← Back
BuildNYC
Elevator cooperative
325 WEST 86TH STREET
MANHATTAN · BIN 1033937
💬 Discuss this project
1926Year Built
15Stories
D4Building Class
R10AZoning
82,655 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 325 West 86th St · 7,553 sf lot · 10.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 16Unit 16C11p · 1 filing · 20 docs
Floor 15
Floor 14Unit 14C6p · 1 filing · 12 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Unit 6C23p · 1 filing · 20 docs
Floor 5
Floor 4Unit 4C1p · 1 filing · 8 docs
Floor 3
Floor 2
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed installation8p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
325_West 86th St5603/22/2026
325 W 86 St303/21/2026
Quantum Design203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Suntect209/05/2025
DTLS Architecture408/06/2024
Stavros I. Malliaros, P.E105/10/2024
Lane Engineering Consulting105/03/2024
TSF Engineering312/19/2023
Exd Architecture104/14/2023
Collingham Architecture112/03/2019
Haider Engineering, P.E102/09/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bay Restoration1003/21/2026
Clarke Construction Consultants803/21/2026
Municipal Building Consultants103/21/2026
Socotec203/21/2026
Haider Engineering, P.E103/21/2026
New Amsterdam Expediting403/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.s.c.constructionGeneral Contractor1203/21/2026
Billy EnterprisesScaffold507/08/2026
Bay Restorationspecialty_contractor207/08/2026
L.L.G. Plumbing & HeatingPlumbing207/08/2026
Bay RestorationScaffold206/27/2026
E & M Electrical NYElectrical103/21/2026
Amina ContractingGeneral Contractor104/09/2026
Lucas Construction NYGeneral Contractor107/08/2026
Aqueduct MechanicalPlumbing107/08/2026
Genesis Plumbing and HeatingPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Simple Choice Plumbing and HTPlumbing107/08/2026
Henry Y. MannElectrical103/21/2026
Magna ElectricElectrical103/22/2026
Gsa ElectricElectrical103/21/2026
Pac ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Suntect4788209/05/2025
Lane Engineering Consulting2967105/03/2024
Delta Testing Labs687104/21/2023
MJ Engineering & Design5546112/03/2019
Building Lifecycle
All (155)Filed (20)Permit Issued (23)Signed Off (11)Facade (FISP) (15)Violation (50)Inspection (10)Objection (3)Special Inspection (23)
08/17/2026
Cycle 10 facade report submitted
08/17/2026
Cycle 10 facade report signed — SWARMP
08/03/2026
Signed off — Alteration
EXTERIOR RESTORATION TO INCLUDE LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, BRICK AND PARAPET REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00972390-I1
07/10/2026
Cycle 10 facade inspection completed
06/25/2026
Signed off — Alteration
M01048874-I1
06/01/2026
Signed off — Alteration
PERFORM PLUMBING MODIFICATION WORK INCONJUNCTION WITH APT#14C RENOVATION. REMOVE, RELOCATE AND REPLACE PLUMBING FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER INITIAL APPLICATION. NO CHANGE TO USE, EGRES, OCCUPANCY OR FIRE PROTECTION.
M01276686-I1
06/01/2026
Signed off — Alteration
PERFORM PLUMBING MODIFICATION WORK INCONJUNCTION WITH APT#14C RENOVATION. REMOVE, RELOCATE AND REPLACE PLUMBING FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER INITIAL APPLICATION. NO CHANGE TO USE, EGRES, OCCUPANCY OR FIRE PROTECTION.
M01276686-S1
04/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Permit issued — Plumbing
M01276686-S1-PL
10/02/2025
Permit issued — General Construction
M01276686-I1-GC
09/05/2025
Filed — Alteration
PERFORM PLUMBING MODIFICATION WORK INCONJUNCTION WITH APT#14C RENOVATION. REMOVE, RELOCATE AND REPLACE PLUMBING FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER INITIAL APPLICATION. NO CHANGE TO USE, EGRES, OCCUPANCY OR FIRE PROTECTION.
M01276686-I1
09/05/2025
Filed — Alteration
PERFORM PLUMBING MODIFICATION WORK INCONJUNCTION WITH APT#14C RENOVATION. REMOVE, RELOCATE AND REPLACE PLUMBING FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER INITIAL APPLICATION. NO CHANGE TO USE, EGRES, OCCUPANCY OR FIRE PROTECTION.
M01276686-S1
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Haner
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Haner
08/26/2025
Special inspection requirement — Final
David Haner
08/07/2025
Permit issued — Sidewalk Shed
M01048874-I1-SH
08/06/2025
Permit issued — General Construction
M00972390-I1-GC
04/25/2025
Signed off — Alteration
PL FIXTURES IN APT 16C FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01056710-S1
03/25/2025
Signed off — Alteration
PL FIXTURES IN APT 16C FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01056710-I1
02/25/2025
Signed off — Alteration
M01173097-I1
02/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2025
Permit issued — Suspended Scaffold
M01173097-I1-SC
02/04/2025
Objection raised — Other
02/03/2025
Filed — Alteration
M01173097-I1
01/23/2025
Filed — Alteration
M01054335-P3
12/10/2024
Filed — Alteration
M01054335-P2
09/26/2024
Violation issued (ECB, closed)
Unknown
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2024
Special inspection requirement — Interior lighting power
Mark Bearak
08/15/2024
Special inspection requirement — Final
Mark Bearak
08/15/2024
Special inspection requirement — Lighting controls
Mark Bearak
08/06/2024
Filed — Alteration
PL FIXTURES IN APT 16C FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01056710-P2
08/05/2024
Special inspection requirement — Interior lighting power
Mark Bearak
08/05/2024
Special inspection requirement — Final
Mark Bearak
08/05/2024
Special inspection requirement — Lighting controls
Mark Bearak
08/02/2024
Permit issued — Suspended Scaffold
M01086432-I1-SC
07/25/2024
Filed — Alteration
ELECTRIC HOIST DURING FACADE REPAIR WORK
M01086432-I1
07/25/2024
Permit issued — Suspended Scaffold
M01054335-P1-SC
07/18/2024
Filed — Alteration
M01054335-P1
07/18/2024
Permit issued — General Construction
M00972390-I1-GC
07/02/2024
Filed — Alteration
PL FIXTURES IN APT 16C FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01056710-P1
06/28/2024
Permit issued — Suspended Scaffold
M01054335-I1-SC
06/27/2024
Permit issued — Plumbing
M01056710-S1-PL
06/18/2024
Permit issued — General Construction
M01056710-I1-GC
06/12/2024
Objection raised — Scope
06/12/2024
Objection resolved — Addressed
06/05/2024
Filed — Alteration
PL FIXTURES IN APT 16C FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01056710-S1
06/05/2024
Filed — Alteration
PL FIXTURES IN APT 16C FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01056710-I1
06/03/2024
Permit issued — Suspended Scaffold
M01054335-I1-SC
05/21/2024
Filed — Alteration
M01054335-I1
05/13/2024
Permit issued — Sidewalk Shed
M01048874-I1-SH
05/10/2024
Filed — Alteration
M01048874-I1
05/03/2024
Filed — Alteration
EXTERIOR RESTORATION TO INCLUDE LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, BRICK AND PARAPET REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00972390-I1
05/03/2024
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
05/03/2024
Special inspection requirement — Masonry
Douglas Lane
05/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
05/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAqueduct Mechanical10/03/2025
DOB NOWGeneral ConstructionSigned-offAmina Contracting10/02/2025
DOB NOWSidewalk ShedSigned-offBay Restoration08/07/2025
DOB NOWGeneral ConstructionSigned-offBay Restoration08/06/2025
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co02/04/2025
DOB NOWSuspended ScaffoldPermit IssuedBay Restoration08/02/2024
DOB NOWSuspended ScaffoldPermit IssuedBay Restoration07/25/2024
DOB NOWGeneral ConstructionSigned-offBay Restoration07/18/2024
DOB NOWSuspended ScaffoldPermit IssuedBay Restoration06/28/2024
DOB NOWPlumbingSigned-offGenesis Plumbing and Heating06/27/2024
DOB NOWGeneral ConstructionSigned-offLucas Construction NY06/18/2024
DOB NOWSuspended ScaffoldPermit IssuedBay Restoration06/03/2024
DOB NOWSidewalk ShedSigned-offBay Restoration05/13/2024
DOB NOWGeneral ConstructionSigned-offD.s.c.construction11/02/2023
DOB NOWGeneral ConstructionSigned-offD.s.c.construction10/23/2023
DOB NOWMechanical SystemsSigned-offD.s.c.construction06/08/2023
DOB NOWPlumbingSigned-offSimple Choice Plumbing and HT06/05/2023
DOB NOWGeneral ConstructionSigned-offD.s.c.construction05/23/2023
DOB NOWPlumbingPermit IssuedL.L.G. Plumbing & Heating07/27/2020
DOB NOWPlumbingPermit IssuedL.L.G. Plumbing & Heating06/24/2020
DOB NOWSidewalk ShedSigned-offBilly Enterprises09/21/2018
DOB NOWSidewalk ShedSigned-offBilly Enterprises08/09/2018
DOB NOWSidewalk ShedSigned-offBilly Enterprises02/12/2018
BISOTISSUEDNY Best Painting03/15/2021
BISPLISSUEDIntegra Plumbing of N.Y01/21/2021
BISOTISSUEDNY Best Painting01/11/2021
BISOTISSUEDNY Best Painting12/05/2019
BISPLISSUEDG.bassolino Plumbing02/06/2019
BISOTISSUEDPoler Contracting02/06/2019
BISOTISSUEDLinden Marshall Contracting12/13/2018
BISPLISSUEDBudget Plumbing & Heating09/14/2018
BISOTISSUEDLinden Marshall Contracting09/12/2018
BISOTISSUEDArt-B Construction08/28/2018
BISOTISSUEDArt-B Construction03/28/2018
BISPLISSUEDIntegra Plumbing of N.Y12/06/2017
BISOTISSUEDArtec Construction11/17/2017
BISOTISSUEDNichibi Organization12/30/2016
BISPLISSUEDL&J PLG & Heating Co of NY11/18/2016
BISOTISSUEDNichibi Organization11/04/2016
BISOTISSUEDNYS Builders08/29/2016
+ 33 more permits on file
1 project · most recent 12/03/2019
Gas Water/Sanitary
FiledStatusContractorScope
12/03/2019Permit IssuedL.L.G. Plumbing & HeatingGas, Water/Sanitary
17 projects · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026Permit IssuedPac ElectricGeneral Wiring
11/13/2025Pending PaymentAccurate ElectricalGeneral Wiring
10/03/2025CompleteE & M Electrical NYGeneral Wiring
02/19/2025CompleteRomcon ElectricGeneral Wiring
06/13/2024CompleteVertex ElectricGeneral Wiring
12/03/2023CompleteTop Notch ElectricGeneral Wiring
10/18/2023CompleteMartin DorkinGeneral Wiring
11/28/2022CompleteMagna ElectricGeneral Wiring
08/30/2022CompletePhilip A. RobinsonGeneral Wiring
07/06/2022CompleteBrandl Electric—
10/19/2021Permit IssuedGoldman ElectricGeneral Wiring
04/28/2021CompletePac ElectricGeneral Wiring
01/11/2021CompleteMLS ElectricGeneral Wiring
09/30/2019CompleteJam Electrical—
06/13/2019CompleteH. & L. ElectricGeneral Wiring
1 project · most recent 07/25/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/25/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/27/2025Fire-Resistant Penetrations and JointsDavid Hanerspecial
08/27/2025Fire-Resistant Penetrations and JointsDavid Hanerspecial
08/26/2025FinalDavid Hanerprogress
08/15/2024Interior lighting powerMark Bearakenergy_progress
08/15/2024FinalMark Bearakprogress
08/15/2024Lighting controlsMark Bearakenergy_progress
08/05/2024Interior lighting powerMark Bearakenergy_progress
08/05/2024FinalMark Bearakprogress
08/05/2024Lighting controlsMark Bearakenergy_progress
05/03/2024Air barrier - visual inspectionDouglas Laneenergy_progress
05/03/2024MasonryDouglas Lanespecial
05/03/2024Structural Stability – Alterations of existing buildingsDouglas Lanespecial
05/03/2024Energy Code Compliance InspectionsDouglas Laneprogress
12/06/2023Tenant Protection Plan ComplianceDouglas Lanespecial
12/06/2023FinalDouglas Laneprogress
04/19/2023FinalNicholas Tucciprogress
04/19/2023Mechanical SystemsRICHARD GREENWALDspecial
04/11/2023FinalMICHELLE CIANFAGLIONEprogress
04/11/2023Lighting in dwelling unitsMICHELLE CIANFAGLIONEenergy_progress
04/11/2023Energy Code Compliance InspectionsMICHELLE CIANFAGLIONEprogress
10/29/2019Fire-Resistant Penetrations and JointsMagdy Youssefspecial
10/29/2019Maintenance informationANDREW COLLINGHAMenergy_progress
01/25/2018FinalJAFAR HAIDERprogress
▾Documents — 436 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/06/2026M00014125-I1Request digital key ↗
08/28/2026M00858077-I1Request digital key ↗
08/28/2026M00858077-S1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00254998-I1Request digital key ↗
▸Applications & Permits91
▸BISWORK PERMIT APPLICATION43
01/21/2021123328345Open ↗
12/05/2019123845198Open ↗
02/06/2019123537413Open ↗
Showing 3 of 43 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION35
10/07/2022122862214Open ↗
10/05/2022122862214Open ↗
08/19/2022122862214Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWLPC Approval/Permit12
08/13/2026M00972390-I1Open ↗
08/13/2026M00254998-I1Open ↗
08/13/2026M00858077-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/05/2019122872597Open ↗
▸Seals & Professional Certifications82
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
12/05/2019123845198Open ↗
12/05/2019123845198Open ↗
11/26/2019123845198Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/31/2026M00858077-S2Open ↗
08/29/2026M00254998-I1Open ↗
08/29/2026M01276686-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026M00858077-I1Open ↗
08/28/2026M00858077-P1Open ↗
08/28/2026M00858077-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026M00858077-S2Open ↗
08/29/2026M00254998-I1Open ↗
08/29/2026M01276686-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/26/2019123845198Open ↗
03/05/2018123444460Open ↗
08/16/2016122862214Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/26/2019123845198Open ↗
03/05/2018123444460Open ↗
08/16/2016122862214Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/19/2015140431986Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/19/2015140431986Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
07/11/2019123537413Open ↗
06/21/2019123537413Open ↗
04/05/2019122872597Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING10
03/22/2021123328345Open ↗
Showing 1 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
10/12/2015122392035Open ↗
Showing 1 of 9 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes7
11/26/2019123845198Open ↗
11/30/2018123537413Open ↗
09/11/2018122872597Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00254998-I1Open ↗
▸Environmental & Asbestos32
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
11/26/2019123845198Open ↗
11/30/2018123537413Open ↗
09/11/2018122872597Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026M00858077-P1Open ↗
08/28/2026M00858077-S1Open ↗
08/28/2026M00858077-S2Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
11/26/2019123845198Open ↗
07/10/2019122872597Open ↗
07/10/2019122872597Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
05/10/2021123328345Open ↗
04/30/2021123845198Open ↗
07/10/2019122872597Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
05/10/2021123328345Open ↗
05/10/2021123328345Open ↗
04/30/2021123845198Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/19/2015140431986Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/23/2024123537413Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/23/2024123537413Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
02/21/2023122862214Open ↗
10/12/2022122862214Open ↗
05/10/2021123328345Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/23/2024123537413Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
02/21/2023122862214Open ↗
05/10/2021123328345Open ↗
04/30/2021123845198Open ↗
Showing 3 of 14 on file for this type
▸BISLANDMARKS APPROVAL12
09/11/2018122872597Open ↗
01/18/2018123119268Open ↗
11/02/2017123328345Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/14/2017140402231Open ↗
04/18/2016122282797Open ↗
04/18/2016122282797Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF1
09/28/2022122862214Open ↗
▸BISFINAL1
05/23/2024123537413Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT32
05/10/2021123328345Open ↗
04/30/2021123845198Open ↗
11/26/2019123845198Open ↗
Showing 3 of 32 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/21/2023122862214Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET15
11/26/2019123845198Open ↗
11/30/2018123537413Open ↗
09/11/2018122872597Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION9
03/25/2021123328345Open ↗
03/25/2021123328345Open ↗
01/08/2021123845198Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
01/21/2021123328345Open ↗
07/10/2019122872597Open ↗
06/21/2019123537413Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/19/2015140431986Open ↗
Showing 1 of 4 on file for this type
▸Other Documents20
▸DOB NOWManufacturer's Specifications6
08/13/2026M01054335-P3Open ↗
08/13/2026M01173097-I1Open ↗
08/13/2026M01054335-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCalculations6
08/13/2026M01054335-P2Open ↗
08/13/2026M01173097-I1Open ↗
08/13/2026M01054335-P1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
03/29/2018123119268Open ↗
03/29/2018123119268Open ↗
10/18/2017123328345Open ↗
Showing 3 of 4 on file for this type
▸BISDHCR DOCUMENT1
01/08/2021123845198Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01276686-I1Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00254998-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00014125-I1Open ↗