← Back
Walk-up cooperative
326 WEST 17 STREET
MANHATTAN · BIN 1013058
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R8BZoning
10,800 sfGross Floor Area
12Units
Rent Stabilized45 Open Violations ▸
Walk-up cooperative · Owner of record: 322-6 WEST 17TH ST HDFC · 3,150 sf lot · 3.43 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY707/08/2026
VERITAS PROPERTY MANAGEMENT1303/22/2026
322-6 WEST 17TH ST HDFC1003/22/2026
322-6 WEST 17THST HDFC103/22/2026
322-6 WEST 17 HDFC V103/22/2026
322-24-26 WEST 17TH ST HDFC303/21/2026
322-324-326 WEST 17 ST HDFC103/21/2026
VETITAS PROPERTY MANAGENT503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING106/23/2023
KZ ENGINEERING, P.C205/26/2021
SYED ENGINEERING, P.C.212/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS203/21/2026
J A EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINSTAR RESTORATION INCGeneral Contractor603/21/2026
FT'S PRECISE HEATING &General Contractor303/21/2026
KINGS GROUP NY CORPGeneral Contractor207/08/2026
ALEXANDER EUGENEElectrical103/21/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARTRIDGE VENTURE ENGINEE7690106/23/2023
KZ ENGINEERING, P.C.4665101/28/2021
Building Lifecycle
All (86)Filed (5)Permit Issued (5)Signed Off (4)Violation (60)Special Inspection (12)
01/07/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, open)
A
01/07/2026
Violation issued (HPD, open)
B
12/04/2024
Violation issued (HPD, open)
A
12/04/2024
Violation issued (HPD, open)
A
04/11/2024
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEMS IN APT. 4W ON THE 4TH FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00874353-I1
08/09/2023
Permit issued — Mechanical Systems
M00874353-I1-MS
06/23/2023
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS IN APT. 4W ON THE 4TH FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00874353-I1
06/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
David Sivin
05/15/2023
Special inspection requirement — Maintenance information
David Sivin
05/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Sivin
05/15/2023
Special inspection requirement — Energy Code Compliance Inspections
David Sivin
05/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
David Sivin
05/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
David Sivin
05/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
David Sivin
05/12/2023
Special inspection requirement — Final
David Sivin
05/12/2023
Special inspection requirement — Mechanical Systems
David Sivin
11/05/2022
Signed off — Alteration
M00460623-I1
02/11/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED, NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00436311-I1
02/11/2022
Signed off — Alteration
M00436312-I1
11/13/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Violation issued (ECB, closed)
Construction
10/01/2021
Violation issued (ECB, closed)
Construction
08/20/2021
Violation issued (ECB, closed)
Unknown
08/17/2021
Violation issued (ECB, closed)
Construction
08/16/2021
Permit issued — Protection and Mechanical Methods
M00460623-I1-PM
07/20/2021
Violation issued (ECB, closed)
Construction
07/08/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Permit issued — Protection and Mechanical Methods
M00460623-I1-PM
06/15/2021
Violation issued (ECB, closed)
Construction
06/02/2021
Special inspection requirement — Final
Karol Zdancewicz
06/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Karol Zdancewicz
05/27/2021
Violation issued (ECB, closed)
Construction
05/26/2021
Filed — Alteration
M00460623-P1
05/20/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
01/28/2021
Filed — Alteration
M00460623-I1
01/12/2021
Violation issued (ECB, closed)
Construction
01/12/2021
Violation issued (ECB, closed)
Construction
01/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/17/2020
Permit issued — Supported Scaffold
M00436312-I1-SF
12/10/2020
Permit issued — Sidewalk Shed
M00436311-I1-SH
12/09/2020
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED, NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00436311-I1
12/09/2020
Filed — Alteration
M00436312-I1
03/17/2020
Violation issued (HPD, closed)
B
03/17/2020
Violation issued (HPD, closed)
B
03/17/2020
Violation issued (HPD, open)
B
03/17/2020
Violation issued (HPD, closed)
B
03/12/2018
Violation issued (HPD, closed)
C
03/12/2018
Violation issued (HPD, closed)
A
03/12/2018
Violation issued (HPD, open)
A
03/12/2018
Violation issued (HPD, open)
A
03/12/2018
Violation issued (HPD, open)
B
01/23/2018
Violation issued (HPD, open)
B
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFT'S PRECISE HEATING &08/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offWINSTAR RESTORATION INC08/16/2021
DOB NOWProtection and Mechanical MethodsSigned-offWINSTAR RESTORATION INC06/15/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP12/17/2020
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/10/2020
BISPLISSUEDTMS PLBG & HEATING CORP03/31/2022
BISOTISSUEDFORM FACTORY CONSTRUCTION10/22/2021
BISOTISSUEDFORM FACTORY CONSTRUCTION01/12/2021
BISOTISSUEDKBRNY, INC03/21/2019
BISPLISSUEDTMS PLBG & HEATING CORP02/13/2019
BISOTISSUEDKBRNY, INC01/30/2019
BISOTISSUEDMC CLEANING AND PAINTIG LLC05/31/2007
BIS—ISSUEDSWEENY TILE & MARBLE10/25/1991
4 projects · most recent 01/10/2023
General Wiring
FiledStatusContractorScope
01/10/2023CompleteOMD ELECTRICAL CORP—
08/25/2021Permit IssuedHIGH QUALITY ELECTRIC OF—
12/11/2020Permit IssuedSPECTRUM ELECTRIC, LLCGeneral Wiring
03/19/2019CompleteGSA ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/22/2023Tenant Protection Plan ComplianceDavid Sivinspecial
05/15/2023Maintenance informationDavid Sivinenergy_progress
05/15/2023Fire-Resistant Penetrations and JointsDavid Sivinspecial
05/15/2023Energy Code Compliance InspectionsDavid Sivinprogress
05/15/2023HVAC-R and service water piping design and insulationDavid Sivinenergy_progress
05/15/2023HVAC-R and service water heating system controlsDavid Sivinenergy_progress
05/15/2023HVAC-R and service water heating equipmentDavid Sivinenergy_progress
05/12/2023FinalDavid Sivinprogress
05/12/2023Mechanical SystemsDavid Sivinspecial
06/02/2021FinalKarol Zdancewiczprogress
06/02/2021Structural Stability – Alterations of existing buildingsKarol Zdancewiczspecial
05/20/2021Structural Stability – Alterations of existing buildings—special
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods2
09/04/2026M00460623-I1Request digital key ↗
09/04/2026M00460623-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00436311-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00436312-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/30/2026M00874353-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION13
08/16/2022140934513Open ↗
07/22/2021140934513Open ↗
12/29/2020121694014Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION9
03/31/2022121694014Open ↗
10/25/2021140934513Open ↗
08/23/2021140934513Open ↗
Showing 3 of 9 on file for this type
▸BISLL114/19 PERMIT RESTRICTION1
10/25/2021140934513Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00436312-I1Open ↗
09/04/2026M00460623-P1Open ↗
09/04/2026M00460623-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026M00460623-I1Open ↗
08/23/2026M00874353-I1Open ↗
08/23/2026M00874353-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026M00460623-I1Open ↗
08/23/2026M00874353-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/29/2019121694014Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/10/2020140934513Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/29/2019121694014Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/10/2020140934513Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/29/2019121694014Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING4
12/29/2020121694014Open ↗
10/28/2020121694014Open ↗
10/13/2020121694014Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/29/2019121694014Open ↗
▸BISPLUMBING (PL) SIGNOFF1
10/31/2022121694014Open ↗
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN1
12/09/2020140934513Open ↗
▸BISTenant Protection Plan and Notes1
12/04/2020140934513Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/10/2020140934513Open ↗
01/29/2019121694014Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/10/2020140934513Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00874353-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/01/2022140934513Open ↗
01/12/2021140934513Open ↗
05/28/2020121694014Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/01/2022121694014Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/31/2022121694014Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/29/2019121694014Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/10/2020140934513Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/01/2022140934513Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/31/2022121694014Open ↗
10/31/2022121694014Open ↗
09/01/2022140934513Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/01/2022121694014Open ↗
09/01/2022140934513Open ↗
▸BISFINAL1
11/01/2022121694014Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/31/2022121694014Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
11/10/2020140934513Open ↗
05/28/2020121694014Open ↗
01/29/2019121694014Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/31/2022121694014Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION8
08/18/2022140934513Open ↗
11/18/2020140934513Open ↗
05/28/2020121694014Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
10/25/2021140934513Open ↗
08/23/2021140934513Open ↗
07/29/2019121694014Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/10/2020140934513Open ↗
▸BISEFILING COVER SHEET1
01/29/2019121694014Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/01/2022140934513Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/26/2021140934513Open ↗