Walk-up apt, over six families with stores
326 GRAHAM AVENUE
BROOKLYN · East Williamsburg · BIN 3322922
💬 Discuss this project
1920Year Built
4Stories
C7Building Class
R6AZoning
12,000 sfGross Floor Area
14Units
Rent Stabilized30 Open Violations 24 unresolved · 6 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: AMELIA AND CELINE REALTY LLC · 5,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
Roof3p · 3 filings · 20 docs
Floor 4Under Construction22p · 4 filings · 20 docs
Floor 3Under Construction18p · 3 filings · 20 docs
Floor 2Under Construction18p · 3 filings · 20 docs
Floor 1Under Construction19p · 3 filings · 20 docs
CellarUnder Construction21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
326 328 GRAHAM AVE2107/08/2026
MAMC CONSULTING REPS203/22/2026
AMELIA AND CELINE REALTY403/22/2026
REPS LLC MAMC CONSULTING103/22/2026
326-328 GRAHAM103/22/2026
PAYCO103/21/2026
326 GRAHAM AVENUE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/17/2024$6.0M—326/328 GRAHAM AVENUE CORP. → AMELIA AND CELINE REALTY LLC$500/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES J. LEONARD, ARCHITECT1108/03/2026
WELLWORTH CONSULTING LLC509/10/2025
CONSTSCAPE107/10/2025
ELEVATED ENGINEERING, PLLC108/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GUERRERO'S INC.103/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
UNITED SAFETY CONSULTANTS503/21/2026
GUERREROS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor807/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor404/09/2026
CLIFTON WALDRONElectrical103/21/2026
PRIORE CONSTRUCTION SVCSGeneral Contractor107/08/2026
S. TIEGER PLBG. CO., INCPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES J. LEONARD ARCHITEC3907908/03/2026
RE ARCHITECTURE,PLLC DBA8647107/10/2025
ELEVATED ENGINEERING PLLC3692108/03/2023
Building Lifecycle
All (138)Filed (18)Permit Issued (10)Signed Off (5)Violation (32)Inspection (8)Objection (35)Special Inspection (30)
08/19/2026
Signed off — Alteration
Installation of 50 linear feet of temporary construction fencing, made of wood at rear yard,
B01117149-I1
08/19/2026
Objection resolved — Addressed
08/19/2026
Objection resolved — Addressed
08/19/2026
Objection resolved — Addressed
08/17/2026
Objection raised — Cost
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
08/12/2026
Signed off — Alteration
Interior renovation of three (3) existing dwelling units. PAA - Replacement of rear masonry wall 2nd, 3rd & 4th Floors. PAA (2) - The addition of structural steel for the required remedial work under PAA no. 2
B01117136-I1
08/03/2026
Filed — Alteration
Plumbing work associated with the renovation of an existing four story + cellar three family and one commercial unit. PAA file for plumbing as built conditions; gas stoves & gas dryers replaced with electric stoves and gas dryers,
B01141016-P3
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Scope
07/31/2026
Objection raised — Scope
07/31/2026
Objection raised — Scope
07/31/2026
Special inspection requirement — Maintenance information
JAMES LEONARD
07/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES LEONARD
07/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES LEONARD
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES LEONARD
07/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES LEONARD
07/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES LEONARD
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES LEONARD
07/21/2026
Filed — Alteration
The interior renovation of existing 3 family dwelling units on the 2nd, 3rd and 4th floors in an existing four story building.
B01215044-P1
06/30/2026
Filed — Alteration
Plumbing work associated with the renovation of an existing four story + cellar three family and one commercial unit. PAA file for plumbing as built conditions; gas stoves & gas dryers replaced with electric stoves and gas dryers,
B01141016-P2
06/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES LEONARD
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES LEONARD
06/29/2026
Special inspection requirement — Maintenance information
JAMES LEONARD
06/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES LEONARD
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES LEONARD
06/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES LEONARD
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES LEONARD
06/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/17/2026
Objection raised — Other
06/17/2026
Objection resolved — Addressed
06/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/10/2026
Filed — Alteration
Plumbing work associated with the renovation of an existing four story + cellar three family and one commercial unit. PAA file for plumbing as built conditions; gas stoves & gas dryers replaced with electric stoves and gas dryers,
B01141016-P1
06/05/2026
Special inspection requirement — Maintenance information
JAMES LEONARD
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES LEONARD
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES LEONARD
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES LEONARD
06/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES LEONARD
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES LEONARD
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES LEONARD
06/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/17/2026
Special inspection requirement — Structural Wood Frame
JAMES LEONARD
05/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES LEONARD
05/17/2026
Special inspection requirement — Final
JAMES LEONARD
05/17/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES LEONARD
05/17/2026
Special inspection requirement — Wood – Seismic Resistance
05/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES LEONARD
05/17/2026
Special inspection requirement — Wood – Prefabricated I-Joists
JAMES LEONARD
05/17/2026
Special inspection requirement — Structural Cold-Formed Steel
JAMES LEONARD
05/17/2026
Special inspection requirement — Vestibules
JAMES LEONARD
05/04/2026
Violation issued (HPD, open)
A
04/06/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT DEVOE STREET AND EAST PARKING LOT ELEVATIONS.
B01177426-I1
04/03/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT DEVOE STREET AND EAST PARKING LOT ELEVATIONS.
B01177426-S2
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/04/2026
Permit issued — Mechanical Systems
B01215044-I1-GC-CX
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMAMC CONSULTING REPS LLC03/04/2026
DOB NOWGeneral ConstructionSigned-offMAMC CONSULTING REPS LLC12/24/2025
DOB NOWConstruction FenceSigned-offMAMC CONSULTING REPS LLC11/28/2025
DOB NOWPlumbingPermit IssuedS. TIEGER PLBG. CO., INC10/10/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/22/2025
DOB NOWGeneral ConstructionSigned-offMAMC CONSULTING REPS LLC06/02/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/25/2025
DOB NOWConstruction FenceSigned-offMAMC CONSULTING REPS LLC11/06/2024
DOB NOWGeneral ConstructionSigned-offMAMC CONSULTING REPS LLC11/01/2024
DOB NOWAntennaSigned-offPRIORE CONSTRUCTION SVCS08/14/2023
BISOTISSUEDSQUAN CONSTRUCTION SERVIC09/30/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC08/24/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/09/2014
BISFSISSUEDMOD VETERANS FUEL OIL CORP03/31/2008
BISMHISSUEDDUAL PURPOSE CORPORATION06/01/2006
BISBLISSUEDMOD VETERANS FUEL OIL CORP01/06/2006
BISOTISSUEDRITEWAY GENERAL CONTRACTING CORP08/12/2005
BISOTISSUEDRITEWAY GENERAL CONTRACTING CORP08/12/2005
BISEQISSUEDCOLGATE SCAFFOLDING08/11/2005
BISEQISSUEDCOLGATE SCAFFOLDING03/28/2005
BISOTISSUEDRITEWAY GENERAL CONTRACTING CORP02/09/2005
BISMHISSUEDARETE DEVELOPMENT INC12/04/2001
1 project · most recent 07/21/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Permit IssuedMAMC CONSULTING REPS LLCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric Heat Pump MXZ SM60 NAM 126,000 CFM · Heat Pump Outdoor ×3
Heating
Mitsubishi Electric Air Handler MSZ FS06 & MSZ FS12NA 130,500 BTU · Fan Coil Indoor ×15
2 projects · most recent 08/03/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/03/2026Permit IssuedS. TIEGER PLBG. CO., INCGas, Water/Sanitary
07/10/2025——Water/Sanitary
3 projects · most recent 03/23/2026
General Wiring
FiledStatusContractorScope
03/23/2026Permit IssuedPK ELECTRIC INCGeneral Wiring
02/14/2025Permit IssuedPK ELECTRIC INC—
01/22/2025CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 07/21/2026
Masonry Wood
FiledStatusContractorScope
07/21/2026Permit IssuedMAMC CONSULTING REPS LLCMasonry, Wood
1 project · most recent 10/31/2024
Fence
FiledStatusContractorScope
10/31/2024Signed-offMAMC CONSULTING REPS LLCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/23/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
07/31/2026Tenant Protection Plan ComplianceJAMES LEONARDspecial
07/31/2026Energy Code Compliance InspectionsJAMES LEONARDprogress
07/31/2026Maintenance informationJAMES LEONARDenergy_progress
07/31/2026HVAC-R and service water heating system controlsJAMES LEONARDenergy_progress
07/31/2026HVAC-R and service water heating equipmentJAMES LEONARDenergy_progress
07/31/2026Fire-Resistant Penetrations and JointsJAMES LEONARDspecial
07/31/2026HVAC-R and service water piping design and insulationJAMES LEONARDenergy_progress
06/29/2026HVAC-R and service water heating equipmentJAMES LEONARDenergy_progress
06/29/2026HVAC-R and service water heating system controlsJAMES LEONARDenergy_progress
06/29/2026HVAC-R and service water piping design and insulationJAMES LEONARDenergy_progress
06/29/2026Maintenance informationJAMES LEONARDenergy_progress
06/29/2026Energy Code Compliance InspectionsJAMES LEONARDprogress
06/29/2026Tenant Protection Plan ComplianceJAMES LEONARDspecial
06/29/2026Fire-Resistant Penetrations and JointsJAMES LEONARDspecial
06/05/2026Fire-Resistant Penetrations and JointsJAMES LEONARDspecial
06/05/2026Tenant Protection Plan ComplianceJAMES LEONARDspecial
06/05/2026Energy Code Compliance InspectionsJAMES LEONARDprogress
06/05/2026Maintenance informationJAMES LEONARDenergy_progress
06/05/2026HVAC-R and service water piping design and insulationJAMES LEONARDenergy_progress
06/05/2026HVAC-R and service water heating system controlsJAMES LEONARDenergy_progress
06/05/2026HVAC-R and service water heating equipmentJAMES LEONARDenergy_progress
05/17/2026Insulation placement and R valuesJAMES LEONARDenergy_progress
05/17/2026MasonryJAMES LEONARDspecial
05/17/2026Mechanical SystemsJAMES LEONARDspecial
05/17/2026Structural Cold-Formed SteelJAMES LEONARDspecial
Latest 25 of 67.
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/27/2026B00888322-I1Request digital key ↗
08/23/2026B01117149-I1Request digital key ↗
08/22/2026B01117136-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION4
10/05/2017321210417Open ↗
08/25/2015321210417Open ↗
07/22/2014320996071Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
10/21/2015321210417Open ↗
08/25/2015321210417Open ↗
07/16/2014320996071Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/02/2017321210417Open ↗
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature41
09/02/2026B01141016-P1Open ↗
09/02/2026B01141016-P1Open ↗
09/02/2026B01141016-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/02/2026B01141016-P1Open ↗
09/02/2026B01141016-P1Open ↗
09/01/2026B01215044-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/23/2026B01117149-I1Open ↗
08/22/2026B01117136-I1Open ↗
08/21/2026B01215044-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/13/2017321210417Open ↗
08/25/2015321210417Open ↗
08/15/2014320996071Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/25/2015321210417Open ↗
07/22/2014320996071Open ↗
03/27/2008310112801Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/25/2015321210417Open ↗
07/22/2014320996071Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/27/2008310112801Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/27/2008310112801Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/22/2026B01117136-I1Open ↗
08/22/2026B01117136-P1Open ↗
08/19/2026B01328550-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/25/2015321210417Open ↗
07/22/2014320996071Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/27/2008310112801Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/13/2017321210417Open ↗
08/25/2015321210417Open ↗
08/15/2014320996071Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/13/2017321210417Open ↗
08/15/2014320996071Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR1 (from plan PDF)2
08/16/2026B01117136-I1Open ↗
08/16/2026B01117136-P2Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
07/22/2014320996071Open ↗
03/27/2008310112801Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
08/15/2014320996071Open ↗
11/13/2017321210417Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/15/2014320996071Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/13/2017321210417Open ↗
08/25/2015321210417Open ↗
08/15/2014320996071Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
08/25/2015321210417Open ↗
03/27/2008310112801Open ↗
▸BISBOROUGH INTAKE FORM1
11/13/2017321210417Open ↗
▸BISADDITIONAL INFORMATION1
10/05/2017321210417Open ↗