteration
RENOVATION OF APARTMENTS 15B ON THE FIFTEENTH FLOOR. GENERAL CONSTRUCTION WORK TYPE. NO CHANGE TO USE OR OCCUPANCY
M01214299-S1
02/06/2026
Signed off — Alteration
RENOVATION OF APARTMENTS 15B ON THE FIFTEENTH FLOOR. GENERAL CONSTRUCTION WORK TYPE. NO CHANGE TO USE OR OCCUPANCY
M01214299-I1
01/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brendan Kelly
12/22/2025
Filed — Alteration
RENOVATION OF APARTMENTS 15B ON THE FIFTEENTH FLOOR. GENERAL CONSTRUCTION WORK TYPE. NO CHANGE TO USE OR OCCUPANCY
M01214299-P1
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brendan Kelly
12/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2025
Permit issued — Plumbing
M01214299-S1-PL
07/25/2025
Permit issued — General Construction
M01214299-I1-GC
07/02/2025
Objection resolved — Addressed
07/01/2025
Objection raised — Scope
06/16/2025
Filed — Alteration
RENOVATION OF APARTMENTS 15B ON THE FIFTEENTH FLOOR. GENERAL CONSTRUCTION WORK TYPE. NO CHANGE TO USE OR OCCUPANCY
M01214299-S1
06/16/2025
Filed — Alteration
RENOVATION OF APARTMENTS 15B ON THE FIFTEENTH FLOOR. GENERAL CONSTRUCTION WORK TYPE. NO CHANGE TO USE OR OCCUPANCY
M01214299-I1
06/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Brendan Kelly
04/22/2025
Special inspection requirement — Lighting in dwelling units
Brendan Kelly
04/22/2025
Special inspection requirement — Final
Brendan Kelly
04/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Brendan Kelly
04/22/2025
Special inspection requirement — Lighting controls
Brendan Kelly
12/17/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/16/2024
Signed off — Alteration
M01117329-I1
12/16/2024
Signed off — Alteration
M01117329-S1
12/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/31/2024
Permit issued — Plumbing
M01117329-S1-PL
10/28/2024
Permit issued — General Construction
M01117329-I1-GC
10/16/2024
Violation issued (HPD, open)
B
10/16/2024
Violation issued (HPD, open)
C
10/16/2024
Violation issued (HPD, open)
B
10/16/2024
Violation issued (HPD, open)
B
10/16/2024
Violation issued (HPD, open)
B
10/04/2024
Filed — Alteration
M01117329-I1
10/04/2024
Filed — Alteration
M01117329-S1
09/25/2024
Special inspection requirement — Insulation placement and R values
Miriam Hubbard
09/25/2024
Special inspection requirement — Lighting in dwelling units
Miriam Hubbard
09/25/2024
Special inspection requirement — Lighting controls
Miriam Hubbard
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Miriam Hubbard
09/25/2024
Special inspection requirement — Final
Miriam Hubbard
05/29/2024
Permit issued — Boiler Equipment
M01035256-I1-BE
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPlumbing P & H07/21/2026
DOB NOWGeneral ConstructionPermit IssuedGibco Construction07/08/2026
DOB NOWPlumbingSigned-offHI-Tech Plumbing & Heating07/28/2025
DOB NOWGeneral ConstructionSigned-offNYC Remolders07/25/2025
DOB NOWPlumbingSigned-offSamuel & Sons P & H10/31/2024
DOB NOWGeneral ConstructionSigned-offGMG Home Services10/28/2024
DOB NOWBoiler EquipmentSigned-offChampion Combustion05/29/2024
DOB NOWGeneral ConstructionSigned-offSkyline Restoration11/30/2022
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/22/2022
DOB NOWSidewalk ShedPermit IssuedPowers Bridging & Scaffol11/15/2021
DOB NOWGeneral ConstructionSigned-offSkyline Restoration11/01/2021
DOB NOWPlumbingSigned-offCosme Plumbing & Heating03/30/2021
DOB NOWPlumbingSigned-offCosme Plumbing & Heating12/02/2019
BISPLISSUEDMcManus Mechanical Maintenance P&H12/21/2023
BISOTISSUEDArk Design & Build11/12/2020
BISOTISSUEDO This Way Up 311/14/2019
BISPLISSUEDBranch Plumbing08/23/2018
BISPLISSUEDThe Plumbing & Heating Specialist08/20/2018
BISOTISSUEDGNS Home Improvment07/12/2018
BISMHISSUEDThink Construction04/22/2016
BISPLRE-ISSUEDDonato Plumbing Group03/23/2016
BISPLISSUEDAbsolute Plumbing & Heating & Mechanical11/12/2015
BISPLISSUEDEnobrac Plumbing04/09/2015
BISOTISSUEDSimply Elegant General Co04/03/2015
BISPLISSUEDDonato03/24/2015
BISOTISSUEDThink Construction03/16/2015
BISEQISSUEDDynamic Bridge & Scaffold11/09/2012
BISPLISSUEDThe Big IC05/25/2012
BISOTISSUEDEberhart Brothers05/24/2012
BISPLISSUEDTime Mechanicals11/29/2011
BISOTISSUEDVan-Gogh Painting11/07/2011
BISOTISSUEDXL Renovation & Painting07/18/2011
BISOTISSUEDAM&G Waterproofing05/09/2011
BISOTISSUEDEberhart Brothers03/23/2010
BISOTISSUEDEberhart Brothers01/06/2010
BISOTISSUEDEberhart Brothers11/25/2009
BISPLISSUEDThe Big IC11/25/2009
BISEQISSUEDAM&G Waterproofing09/30/2009
BISOTISSUEDAM&G Waterproofing08/13/2009
BISOTISSUEDAM&G Waterproofing06/18/2009
+ 23 more permits on file
1 project · most recent 05/21/2026
Water/Sanitary
FiledStatusContractorScope
05/21/2026Permit IssuedPlumbing P & HWater/Sanitary
5 projects · most recent 02/13/2026
General Wiring
FiledStatusContractorScope
02/13/2026CompleteQueensboro Electrical ContractingGeneral Wiring
02/17/2023CompleteE-J Electric Installation CoGeneral Wiring
11/04/2021CompleteOptimal Electric—
01/29/2020CompleteT. McCaffrey-T. McGovernGeneral Wiring
08/03/2018CompleteUS1 ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/28/2026Energy Code Compliance InspectionsKenny Makprogress
04/28/2026Lighting in dwelling unitsKenny Makenergy_progress
04/28/2026Fire-Resistant Penetrations and JointsKenny Makspecial
04/27/2026FinalKayan Tseprogress
12/23/2025Fire-Resistant Penetrations and JointsBrendan Kellyspecial
12/11/2025Fire-Resistant Penetrations and JointsBrendan Kellyspecial
06/13/2025Energy Code Compliance InspectionsBrendan Kellyprogress
04/22/2025Lighting in dwelling unitsBrendan Kellyenergy_progress
04/22/2025FinalBrendan Kellyprogress
04/22/2025Fire-Resistance Rated ConstructionBrendan Kellyprogress
04/22/2025Lighting controlsBrendan Kellyenergy_progress
09/25/2024Insulation placement and R valuesMiriam Hubbardenergy_progress
09/25/2024Lighting in dwelling unitsMiriam Hubbardenergy_progress
09/25/2024Lighting controlsMiriam Hubbardenergy_progress
09/25/2024Energy Code Compliance InspectionsMiriam Hubbardprogress
09/25/2024FinalMiriam Hubbardprogress
05/16/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
04/12/2024Tenant Protection Plan ComplianceStephen Shishkospecial
04/12/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Shishkospecial
▾Documents — 335 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
09/03/2026M00625672-I1Request digital key ↗
09/01/2026M00582505-I1Request digital key ↗
09/01/2026M00582505-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00241169-P1Request digital key ↗
09/05/2026M00241169-I1Request digital key ↗
▸Applications & Permits63
▸BISPLAN / WORK APPROVAL APPLICATION33
11/17/2023121079723Open ↗
11/06/2023121079723Open ↗
08/19/2021101934962Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION30
12/21/2023121079723Open ↗
12/04/2023121079723Open ↗
11/12/2020140937743Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications74
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
10/15/2019123884485Open ↗
12/05/2018140776300Open ↗
04/18/2016122240208Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/05/2026M00241169-I1Open ↗
09/05/2026M00241169-P1Open ↗
09/03/2026M00625672-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
10/03/2026M01393577-I1Open ↗
10/03/2026M01393577-I1Open ↗
10/03/2026M01393577-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/03/2026M01393577-I1Open ↗
09/23/2026M01035256-I1Open ↗
09/23/2026M01035256-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/14/2012121408592Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/14/2015122240208Open ↗
11/14/2012121408592Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/15/2020140923534Open ↗
06/21/2018140776300Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/18/2020140937743Open ↗
07/15/2020140923534Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/15/2020140923534Open ↗
06/21/2018140776300Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/18/2020140937743Open ↗
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE9
11/19/2015122263870Open ↗
07/16/2015122240208Open ↗
05/12/2015122263870Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
06/21/2018140776300Open ↗
01/14/2015122240208Open ↗
05/17/2012121079723Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/06/2016122240208Open ↗
04/04/2016122240208Open ↗
12/02/2015122263870Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES4
10/11/2020140937743Open ↗
07/15/2020140923534Open ↗
06/21/2018140776300Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00241169-I1Open ↗
09/05/2026M00241169-P1Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00241169-I1Open ↗
09/05/2026M00241169-P1Open ↗
09/01/2026M00582505-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
05/17/2012121079723Open ↗
05/23/2011120695391Open ↗
04/15/2011120635394Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
08/18/2020140937743Open ↗
07/15/2020140923534Open ↗
10/15/2019123884485Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
11/14/2012121408592Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/21/2018140776300Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/31/2023121079723Open ↗
12/31/2023121079723Open ↗
12/21/2023121079723Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/14/2019123884485Open ↗
10/15/2019123884485Open ↗
03/16/2016122263870Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/02/2021140937743Open ↗
12/05/2018140776300Open ↗
04/18/2016122240208Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/18/2020140937743Open ↗
07/15/2020140923534Open ↗
06/21/2018140776300Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/31/2023121079723Open ↗
03/11/2021123884485Open ↗
▸BISTR8: Energy Code Progress Inspections2
03/09/2015122263870Open ↗
01/14/2015122240208Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/02/2024121079723Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/17/2012121079723Open ↗
▸BISNYCECC ANALYSIS1
06/21/2018140776300Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY12
11/29/2023121079723Open ↗
11/17/2023121079723Open ↗
08/25/2021101934962Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
01/03/2024121079723Open ↗
08/25/2021101934962Open ↗
03/11/2021123884485Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
11/14/2012121408592Open ↗
05/17/2012121079723Open ↗
05/23/2011120695391Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/23/2021101934962Open ↗
03/16/2016122263870Open ↗
03/16/2016122263870Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
12/21/2023121079723Open ↗
08/24/2018140776300Open ↗
03/30/2016122240208Open ↗
▸BISFINAL1
01/02/2024121079723Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT25
03/11/2021123884485Open ↗
03/02/2021140937743Open ↗
08/18/2020140937743Open ↗
Showing 3 of 25 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
05/24/2012121079723Open ↗
05/24/2012121079723Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/30/2023121079723Open ↗
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET11
10/15/2019123884485Open ↗
02/10/2015122263870Open ↗
01/14/2015122240208Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
02/25/2021140937743Open ↗
10/11/2020140937743Open ↗
03/06/2020123884485Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/18/2020140937743Open ↗
07/15/2020140923534Open ↗
06/21/2018140776300Open ↗
▸BISBOROUGH INTAKE FORM1
12/05/2018140776300Open ↗
▸Other Documents9
▸DOB NOWDHCR Document5
08/13/2026M01214299-S1Open ↗
08/13/2026M01214299-P1Open ↗
08/13/2026M00582505-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
10/13/2020140937743Open ↗
10/13/2020140937743Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type