HPD02/01/2026§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD02/01/2026§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB07/20/201836,B254Nothing owed — awaiting certificate of correction
ECB07/20/201836,B254Nothing owed — awaiting certificate of correction
ECB07/20/201850-DEBRIS AT GAS METERS; 50A- GAS METER AREA NOT VENTILATED.Nothing owed — awaiting certificate of correction
ECB07/20/201836,B254Nothing owed — awaiting certificate of correction
ECB07/20/201836,B254Nothing owed — awaiting certificate of correction
ECB07/20/201836,B254Nothing owed — awaiting certificate of correction
ECB09/18/2015WORK WITHOUT A PERMIT.NOTE,AT TIME OF INSPECTION FOUND:PARAPET AND ROOF LEVEL ELEVATED AT FRONT OF PREMISES.PARAPET RAISED APPROX. 2',ROOF RAISED APPROX. 4.5' TO TOP OF PARAPET FULL WIDTH OF BUILDING FRONTAGE ANothing owed — awaiting certificate of correction