← Back
BuildNYC
Elevator cooperative
325 WEST END AVENUE
MANHATTAN · BIN 1031026
💬 Discuss this project
1916Year Built
13Stories
D4Building Class
R10AZoning
160,203 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized8 Active Violations 7 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 325 West End Avenue Owners · 14,800 sf lot · 10.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHoffman Management3p · 3 filings · 17 docs
PenthouseUnit PHA3p · 1 filing · 10 docs
Floor 11Unit 11B20p · 1 filing · 20 docs
Floor 10
Floor 9Unit 9A18p · 2 filings · 20 docs
Floor 8
Floor 7
Floor 61 filing · 6 docs
Floor 5Unit 5D1 filing
Floor 4
Floor 3Unit 3C14p · 2 filings · 20 docs
Floor 2
Floor 1Unit 1A30p · 3 filings · 20 docs
Site & exteriorHoffman Management34p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
325 West End Ave Owners14803/22/2026
Arisa Realty1007/08/2026
325 West E503/21/2026
Heron203/21/2026
S Associates103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold1203/21/2026
Traditional LineGeneral Contractor1107/08/2026
Nordic Custom BuildersGeneral Contractor707/08/2026
LVL ConstructionGeneral Contractor303/21/2026
Traditional Waterproofingspecialty_contractor307/08/2026
BP Mechanicalspecialty_contractor203/21/2026
S&H PlumbingPlumbing207/08/2026
Prudent ElectricElectrical103/21/2026
R. GunzerElectrical103/22/2026
Awesome Electl ContngElectrical103/22/2026
Rockledge ScaffoldScaffold107/08/2026
Alklem PlumbingPlumbing107/08/2026
HI-Tech Plumbing & HeatingPlumbing107/08/2026
Hod Piping & HeatingPlumbing107/08/2026
Division One ContractingGeneral Contractor107/08/2026
Lippolis ElectricElectrical103/21/2026
Inner City Electrical ContractorsElectrical103/21/2026
Norway ElectricElectrical103/21/2026
Lina ElectricElectrical103/21/2026
Mike Lewkovicz Electric CompanyElectrical103/21/2026
Paolino FrankElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eric K. Daniels Architect4060307/10/2025
Niza Works of Architects6101605/29/2025
Bergman Consulting Engineering253209/30/2022
Geiger Engineering689109/13/2022
Piro Studio7503105/03/2022
H. A. Bader Consultants2332212/03/2021
Integrity Consulting Service666111/16/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/06/2026
Filed — Alteration
Plumbing work for interior renocation of unit 5D - (1) New Sink, (2) New Sinks in Same location, (1) New Dishwasher in same location, (1) New Gas Cooktop in same location (1) Relocated Washer, (1) Relocated Gas Dryer.
M01446013-S1
11/05/2026
Filed — Alteration
Plumbing work for interior renocation of unit 5D - (1) New Sink, (2) New Sinks in Same location, (1) New Dishwasher in same location, (1) New Gas Cooktop in same location (1) Relocated Washer, (1) Relocated Gas Dryer.
M01446013-I1
08/18/2026
Special inspection requirement — Lighting in dwelling units
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
239 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHI-Tech Plumbing & Heating03/10/2025
DOB NOWGeneral ConstructionSigned-offLVL Construction03/05/2025
DOB NOWPlumbingSigned-offHod Piping & Heating06/18/2024
DOB NOWGeneral ConstructionSigned-offTraditional Waterproofing04/02/2024
DOB NOWSuspended ScaffoldSigned-offTraditional Water and Res01/22/2024
DOB NOWGeneral ConstructionSigned-offDivision One Contracting01/17/2024
DOB NOWGeneral ConstructionSigned-offTraditional Line06/07/2023
DOB NOWMechanical SystemsSigned-offTraditional Line06/07/2023
DOB NOWGeneral ConstructionSigned-offNordic Custom Builders04/11/2023
DOB NOWMechanical SystemsSigned-offNordic Custom Builders04/11/2023
DOB NOWGeneral ConstructionSigned-offTraditional Waterproofing03/17/2023
DOB NOWPlumbingSigned-offS&H Plumbing03/07/2023
DOB NOWSidewalk ShedSigned-offRockledge Scaffold01/09/2023
DOB NOWMechanical SystemsSigned-offNordic Custom Builders11/29/2022
DOB NOWGeneral ConstructionSigned-offNordic Custom Builders11/29/2022
DOB NOWPlumbingSigned-offAlklem Plumbing11/29/2022
DOB NOWGeneral ConstructionSigned-offTraditional Line07/14/2022
DOB NOWMechanical SystemsSigned-offBP Mechanical06/23/2022
DOB NOWGeneral ConstructionSigned-offTraditional Line05/24/2022
DOB NOWMechanical SystemsSigned-offTraditional Line05/24/2022
DOB NOWPlumbingSigned-offS&H Plumbing02/11/2022
DOB NOWGeneral ConstructionSigned-offTraditional Line01/27/2022
DOB NOWMechanical SystemsSigned-offTraditional Line01/27/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation10/09/2018
DOB NOWSupported ScaffoldSigned-offIntersystem Installation10/09/2018
DOB NOWSupported ScaffoldSigned-offIntersystem Installation09/28/2018
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/21/2018
BISOTISSUEDHighline Construction GR10/11/2018
BISMHISSUEDHighline Construction GR10/11/2018
BISOTISSUEDHighline Construction GR10/11/2018
BISPLISSUEDDonato Plumbing04/12/2018
BISMHISSUEDHighline Construction GR12/12/2017
BISOTISSUEDHighline Construction GR12/12/2017
BISOTISSUEDHighline Construction GR12/12/2017
BISFSISSUEDApproved Oil Co of Brooklyn07/10/2017
BISFSISSUEDApproved Oil Co of Brooklyn11/16/2016
BISMHISSUEDSilverlining Interiors09/27/2016
BISOTISSUEDSilverlining Interiors09/27/2016
BISOTISSUEDSilverlining Interiors09/27/2016
BISPLISSUEDNew Millennium P & H06/28/2016
+ 37 more permits on file
1 project · most recent 05/29/2025
Air Conditioning Systems
FiledStatusContractorScope
05/29/2025Signed-offDivision One ContractingAir Conditioning Systems
2 projects · most recent 11/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/06/2026——Gas, Water/Sanitary
05/29/2025Signed-offHod Piping & HeatingGas, Water/Sanitary
13 projects · most recent 03/16/2026
General Wiring
FiledStatusContractorScope
03/16/2026CompleteWMS Electrical ContngGeneral Wiring
03/14/2026CompletePrudent ElectricGeneral Wiring
01/06/2026CompleteJoseph Weinstein ElectricGeneral Wiring
01/08/2025CompleteR. GunzerGeneral Wiring
11/21/2024CompleteJoseph Weinstein ElectricGeneral Wiring
05/14/2024Permit IssuedVertex Electric—
04/02/2024Permit IssuedMax Electric CoGeneral Wiring
09/22/2023CompleteWMS Electrical Contng—
12/19/2022CompleteAnthony G Ferry—
02/09/2022Permit IssuedR-2 ElectricGeneral Wiring
09/18/2018CompleteSteven Farkas—
09/05/2018Permit IssuedAwesome Electl Contng—
07/10/2018CompleteApollo ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/18/2026Lighting in dwelling units—energy_progress
08/17/2026Energy Code Compliance Inspections—progress
08/17/2026HVAC-R and service water piping design and insulationKeith Buckleyenergy_progress
08/17/2026Post-installed Anchors—special
08/14/2026Fire-Resistant Penetrations and Joints—special
08/14/2026Final—progress
07/17/2025Mechanical SystemsEric Danielsspecial
07/17/2025MasonryEric Danielsspecial
07/17/2025Fire-Resistant Penetrations and JointsEric Danielsspecial
07/17/2025Lighting in dwelling unitsEric Danielsenergy_progress
07/17/2025Lighting controlsEric Danielsenergy_progress
07/17/2025Interior lighting powerEric Danielsenergy_progress
07/17/2025FinalEric Danielsprogress
07/17/2025Fire-Resistance Rated ConstructionEric Danielsprogress
04/18/2025Fire-Resistant Penetrations and JointsEric Danielsspecial
04/18/2025Lighting in dwelling unitsEric Danielsenergy_progress
04/18/2025Lighting controlsEric Danielsenergy_progress
04/18/2025Interior lighting powerEric Danielsenergy_progress
04/18/2025Fire-Resistance Rated ConstructionEric Danielsprogress
04/18/2025FinalEric Danielsprogress
04/18/2025Mechanical SystemsEric Danielsspecial
04/18/2025MasonryEric Danielsspecial
03/20/2024FinalNicolas Zapataprogress
03/20/2024Fire-Resistant Penetrations and JointsNicolas Zapataspecial
03/20/2024Post-installed AnchorsNicolas Zapataspecial
Latest 25 of 46.
793 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account