325 EAST 80TH STREET
MANHATTAN · BIN 1049813
💬 Discuss this project
1940Year Built
6Stories
D4Building Class
R8BZoning
43,602 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMP
Elevator cooperative · Owner of record: 325 East 80th Apt · 10,217 sf lot · 4.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof deck framing and layout3p · 1 filing · 3 docs
Floor 5Unit 5GH6p · 5 filings · 20 docs
Floor 4
Floor 3Unit 3C7p · 2 filings · 12 docs
Floor 2
Floor 1
CellarPlymouth Management Group, INC.14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
325 East 80th St Apts1103/22/2026
Chapter103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Frame Design Corps106/15/2026
Reform Architecture309/03/2025
New York & Company410/10/2024
TMF Electrical Contracting409/13/2022
Ira Frazin Architect208/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company803/21/2026
Jenny Flores Expediting303/21/2026
Municipal Building Consultants203/21/2026
Code803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cornerstone Contracting*General Contractor603/21/2026
Creative Plumbing inPlumbing207/08/2026
Bisantz Electric CoElectrical103/21/2026
Bayside Electrical ContElectrical103/21/2026
Norlin Electrical ContractorsElectrical103/21/2026
Samaras NickElectrical103/21/2026
A & J Contractors CoGeneral Contractor106/27/2026
Beam EnterprisesGeneral Contractor107/08/2026
Hello ChapterGeneral Contractor107/08/2026
A & C Heating ServicesPlumbing107/08/2026
ApecPlumbing107/08/2026
Fiu Corp Dba Fiu ElectricElectrical103/22/2026
Odyssey Plumbing & HeatingPlumbing107/08/2026
JLC Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Frame Design and Construction7971106/15/2026
New York Engineering Associates851410/10/2024
Ira Frazin Architect3318208/15/2022
Standing Architecture2722205/31/2022
Building Lifecycle
All (129)Filed (14)Permit Issued (11)Signed Off (9)Facade (FISP) (13)Violation (41)Inspection (11)Special Inspection (30)
06/25/2026
Permit issued — General Construction
M01415737-I1-GC
06/15/2026
Filed — Alteration
FILE APPLICATION TO REPLACE/REPAIR WOOD DECK ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01415737-I1
02/12/2026
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3C (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00913654-I1
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2025
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3C (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00913654-P1
07/01/2025
Permit issued — Plumbing
M00913654-I1-PL
06/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/19/2025
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3C. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00912777-I1
11/25/2024
Signed off — Alteration
REGISTER GAS FIRED HOT WATER BOILER ORIGINALLY FILED AS A HEATER UNDER 102944414
M01033060-I1
11/25/2024
Signed off — Alteration
REGISTER GAS FIRED HOT WATER BOILER ORIGINALLY FILED AS A HEATER UNDER 102944414
M01033060-S1
11/22/2024
Violation issued (HPD, closed)
I
10/24/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/10/2024
Filed — Alteration
REGISTER GAS FIRED HOT WATER BOILER ORIGINALLY FILED AS A HEATER UNDER 102944414
M01033060-P1
10/10/2024
Filed — Alteration
REGISTER GAS FIRED HOT WATER BOILER ORIGINALLY FILED AS A HEATER UNDER 102944414
M01033060-P2
10/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/10/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
10/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/10/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
10/10/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
10/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/10/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
10/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/10/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
08/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/16/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
08/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/16/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
08/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/16/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
08/16/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
08/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/16/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
07/16/2024
Cycle 9 facade report signed — SWARMP
05/03/2024
Permit issued — Boiler Equipment
M01033060-S1-BE
05/03/2024
Permit issued — Boiler Equipment
M01033060-I1-BE
04/26/2024
Filed — Alteration
REGISTER GAS FIRED HOT WATER BOILER ORIGINALLY FILED AS A HEATER UNDER 102944414
M01033060-I1
04/26/2024
Filed — Alteration
REGISTER GAS FIRED HOT WATER BOILER ORIGINALLY FILED AS A HEATER UNDER 102944414
M01033060-S1
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade inspection completed
11/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/13/2023
Permit issued — Plumbing
M00913654-I1-PL
09/06/2023
Permit issued — General Construction
M00912777-I1-GC
08/11/2023
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3C (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00913654-I1
08/11/2023
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3C. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00912777-I1
08/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Dionisio Cortes Ortega
08/01/2023
Special inspection requirement — Final
Dionisio Cortes Ortega
08/01/2023
Special inspection requirement — Interior lighting power
Dionisio Cortes Ortega
12/06/2022
Signed off — Alteration
M00666545-I1
12/06/2022
Signed off — Alteration
RENOVATION OF EXISTING APARTMENT WITH INTERIOR PARTITIONS AND PLUMBING AS PER PLAS. NO CHANGE OF USE, OCCUPANCY OR EGRESS
M00666570-I1
12/06/2022
Signed off — Alteration
M00666601-I1
10/19/2022
Permit issued — Mechanical Systems
M00666601-I1-MS
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA & J Contractors Co06/25/2026
DOB NOWPlumbingSigned-offAB Plumbing07/01/2025
DOB NOWBoiler EquipmentSigned-offDMC Plumbing & Heating05/03/2024
DOB NOWBoiler EquipmentSigned-offA&C Heating Services05/03/2024
DOB NOWPlumbingSigned-offAB Plumbing09/13/2023
DOB NOWGeneral ConstructionSigned-offHello Chapter09/06/2023
DOB NOWMechanical SystemsPermit IssuedCornerstone Contracting*10/19/2022
DOB NOWPlumbingSigned-offApec09/14/2022
DOB NOWGeneral ConstructionSigned-offBeam Enterprises09/09/2022
DOB NOWPlumbingSigned-offOdyssey Plumbing & Heating07/08/2022
DOB NOWGeneral ConstructionSigned-offCornerstone Contracting*06/10/2022
BISPLISSUEDHydrokinetic Plumbing & Heating I11/29/2017
BISOTISSUEDR & F Construction10/10/2017
BISPLISSUEDGW Mechanical08/08/2016
BISPLISSUEDGW Mechanical05/21/2015
BISOTISSUEDFinix U.S.A. Construction04/30/2015
BISEQISSUEDEverest Scaffolding03/10/2015
BISPLISSUEDHydrokinetic Plumbing & Heating I11/20/2014
BISOTISSUEDR & F Construction09/12/2014
BISOTISSUEDGalicia Contracting & Restoration09/05/2014
BISEQISSUEDEverest Scaffolding03/20/2014
BISEQISSUEDEverest Scaffolding03/26/2013
BISPLISSUEDKinetic Mechanical10/14/2008
BISMHISSUEDR & F Construction10/06/2008
BISOTISSUEDPinnacle Restoration05/24/2006
BISPLISSUEDAD Plumbing02/02/2001
8 projects · most recent 04/11/2025
General Wiring Boiler Controls
FiledStatusContractorScope
04/11/2025CompleteGramercy ElectricGeneral Wiring
06/27/2024CompleteSTX ElectricalBoiler Controls
06/27/2024CompleteWCK ElectricGeneral Wiring
09/14/2023CompleteFiu Corp Dba Fiu Electric—
07/05/2022CompleteIkaros Electrical EnterprisesGeneral Wiring
03/02/2022CompleteMLS ElectricGeneral Wiring
07/31/2018CompleteJLC Electrical ContractingGeneral Wiring
05/22/2018Permit IssuedAda ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
10/10/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/10/2024Heating SystemsLOUIS ARENAspecial
10/10/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/10/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
10/10/2024Maintenance informationLOUIS ARENAenergy_progress
10/10/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/10/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/10/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/10/2024Heating SystemsLOUIS ARENAspecial
10/10/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/10/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/10/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/10/2024Maintenance informationLOUIS ARENAenergy_progress
08/16/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/16/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/16/2024Maintenance informationLOUIS ARENAenergy_progress
08/16/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/16/2024Maintenance informationLOUIS ARENAenergy_progress
08/16/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/16/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/16/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/16/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/16/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
08/16/2024Heating SystemsLOUIS ARENAspecial
08/16/2024Tenant Protection Plan Compliance—special
Latest 25 of 32.
▾Documents — 187 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00666570-I1Request digital key ↗
09/02/2026M00666570-P1Request digital key ↗
09/02/2026M00666601-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION14
09/12/2017122465885Open ↗
09/12/2017122465885Open ↗
08/10/2017122005454Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION13
11/30/2017122465885Open ↗
10/11/2017122465885Open ↗
06/09/2015122258421Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026M01033060-S1Open ↗
09/23/2026M01033060-I1Open ↗
09/23/2026M01033060-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
06/07/2018122005454Open ↗
06/07/2018122005454Open ↗
09/28/2017122465885Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026M00666570-I1Open ↗
09/02/2026M00666570-P1Open ↗
09/02/2026M00666601-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026M01033060-I1Open ↗
09/23/2026M01033060-S1Open ↗
09/23/2026M01033060-I1Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/26/2013140065284Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/26/2013140065284Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/26/2013140065284Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
09/12/2017122465885Open ↗
05/04/2017122258421Open ↗
04/28/2017122258421Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
05/13/2015122076939Open ↗
12/30/2014122076939Open ↗
02/02/2009110325069Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
02/06/2015122258421Open ↗
08/25/2008110325069Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/29/2026M00912777-I1Open ↗
08/26/2026M01033060-P2Open ↗
08/26/2026M01033060-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/12/2017122465885Open ↗
08/19/2014122076939Open ↗
02/06/2015122258421Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026M00666570-I1Open ↗
09/02/2026M00666601-I1Open ↗
09/02/2026M00666545-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/25/2008110325069Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/12/2017122465885Open ↗
06/14/2017122258421Open ↗
10/01/2015140065284Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/07/2018122005454Open ↗
06/14/2017122258421Open ↗
06/01/2015122076939Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M01033060-S1Open ↗
08/13/2026M01033060-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/06/2015122258421Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/26/2013140065284Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/26/2013140065284Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/07/2018122005454Open ↗
06/14/2017122258421Open ↗
10/01/2015140065284Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/28/2014140065284Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATIONLETTERS - SUPPORTING DOCUMENTATION1
06/07/2018122005454Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
06/07/2018122005454Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/25/2008110325069Open ↗
▸BISSHED LETTER1
03/20/2015140065284Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
09/12/2017122465885Open ↗
08/16/2017122005454Open ↗
06/14/2017122258421Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
10/11/2017122465885Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION6
09/13/2017122005454Open ↗
09/12/2017122465885Open ↗
06/09/2017122258421Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET6
09/12/2017122465885Open ↗
09/12/2017122465885Open ↗
02/06/2015122258421Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00666570-P1Open ↗
08/16/2026M00666570-I1Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/26/2013140065284Open ↗
▸BISBOROUGH INTAKE FORM1
06/07/2018122005454Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/05/2014122005454Open ↗
09/05/2014122005454Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
09/16/2014122076939Open ↗