← Back
STATEN ISLAND
325 PULASKI AVENUE
STATEN ISLAND · BIN 5176284
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivilGeneral
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 12 docs
Basement1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS1303/20/2026
A TECH ENGINEERING NYC, PLLC.103/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS2403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KDC OF STATEN ISLAND INCGeneral Contractor807/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing407/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738503/20/2026
Building Lifecycle
All (104)Filed (14)Permit Issued (10)Signed Off (4)Violation (1)Inspection (12)Objection (33)Special Inspection (30)
04/27/2026
Objection raised — Scope
03/20/2026
Filed — New Building
APPLICATION FILED HEREWITH FOR PROPOSED TWO STORY, ONE FAMILY RESIDENCE. THIS PROJECT CONSISTS OF 1 ZONING LOT AND 4 SEPARATE TAX LOTS.
S00923101-P4
03/20/2026
Special inspection requirement — Maintenance information
anthony santoro
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
anthony santoro
03/20/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
03/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/20/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
03/20/2026
Special inspection requirement — Footing and Foundation
anthony santoro
03/20/2026
Special inspection requirement — Preliminary
anthony santoro
03/20/2026
Special inspection requirement — Permanent certificate
anthony santoro
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/20/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
03/20/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
03/20/2026
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
03/20/2026
Special inspection requirement — Final
anthony santoro
03/20/2026
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
03/20/2026
Special inspection requirement — Metering
anthony santoro
03/20/2026
Special inspection requirement — Air barrier — testing
anthony santoro
03/20/2026
Special inspection requirement — Fenestration areas
anthony santoro
03/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
03/20/2026
Special inspection requirement — Interior lighting power
anthony santoro
03/20/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
02/26/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE AS PER PLANS IN CONJUNCTION WITH NB APPLICATION.
S00922372-I1
02/03/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE AS PER PLANS IN CONJUNCTION WITH NB APPLICATION.
S00922372-P5
01/29/2026
Special inspection requirement — Footing and Foundation
anthony santoro
01/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
01/29/2026
Special inspection requirement — Preliminary
anthony santoro
01/29/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/29/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
anthony santoro
01/29/2026
Special inspection requirement — Final
anthony santoro
01/29/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/06/2026
Filed — New Building
APPLICATION FILED HEREWITH FOR PROPOSED TWO STORY, ONE FAMILY RESIDENCE. THIS PROJECT CONSISTS OF 1 ZONING LOT AND 4 SEPARATE TAX LOTS.
S00923101-P3
12/08/2025
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME.
S00946787-I1
12/01/2025
Filed — New Building
APPLICATION FILED HEREWITH FOR PROPOSED TWO STORY, ONE FAMILY RESIDENCE. THIS PROJECT CONSISTS OF 1 ZONING LOT AND 4 SEPARATE TAX LOTS.
S00923101-P2
11/18/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE AS PER PLANS IN CONJUNCTION WITH NB APPLICATION.
S00922372-P4
11/17/2025
Signed off — Alteration
S00918139-I1
10/22/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Scope
10/07/2025
Filed — New Building
APPLICATION FILED HEREWITH FOR PROPOSED TWO STORY, ONE FAMILY RESIDENCE. THIS PROJECT CONSISTS OF 1 ZONING LOT AND 4 SEPARATE TAX LOTS.
S00923101-P1
10/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/16/2025
Permit issued — Curb Cut
S00918139-I1-CC
09/10/2025
Signed off — Alteration
S00917957-I1
08/28/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/20/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE AS PER PLANS IN CONJUNCTION WITH NB APPLICATION.
S00922372-P3
08/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE AS PER PLANS IN CONJUNCTION WITH NB APPLICATION.
S00922372-P2
08/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2025
Permit issued — Plumbing
S00922372-I1-PL
07/29/2025
Permit issued — Plumbing
S00946787-I1-PL
04/01/2025
Permit issued — Earth Work
S00923101-I1-GC-CX
03/31/2025
Permit issued — Construction Fence
S00917957-I1-FN
11/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offKDC OF STATEN ISLAND INC09/16/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/30/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/29/2025
DOB NOWEarth WorkPermit IssuedKDC OF STATEN ISLAND INC04/01/2025
DOB NOWConstruction FenceSigned-offKDC OF STATEN ISLAND INC03/31/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/03/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC06/21/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/18/2024
DOB NOWConstruction FenceSigned-offKDC OF STATEN ISLAND INC04/10/2024
DOB NOWFoundationPermit IssuedKDC OF STATEN ISLAND INC04/02/2024
1 project · most recent 09/17/2025
General Wiring
FiledStatusContractorScope
09/17/2025CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 03/20/2026
FiledStatusContractorScope
03/20/2026Permit IssuedKDC OF STATEN ISLAND INC6 scope_items
1 project · most recent 03/20/2026
Earthwork
FiledStatusContractorScope
03/20/2026Permit IssuedKDC OF STATEN ISLAND INCEarthwork
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/28/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2024Pass-Final PL - UndergroundPassView ↗
07/03/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/27/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
03/20/2026Concrete - Cast-In-Placeanthony santorospecial
03/20/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
03/20/2026Subgrade Inspectionsanthony santorospecial
03/20/2026Subsurface Conditions – Fill Placement & In-Place Densityanthony santorospecial
03/20/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/20/2026Finalanthony santoroprogress
03/20/2026Fire-Resistance Rated Constructionanthony santoroprogress
03/20/2026Footing and Foundationanthony santoroprogress
03/20/2026Preliminaryanthony santoroprogress
03/20/2026Permanent certificateanthony santoroenergy_progress
03/20/2026Air barrier - visual inspectionanthony santoroenergy_progress
03/20/2026Insulation placement and R valuesanthony santoroenergy_progress
03/20/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
03/20/2026Fenestration air leakageanthony santoroenergy_progress
03/20/2026Maintenance informationanthony santoroenergy_progress
03/20/2026Protection of exposed foundation insulationanthony santoroenergy_progress
03/20/2026Meteringanthony santoroenergy_progress
03/20/2026Air barrier — testing anthony santoroenergy_progress
03/20/2026Fenestration areasanthony santoroenergy_progress
03/20/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/20/2026Interior lighting poweranthony santoroenergy_progress
01/29/2026Insulation placement and R valuesanthony santoroenergy_progress
01/29/2026Subgrade Inspectionsanthony santorospecial
01/29/2026Concrete - Cast-In-Placeanthony santorospecial
01/29/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
Latest 25 of 84.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/22/2026S00918139-I1Request digital key ↗
08/22/2026S00917957-I1Request digital key ↗
08/21/2026S00946787-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026S00923101-P4Open ↗
08/13/2026S00923101-P3Open ↗
08/13/2026S00923101-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/17/2026S00923101-P4Open ↗
08/13/2026S00923101-I1Open ↗
08/13/2026S00923101-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00923101-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/21/2026S00946787-I1Open ↗
08/17/2026S00923101-P4Open ↗
08/17/2026S00922372-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026S00923101-P4Open ↗
09/29/2026S00923101-P4Open ↗
09/01/2026S00923101-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026S00923101-P4Open ↗
09/01/2026S00923101-I1Open ↗
08/28/2026S00923101-P3Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/17/2026S00923101-P4Open ↗
08/13/2026S00923101-P2Open ↗
08/13/2026S00923101-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/17/2026S00923101-P4Open ↗
08/13/2026S00923101-P3Open ↗
08/13/2026S00923101-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00923101-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00923101-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00923101-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00923101-I1Open ↗
▸Other Documents17
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026S00923101-P4Open ↗
08/13/2026S00923101-P2Open ↗
08/13/2026S00923101-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026S00923101-P4Open ↗
08/13/2026S00923101-P3Open ↗
08/13/2026S00923101-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/17/2026S00923101-P4Open ↗
08/13/2026S00923101-I1Open ↗
08/13/2026S00923101-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00923101-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00923101-I1Open ↗