← Back
Two stories - detached, small or mid-size
325 ROBINSON AVENUE
STATEN ISLAND · BIN 5067166
💬 Discuss this project
2023Year Built
2Stories
A1Building Class
R3AZoning
2,747 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,750 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 22p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDPLUS ARCHITECTURE PLLC406/06/2024
RS ENGINEERING & LAND SURVEYING109/27/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MACKLER MASTER FIRE INCPlumbing207/08/2026
I.H 1 CONSTRUCTION CORPGeneral Contractor107/08/2026
LL CUSTOM HOMES LLCGeneral Contractor107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738206/06/2024
BUILDPLUS ARCHITECTURE PL7849110/23/2022
Building Lifecycle
All (44)Filed (5)Permit Issued (5)Violation (2)Inspection (8)Objection (4)Special Inspection (20)
06/07/2024
Special inspection requirement — Energy Code Compliance Inspections
arben sela
06/07/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
06/06/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Alteration of exiting single family detached dwelling. General construction and Foundation work
S08009878-P1
06/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
arben sela
06/04/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
05/31/2024
Permit issued — Plumbing
S80786118-S1-PL
11/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2023
Violation issued (ECB, closed)
Unknown
05/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/11/2023
Permit issued — Plumbing
S80786118-S1-PL
04/12/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/10/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/05/2023
Permit issued — Plumbing
S08009878-S1-PL
01/19/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2023
Permit issued — Foundation
S08009878-I1-GC-CX
12/09/2022
Objection raised — Scope
12/09/2022
Objection resolved — Addressed
12/09/2022
Objection resolved — Addressed
11/22/2022
Objection raised — Scope
10/23/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
Alteration of exiting single family detached dwelling. General construction and Foundation work
S08009878-I1
10/23/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
Alteration of exiting single family detached dwelling. General construction and Foundation work
S08009878-S1
10/16/2022
Special inspection requirement — Wood – Prefabricated I-Joists
Arben sela
10/16/2022
Special inspection requirement — Energy Code Compliance Inspections
arben sela
10/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
arben sela
10/16/2022
Special inspection requirement — Concrete - Cast-In-Place
Arben sela
10/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
arben sela
10/16/2022
Special inspection requirement — Air barrier - visual inspection
arben sela
10/16/2022
Special inspection requirement — Permanent certificate
arben sela
10/16/2022
Special inspection requirement — Insulation placement and R values
arben sela
10/16/2022
Special inspection requirement — Maintenance information
arben sela
10/16/2022
Special inspection requirement — Structural Wood Frame
arben sela
10/16/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Arben sela
10/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arben sela
10/16/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Arben sela
09/27/2022
Filed — Alteration
S08010113-I1
09/26/2022
Special inspection requirement — Footing and Foundation
arben sela
09/26/2022
Special inspection requirement — Final
arben sela
09/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
arben sela
06/09/2022
Permit issued — Construction Fence
S00750420-I1-FN
06/02/2022
Filed — Alteration
S00750420-I1
05/12/2022
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
04/28/2022
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMACKLER MASTER FIRE INC05/31/2024
DOB NOWPlumbingPermit IssuedMACKLER MASTER FIRE INC05/11/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/05/2023
DOB NOWFoundationPermit IssuedLL CUSTOM HOMES LLC01/12/2023
DOB NOWConstruction FenceSigned-offI.H 1 CONSTRUCTION CORP06/09/2022
1 project · most recent 06/06/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/06/2024Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
2 projects · most recent 09/11/2023
General Wiring
FiledStatusContractorScope
09/11/2023CompleteRIDGE ELECTRIC CORP.General Wiring
03/29/2023CompleteRIDGE ELECTRIC CORP.General Wiring
1 project · most recent 06/06/2024
Concrete Wood
FiledStatusContractorScope
06/06/2024Signed-offQUALITY PLUMBING, INCConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/12/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/10/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/12/2022Pass-Final Sign Permit InspectionPassView ↗
04/28/2022Fail-Final Sign Permit InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/07/2024Energy Code Compliance Inspectionsarben selaprogress
06/07/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
06/04/2024Energy Code Compliance Inspectionsarben selaprogress
06/04/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
10/16/2022Wood – Prefabricated I-JoistsArben selaspecial
10/16/2022Energy Code Compliance Inspectionsarben selaprogress
10/16/2022Fire-Resistance Rated Constructionarben selaprogress
10/16/2022Concrete - Cast-In-PlaceArben selaspecial
10/16/2022Fenestration and door U-factor and product ratingsarben selaenergy_progress
10/16/2022Air barrier - visual inspectionarben selaenergy_progress
10/16/2022Permanent certificatearben selaenergy_progress
10/16/2022Insulation placement and R valuesarben selaenergy_progress
10/16/2022Maintenance informationarben selaenergy_progress
10/16/2022Structural Wood Framearben selaprogress
10/16/2022Exterior Insulation and Finish Systems (EIFS)Arben selaspecial
10/16/2022Fire-Resistant Penetrations and JointsArben selaspecial
10/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationArben selaspecial
09/26/2022Footing and Foundationarben selaprogress
09/26/2022Finalarben selaprogress
09/26/2022Structural Stability – Alterations of existing buildingsarben selaspecial
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S00750420-I1Request digital key ↗
08/24/2026S08010113-I1Request digital key ↗
08/21/2026S08009878-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
12/05/2022540231382Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/05/2022540231382Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026S08009878-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026S08009878-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026S08009878-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026S08009878-P1Open ↗
08/28/2026S08009878-I1Open ↗
08/28/2026S08009878-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026S08009878-P1Open ↗
08/28/2026S08009878-I1Open ↗
08/28/2026S08009878-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00750420-I1Open ↗
08/21/2026S08009878-I1Open ↗
08/21/2026S08009878-S1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/05/2022540231382Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/05/2022540231382Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026S08009878-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026S08009878-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026S08009878-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026S08009878-P1Open ↗
08/21/2026S08009878-S1Open ↗
08/15/2026S08009878-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/05/2022540231382Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/05/2022540231382Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/05/2022540231382Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/05/2022540231382Open ↗
▸Other Documents7
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
07/05/2022540231382Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/05/2022540231382Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/05/2022540231382Open ↗
▸BISWAIVER OF CURB AND SIDEWALK ALIGNMENT1
12/05/2022540231382Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026S08009878-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026S08009878-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026S08009878-I1Open ↗