HPD09/24/2025§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FRONT YARD
HPD09/24/2025§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB03/18/1994V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
ECB09/17/2008FAIL MAINTAIN BLDG IN COMPLIANT MANNER:INSTALL/MAINTAIN PLUMBING EQUIPPC 102.3 27-902. IMPROPER CAP ON WASTE PIPING ON 2ND FL BATHROOM BEHIND TOILET IN HALL. REMEDY: REMOVE NON COMPLY MATERIALSNothing owed — awaiting certificate of correction
ECB07/14/2004FAILURE TO MAINTAIN EXTERIOR OF BUILDING FACADE ISSUES. 1) NORTH ELEVATION, EAST END SHOWS EXTENSIVE STEP CRACKS, OPEN MORTAR JOINTS AND BULGING IN FACADE. REMEDY: MAKE AREA SAFE, ERECT SIDE WALK SHED, REPAIRNothing owed — awaiting certificate of correction