← Back
Two family converted from one family
325 EVERGREEN AVENUE
BROOKLYN · BIN 3075005
💬 Discuss this project
1901Year Built
3Stories
B3Building Class
R6Zoning
2,400 sfGross Floor Area
2Units
Two family converted from one family · 1,667 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PSA BROOKLYN DEVELOPMENT LLC1503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/16/2024$1.8M—2520 FOSTER LLC → Private party$765/sf building
07/31/2023$950K—MOONBOW REALTY AND BUILDERS INC → 2520 FOSTER LLC$396/sf building
12/21/2022$750K—Private party → MOONBOW REALTY AND BUILDERS INC$312/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.501/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor303/21/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781301/23/2024
Building Lifecycle
All (46)Filed (5)Permit Issued (2)Signed Off (2)Inspection (7)Special Inspection (30)
02/13/2024
Signed off — Alteration
EXISTING TWO FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION, MECHANICAL WORK ON THE CELLAR, 1ST, 2ND, 3RD FLOORS, AND OPEN SPACE IN THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00926565-S1
02/06/2024
Signed off — Alteration
EXISTING TWO FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION, MECHANICAL WORK ON THE CELLAR, 1ST, 2ND, 3RD FLOORS, AND OPEN SPACE IN THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00926565-I1
02/05/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/25/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/23/2024
Filed — Alteration
EXISTING TWO FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION, MECHANICAL WORK ON THE CELLAR, 1ST, 2ND, 3RD FLOORS, AND OPEN SPACE IN THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00926565-P3
01/22/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2023
Filed — Alteration
EXISTING TWO FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION, MECHANICAL WORK ON THE CELLAR, 1ST, 2ND, 3RD FLOORS, AND OPEN SPACE IN THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00926565-P2
11/24/2023
Special inspection requirement — Metering
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
11/24/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/22/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
11/21/2023
Filed — Alteration
EXISTING TWO FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION, MECHANICAL WORK ON THE CELLAR, 1ST, 2ND, 3RD FLOORS, AND OPEN SPACE IN THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00926565-P1
09/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/06/2023
Permit issued — Plumbing
B00926565-S1-PL
09/05/2023
Permit issued — General Construction
B00926565-I1-GC
08/31/2023
Filed — Alteration
EXISTING TWO FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION, MECHANICAL WORK ON THE CELLAR, 1ST, 2ND, 3RD FLOORS, AND OPEN SPACE IN THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00926565-S1
08/31/2023
Filed — Alteration
EXISTING TWO FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION, MECHANICAL WORK ON THE CELLAR, 1ST, 2ND, 3RD FLOORS, AND OPEN SPACE IN THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00926565-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC09/06/2023
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC09/05/2023
1 project · most recent 09/04/2023
General Wiring
FiledStatusContractorScope
09/04/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/05/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/22/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/25/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
01/25/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
01/25/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
01/25/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/25/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
01/25/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/25/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/25/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/25/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
01/25/2024MeteringCHRISTIAN LOZADAenergy_progress
01/25/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
01/25/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
01/25/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/25/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
11/24/2023MeteringCHRISTIAN LOZADAenergy_progress
11/24/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/24/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/24/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
11/24/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
11/24/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
11/24/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
11/24/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
11/24/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
11/24/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
11/24/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
Latest 25 of 33.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B00926565-P3Request digital key ↗
08/26/2026B00926565-P2Request digital key ↗
08/26/2026B00926565-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/06/2026B00926565-I1Open ↗
09/06/2026B00926565-I1Open ↗
08/27/2026B00926565-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00926565-S1Open ↗
08/26/2026B00926565-P1Open ↗
08/26/2026B00926565-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/06/2026B00926565-I1Open ↗
08/22/2026B00926565-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B00926565-P2Open ↗
08/26/2026B00926565-P1Open ↗
08/26/2026B00926565-P3Open ↗
Showing 3 of 5 on file for this type