HPD05/07/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB03/09/2026FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #4 SOUTH, MISSING FACADE PANELS MULTI LOC. REMEDY: MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES AS PER$2K due
HPD06/12/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB08/21/2024FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE AT TIME O F INSPECTION,PREVIOUS VIO 35683682J DATED 7-15-24 WAS NOT CORRECTED.OB SERVED DISLOGED PANELS & UNSECURE PANELS,SCREWS NOT FULLY SCREWED INTO PANELS.OBSERVED MISSING PANELS AT EXP2 AND 3.REMEDY:REPAIR & REPLACE
DOB05/22/2024FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES EXPOSURE#2 NORTH AND EXPOSURE#4 SOUTH HAVE LOOSE PARTS NEED IMMEDIATE ATTENTION REMEDY: IMMEDIATELY TAKE CORRECTIVE ACTION TO REPAIR/REPLACE DEFECTIVE FACADE PANELS AS PER 1 RCNY 103-04
HPD04/16/2024(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB03/12/2024AS PER CONDITIONS ON EXP2 (N ELE) AND EXP4 (S ELE) LOOSE PANELS ON BLDG FACADE. REMEDY: OWNER TO IMMEDIATELY RETAIN A NYS LIC PROF TO PERFORM A 100% HANDS ON INSPECTION OF ALL EXTERIOR PANELS ON THE FACADE & PROVIDE REPAIR PLANT & PROPOSAL SUBMITTED WITH THE ENGINEERS REPORT. REMEDY: TO DOB FACADE UNIT FACADES@BUILDINGS.NYC.GOV BY 421/24
HPD03/30/2023(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB12/10/2022EMERGENCY WORK ORDER-DUE TO OBSERVED LOOSE FACADE PANEL(VENEER PANEL) AT SOUTH ELEVATION, EXPOSURE 4 @7FL. REMEDY: IMMED REMOVE/REPLACE THE LOOSE FACADE PANEL AT SOUTH ELEV EXP4
HPD03/08/2022(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD04/16/2021(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB05/22/2024UNLAWFUL ACTS.FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER.NOTE:AT TIME OF INSPECTION,RESPONDENT HAS FAILED TO COMPLY WITH PREVIOUS VIOL#35682170L(03/12/2024)AND PREVIOUS VIOL#35682172P(03/12/2024).BOTH VIOLNothing owed — awaiting certificate of correction
ECB03/21/2024UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.NOTE:DOB#121022LLFA01MH-REQUIRED THE OWNER TO IMMEDIATELY REPAIR THE LOOSE FACADE PANEL AT EXPOSURE 4(SOUTH ELE) AT TIME OF INSPECTION ON 03/12/2024 I ONothing owed — awaiting certificate of correction
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 11,149 sf lot · 4.58 FAR built · Flood zone X500