326 EAST 48TH STREET
MANHATTAN · BIN 1038912
💬 Discuss this project
1985Year Built
16Stories
Z4Building Class
C1-9Zoning
25,832 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Foreign government · 2,500 sf lot · 10.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsAlgerian MissionUnder Construction2 filings
BulkheadOutrigger system installationUnder Construction1p · 1 filing · 5 docs
Floor 1Algerian MissionUnder Construction1p · 3 filings · 2 docs
CellarAlgerian Mission1p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mission of Algeria to the UN1508/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ Engineering106/17/2026
Ikra Consulting103/13/2026
Gene Kaufman Architect809/29/2025
Asr Engineering108/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gene Kaufman Architect803/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZKW EnterprisesScaffold609/03/2026
Aventador ConstructionGeneral Contractor308/01/2026
Nye-Nec ElectricalElectrical303/21/2026
MPS Plumbing & HeatingPlumbing107/08/2026
N.Y.C. Police DepartmentElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665106/17/2026
Macia Inspection & Testin402609/29/2025
Tristate Planning Engineering8344201/14/2025
Building Lifecycle
All (96)Filed (11)Permit Issued (11)Violation (38)Inspection (2)Objection (4)Special Inspection (30)
09/02/2026
Permit issued — Sidewalk Shed
M01279494-I1-SH
08/10/2026
Permit issued — Sidewalk Shed
M01270752-I1-SH
07/31/2026
Permit issued — General Construction
M01127179-I1-GC
07/23/2026
Permit issued — General Construction
M01127179-I1-GC
06/22/2026
Permit issued — Suspended Scaffold
M01378143-I1-SC
06/17/2026
Filed — Alteration
M01378143-I1
06/11/2026
Permit issued — Supported Scaffold
M01279494-I1-SH
05/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/25/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
03/25/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
03/16/2026
Permit issued — Supported Scaffold
M01279494-I1-SF
03/16/2026
Permit issued — Sidewalk Shed
M01279494-I1-SH
03/13/2026
Filed — Alteration
M01279494-I1
01/22/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Masonry
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nicholas Palumbo
09/30/2025
Special inspection requirement — Luminous Exit Path Markings
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Palumbo
09/30/2025
Special inspection requirement — Final
Nicholas Palumbo
09/30/2025
Special inspection requirement — Post-installed Anchors
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Air barrier - visual inspection
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Air barrier — testing
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Insulation placement and R values
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Vestibules
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Fenestration air leakage
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Fenestration areas
CHUNG CHING JEN
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
09/29/2025
Filed — Alteration
HEREBY SUBMITTING FOR THE RENOVATION OF AN EXISTING 16-STORY OFFICE BUILDING WITH CELLAR. THE SCOPE INCLUDES REPLACEMENT OF WINDOWS, INSTALLATION OF A NEW STOREFRONT, NEW ROOF INSULATION, WATERPROOFING, AND INSTALLATION OF ROOF PAVERS. THERE ARE NO CHANGE
M01127179-P2
08/13/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01270752-I1
08/13/2025
Permit issued — Plumbing
M01105824-S1-PL
08/13/2025
Permit issued — Sidewalk Shed
M01270752-I1-SH
07/28/2025
Permit issued — General Construction
M01127179-I1-GC
07/15/2025
Filed — Alteration
HEREBY SUBMITTING FOR THE RENOVATION OF AN EXISTING 16-STORY OFFICE BUILDING WITH CELLAR. THE SCOPE INCLUDES REPLACEMENT OF WINDOWS, INSTALLATION OF A NEW STOREFRONT, NEW ROOF INSULATION, WATERPROOFING, AND INSTALLATION OF ROOF PAVERS. THERE ARE NO CHANGE
M01127179-P1
07/15/2025
Special inspection requirement — Post-installed Anchors
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Luminous Exit Path Markings
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Masonry
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/15/2025
Special inspection requirement — Final
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Fenestration areas
CHUNG CHING JEN
07/15/2025
Special inspection requirement — Air barrier - visual inspection
CHUNG CHING JEN
05/15/2025
Objection resolved — Addressed
05/15/2025
Objection resolved — Addressed
05/01/2025
Objection raised — Cost
02/21/2025
Objection raised — Admin
02/06/2025
Filed — Alteration
HEREBY SUBMITTING FOR THE RENOVATION OF AN EXISTING 16-STORY OFFICE BUILDING WITH CELLAR. THE SCOPE INCLUDES REPLACEMENT OF WINDOWS, INSTALLATION OF A NEW STOREFRONT, NEW ROOF INSULATION, WATERPROOFING, AND INSTALLATION OF ROOF PAVERS. THERE ARE NO CHANGE
M01127179-S4
01/14/2025
Filed — Alteration
HEREBY SUBMITTING FOR THE RENOVATION OF AN EXISTING 16-STORY OFFICE BUILDING WITH CELLAR. THE SCOPE INCLUDES REPLACEMENT OF WINDOWS, INSTALLATION OF A NEW STOREFRONT, NEW ROOF INSULATION, WATERPROOFING, AND INSTALLATION OF ROOF PAVERS. THERE ARE NO CHANGE
M01127179-S2
01/09/2025
Filed — Alteration
M01151098-I1
01/09/2025
Filed — Alteration
HEREBY FILING FOR INTERIOR DEMO OF NON-BEARING PARTITIONS, CEILINGS, FLOORS. REMOVAL OF EXISTING WINDOWS. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01105824-S1
11/21/2024
Filed — Alteration
HEREBY SUBMITTING FOR THE RENOVATION OF AN EXISTING 16-STORY OFFICE BUILDING WITH CELLAR. THE SCOPE INCLUDES REPLACEMENT OF WINDOWS, INSTALLATION OF A NEW STOREFRONT, NEW ROOF INSULATION, WATERPROOFING, AND INSTALLATION OF ROOF PAVERS. THERE ARE NO CHANGE
M01127179-I1
10/16/2024
Filed — Alteration
HEREBY FILING FOR INTERIOR DEMO OF NON-BEARING PARTITIONS, CEILINGS, FLOORS. REMOVAL OF EXISTING WINDOWS. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01105824-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedZKW Enterprises09/02/2026
DOB NOWSidewalk ShedPermit IssuedZKW Enterprises08/10/2026
DOB NOWGeneral ConstructionPermit IssuedAventador Construction07/31/2026
DOB NOWGeneral ConstructionPermit IssuedAventador Construction07/23/2026
DOB NOWSuspended ScaffoldPermit IssuedSasco Construction Service06/22/2026
DOB NOWSupported ScaffoldPermit IssuedZKW Enterprises06/11/2026
DOB NOWSupported ScaffoldPermit IssuedZKW Enterprises03/16/2026
DOB NOWSidewalk ShedPermit IssuedZKW Enterprises03/16/2026
DOB NOWPlumbingPermit IssuedMPS Plumbing & Heating08/13/2025
DOB NOWSidewalk ShedPermit IssuedZKW Enterprises08/13/2025
DOB NOWGeneral ConstructionPermit IssuedAventador Construction07/28/2025
BISEQISSUEDBellet Construction Co05/03/2004
BISOTISSUEDBellet Construction Co04/30/2004
BISEQISSUEDBellet Construction Co04/16/2003
BISOTISSUEDRegal Construction07/01/1994
1 project · most recent 09/29/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/29/2025Permit IssuedAventador ConstructionAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-SM48NAM 5 tons · Condensing Unit ×10
MXZ-SM60NAM 5 tons · Condensing Unit ×3
MUZ-FS12NAH 1 tons · Condensing Unit ×2
MXZ-4C36NA3 3 tons · Condensing Unit ×1
MXZ-SMT2TAM 6 tons · Condensing Unit ×1
PUZ-A42NKA7 4 tons · Condensing Unit ×1
Heating
Mitsubishi Electric PEAD-A30AA8 3 tons · Vrf Indoor ×1
PEAD-A42AA7 4 tons · Vrf Indoor ×1
SLZ-KF12NA 2 tons · Heat Pump Outdoor ×1
SVZ-KP18NA 2 tons · Heat Pump Outdoor ×1
2 projects · most recent 09/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
09/29/2025——Storm, Water/Sanitary
01/09/2025Permit IssuedMPS Plumbing & HeatingStorm, Water/Sanitary
5 projects · most recent 12/20/2025
General Wiring
FiledStatusContractorScope
12/20/2025Permit IssuedP.L. Electrical ContractingGeneral Wiring
08/14/2025Permit IssuedRichard Neu—
08/05/2025Permit IssuedP.L. Electrical Contracting—
06/26/2023Permit IssuedNee Electrical—
11/16/2022Permit IssuedInara Electric—
1 project · most recent 09/29/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/29/2025Permit IssuedAventador ConstructionSteel, Concrete, Masonry
1 project · most recent 08/13/2025
Sidewalk Shed
FiledStatusContractorScope
08/13/2025Permit IssuedZKW EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/22/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
03/25/2026Post-installed AnchorsKarol Zdancewiczspecial
03/25/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
09/30/2025Structural Stability – Alterations of existing buildingsCHUNG CHING JENspecial
09/30/2025Exterior Insulation and Finish Systems (EIFS)CHUNG CHING JENspecial
09/30/2025MasonryCHUNG CHING JENspecial
09/30/2025Tenant Protection Plan ComplianceNicholas Palumbospecial
09/30/2025Luminous Exit Path MarkingsCHUNG CHING JENspecial
09/30/2025Energy Code Compliance InspectionsNicholas Palumboprogress
09/30/2025FinalNicholas Palumboprogress
09/30/2025Post-installed AnchorsCHUNG CHING JENspecial
09/30/2025Air barrier - visual inspectionCHUNG CHING JENenergy_progress
09/30/2025Air barrier — testing CHUNG CHING JENenergy_progress
09/30/2025Insulation placement and R valuesCHUNG CHING JENenergy_progress
09/30/2025VestibulesCHUNG CHING JENenergy_progress
09/30/2025Fenestration and door U-factor and product ratingsCHUNG CHING JENenergy_progress
09/30/2025Fenestration air leakageCHUNG CHING JENenergy_progress
09/30/2025Fenestration areasCHUNG CHING JENenergy_progress
09/30/2025Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
07/15/2025Post-installed AnchorsCHUNG CHING JENspecial
07/15/2025Exterior Insulation and Finish Systems (EIFS)CHUNG CHING JENspecial
07/15/2025Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
07/15/2025Luminous Exit Path MarkingsCHUNG CHING JENspecial
07/15/2025MasonryCHUNG CHING JENspecial
07/15/2025Structural Stability – Alterations of existing buildingsCHUNG CHING JENspecial
07/15/2025Tenant Protection Plan Compliance—special
Latest 25 of 60.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Algerian MissionGovernment / CivicCellar, Floors 1–17, Roof
Project M01151098 Alteration · Approved · 01/09/2025
Project M01127179 Alteration · Permit Entire · 11/21/2024
Project M01105824 Alteration · Permit Entire · 10/16/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026M01105824-I1Request digital key ↗
08/25/2026M01105824-S1Request digital key ↗
08/25/2026M01151098-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
05/22/2025141027458Open ↗
▸Seals & Professional Certifications58
▸DOB NOWSpecial Inspector Seal & Signature24
08/31/2026M01105824-S1Open ↗
08/28/2026M01127179-I1Open ↗
08/28/2026M01127179-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026M01127179-S2Open ↗
09/01/2026M01127179-S2Open ↗
09/01/2026M01127179-S2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026M01127179-P1Open ↗
08/21/2026M01127179-I1Open ↗
08/18/2026M01279494-I1Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/22/2025141027458Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/22/2025141027458Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/22/2025141027458Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026M01127179-P1Open ↗
08/21/2026M01127179-I1Open ↗
08/13/2026M01127179-P2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/22/2025141027458Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/22/2025141027458Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/22/2025141027458Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/16/2026M01378143-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01378143-I1Open ↗