← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
325 LAFAYETTE STREET
MANHATTAN · Greenwich Village · BIN 1008220
💬 Discuss this project
1900Year Built
7Stories
D0Building Class
M1-5/R9AZoning
15,610 sfGross Floor Area
10Units
0 Active ViolationsFISP: SWARMP
Elevator co-op, conversion from loft/warehouse · Owner of record: 325 Lafayette 81 Tenants · 2,230 sf lot · 7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof325 Lafayette Corp.5p · 3 filings · 17 docs
Bulkhead2p · 1 filing · 7 docs
Floor 6Unit 5A3p · 1 filing · 7 docs
Floor 5
Floor 4
Floor 3Unit 5A6p · 1 filing · 19 docs
Floor 2
Floor 1325 Lafayette Corp.40p · 9 filings · 20 docs
Cellar325 Lafayette Corp.26p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation17p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
325 Lafayette St Tenants5603/22/2026
325 Lafayette Ave1604/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Boyd Consulting1203/21/2026
Jenny Flores Expediting303/21/2026
Kushner Studios403/21/2026
William Vitacco Associates403/21/2026
New York Sign Consultants203/21/2026
SNR Expediting Design403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & J Construction ServiceScaffold2007/08/2026
In House GroupGeneral Contractor907/08/2026
Kevo ConstructionGeneral Contractor603/21/2026
Reliable EnterprisesScaffold603/21/2026
Reliable EnterprisesGeneral Contractor407/08/2026
Katan P & HPlumbing207/08/2026
Park Contracting GroupScaffold206/27/2026
MPS Plumbing & HeatingFire Protection107/08/2026
KJK ElectricElectrical103/22/2026
Air Depot Commercial RefrigerationGeneral Contractor104/09/2026
Mauceri Sign CoSign hanger107/08/2026
Cobot Plumbing and HeatingPlumbing107/08/2026
Marathon MechanicalPlumbing107/08/2026
Joseph Weinstein ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544811/04/2025
Tan Engineering1291411/04/2025
Alan Margolin & Associates423204/03/2023
New Age Engineering7746302/14/2023
Catalpa Special Inspectio2004111/22/2022
Enthink Engineers6247107/07/2021
G. Switzer Architecture1396101/23/2020
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/06/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01418084-I1
11/06/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01418104-I1
09/01/2026
Elevator Category 1 inspection report filed
06/23/2026
Permit issued — Sidewalk Shed
M01418084-I1-SH
231 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPark Contracting Group06/23/2026
DOB NOWSupported ScaffoldSigned-offPark Contracting Group06/23/2026
DOB NOWSprinklersSigned-offMPS Plumbing & Heating05/21/2025
DOB NOWPlumbingSigned-offCobot Plumbing and Heating05/21/2025
DOB NOWMechanical SystemsSigned-offAir Depot Commercial Refrigeration05/20/2025
DOB NOWGeneral ConstructionSigned-offKevo Construction05/16/2025
DOB NOWGeneral ConstructionSigned-offKevo Construction03/25/2025
DOB NOWMechanical SystemsSigned-offIn House Group10/15/2024
DOB NOWMechanical SystemsSigned-offIn House Group10/10/2024
DOB NOWPlumbingSigned-offMarathon Mechanical06/04/2024
DOB NOWMechanical SystemsSigned-offIn House Group05/24/2024
DOB NOWGeneral ConstructionSigned-offIn House Group05/24/2024
DOB NOWGeneral ConstructionSigned-offReliable Enterprises08/01/2023
DOB NOWMechanical SystemsSigned-offIn House Group05/19/2023
DOB NOWGeneral ConstructionSigned-offIn House Group05/19/2023
DOB NOWSignSigned-offMauceri Sign Co07/18/2022
DOB NOWPlumbingSigned-offKatan P & H01/20/2022
DOB NOWGeneral ConstructionSigned-offReliable Enterprises07/12/2021
DOB NOWSupported ScaffoldSigned-offReliable Enterprises05/14/2021
DOB NOWSidewalk ShedSigned-offReliable Enterprises05/13/2021
DOB NOWSupported ScaffoldSigned-offS & J Construction Service03/04/2021
DOB NOWSidewalk ShedSigned-offS & J Construction Service03/04/2021
DOB NOWSidewalk ShedSigned-offS & J Construction Service02/05/2021
DOB NOWSupported ScaffoldSigned-offS & J Construction Service02/05/2021
DOB NOWSidewalk ShedSigned-offS & J Construction Service02/12/2020
DOB NOWSupported ScaffoldSigned-offS & J Construction Service02/11/2020
DOB NOWPlumbingSigned-offKatan P & H01/29/2020
DOB NOWSidewalk ShedSigned-offS & J Construction Service10/04/2019
DOB NOWSupported ScaffoldSigned-offS & J Construction Service10/04/2019
BISOTISSUEDIn House Group11/02/2020
BISOTISSUEDS & J Construction Service03/06/2020
BISMHISSUEDV&D Mechanical04/11/2019
BISPLISSUEDVMC Plumbing & Heating07/31/2018
BISOTISSUEDTsang Construction06/27/2018
BIS—ISSUEDIn House Group11/13/2017
BISSDISSUEDTTM Group11/13/2017
BISEQISSUEDSpring Scaffolding03/28/2017
BISEQISSUEDSpring Scaffolding03/28/2017
BISOTISSUEDIn House Group10/21/2016
BISSPISSUEDTTM Group08/05/2016
+ 39 more permits on file
2 projects · most recent 04/18/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
04/18/2025——Air Conditioning Systems, Ventilation Systems
11/22/2022——Air Conditioning Systems
1 project · most recent 04/18/2025
FiledStatusContractorScope
04/18/2025———
2 projects · most recent 04/18/2025
Water/Sanitary
FiledStatusContractorScope
04/18/2025——Water/Sanitary
02/14/2023——Water/Sanitary
9 projects · most recent 06/19/2026
General Wiring
FiledStatusContractorScope
06/19/2026Permit IssuedRichard Neu—
06/07/2025CompleteSteel City Electrical ConGeneral Wiring
03/26/2025CompleteP.L. Electrical ContractingGeneral Wiring
05/28/2024CompleteSteel City Electrical ConGeneral Wiring
06/02/2023CompleteSteel City Electrical ConGeneral Wiring
07/20/2021CompleteJoseph Weinstein ElectricGeneral Wiring
10/03/2019CompleteRichard Neu—
11/13/2018CompleteKJK ElectricGeneral Wiring
03/02/2018CompleteLintech Electric—
1 project · most recent 11/21/2022
FiledStatusContractorScope
11/21/2022———
2 projects · most recent 06/19/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/19/2026Signed-offPark Contracting GroupSidewalk Shed
06/19/2026Signed-offPark Contracting GroupScaffold
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/06/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
11/10/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
11/10/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
11/10/2025HVAC-R and service water heating system controlsRoger Tanenergy_progress
11/10/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
11/10/2025Shutoff dampersRoger Tanenergy_progress
11/10/2025Maintenance informationRoger Tanenergy_progress
11/10/2025FinalRoger Tanprogress
11/10/2025Energy Code Compliance InspectionsRoger Tanprogress
11/10/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/10/2025Mechanical SystemsRoger Tanspecial
09/23/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
09/23/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
09/23/2025HVAC-R and service water heating system controlsRoger Tanenergy_progress
09/23/2025Shutoff dampersRoger Tanenergy_progress
09/23/2025Maintenance informationRoger Tanenergy_progress
09/23/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
09/23/2025FinalRoger Tanprogress
09/23/2025Energy Code Compliance InspectionsRoger Tanprogress
09/23/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
09/23/2025Mechanical SystemsRoger Tanspecial
03/25/2025Tenant Protection Plan Compliance—special
03/25/2025Maintenance information—energy_progress
03/25/2025HVAC-R and service water heating equipment—energy_progress
03/25/2025Shutoff dampers—energy_progress
03/25/2025HVAC-R and service water heating system controls—energy_progress
Latest 25 of 73.
667 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account