← Back
BuildNYC
Office only, 2-6 stories
Pelham Bay Professional Center
3264 WESTCHESTER AVENUE · BIN 2130741
💬 Discuss this project
1954Year Built
2Stories
O2Building Class
R7-1Zoning
65,596 sfGross Floor Area
23Units
LL97 Covered0 Active Violations
Office only, 2-6 stories · Owner of record: BP Group Bronx Tic · 29,689 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsResidential DevelopmentUnder Construction1 filing
Floor 143250 Pelham Bay LLC.1p · 1 filing · 15 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 13250 Pelham Bay LLC.4p · 1 filing
Cellar3250 Pelham Bay LLC.1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kao Hwa Lee Architects509/11/2026
AG Engineering108/05/2025
Pramodray Shah, P.E107/23/2025
Titan Engineers604/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services1803/21/2026
ZV Drafting103/21/2026
Express Filing203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N Tech Design of AmericaGeneral Contractor208/13/2026
B Contractors GroupScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394508/19/2026
HRF Services5616207/22/2022
Building Lifecycle
All (113)Filed (13)Permit Issued (3)Objection (64)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
09/22/2026
Objection raised — Other
09/22/2026
Objection raised — Other
09/11/2026
Filed — New Building
PROPOSED TEMPORARY 8' HIGH PLYWOOD CONSTRUTION FENCE
X00643959-Z1
08/19/2026
Filed — New Building
PROPOSED TEMPORARY 8' HIGH PLYWOOD CONSTRUTION FENCE
X00643959-P1
08/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
08/17/2026
Special inspection requirement — Maintenance information
Paul Raymond
08/17/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
08/17/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
08/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
08/17/2026
Special inspection requirement — Vestibules
Paul Raymond
08/17/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
08/17/2026
Special inspection requirement — Fenestration areas
Paul Raymond
08/17/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
08/17/2026
Special inspection requirement — Metering
Paul Raymond
08/17/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
08/17/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
08/17/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
08/17/2026
Special inspection requirement — Lighting controls
Paul Raymond
08/17/2026
Special inspection requirement — Interior lighting power
Paul Raymond
08/17/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
08/12/2026
Permit issued — Support of Excavation
X00643959-S1-SE
07/28/2026
Permit issued — General Construction
X00643959-I1-GC
08/06/2025
Permit issued — Construction Fence
X00643959-S9-FN
08/05/2025
Filed — New Building
PROPOSED TEMPORARY 8' HIGH PLYWOOD CONSTRUTION FENCE
X00643959-S9
07/23/2025
Filed — New Building
PROPOSED TEMPORARY 8' HIGH PLYWOOD CONSTRUTION FENCE
X00643959-S8
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2025
Special inspection requirement — Standpipe Systems
07/22/2025
Special inspection requirement — Post-installed Anchors
09/06/2024
421-a(16) registration filed
04/11/2024
Filed — New Building
PROPOSED TEMPORARY 8' HIGH PLYWOOD CONSTRUTION FENCE
X00643959-S6
03/08/2024
Objection resolved — Addressed
03/08/2024
Special inspection requirement — Underpinning
03/08/2024
Special inspection requirement — Post-installed Anchors
03/08/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/08/2024
Special inspection requirement — Underpinning
Paul Raymond
03/08/2024
Special inspection requirement — Concrete - Cast-In-Place
03/08/2024
Special inspection requirement — Subgrade Inspections
03/08/2024
Special inspection requirement — Structural Steel - High Strength Bolting
03/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/08/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/08/2024
Objection raised — Other
02/08/2024
Objection resolved — Addressed
01/05/2024
Objection raised — Other
01/05/2024
Objection resolved — Addressed
01/05/2024
Objection raised — Other
01/05/2024
Objection resolved — Addressed
12/28/2023
Objection raised — Other
12/28/2023
Objection resolved — Addressed
12/28/2023
Objection raised — Other
12/28/2023
Objection resolved — Addressed
12/28/2023
Objection raised — Other
12/28/2023
Objection resolved — Addressed
12/28/2023
Objection raised — Other
12/28/2023
Objection resolved — Addressed
12/22/2023
Objection raised — Other
12/19/2023
Filed — New Building
PROPOSED TEMPORARY 8' HIGH PLYWOOD CONSTRUTION FENCE
X00643959-S3
12/19/2023
Filed — New Building
PROPOSED TEMPORARY 8' HIGH PLYWOOD CONSTRUTION FENCE
X00643959-S1
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedN Tech Design of America08/12/2026
DOB NOWGeneral ConstructionPermit IssuedN Tech Design of America07/28/2026
DOB NOWConstruction FencePermit IssuedB Contractors Group08/06/2025
1 project · most recent 09/11/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/11/2026Permit IssuedN Tech Design of AmericaAir Conditioning Systems, Ventilation Systems
Cooling
Lg ARNU093SJA4 24,200 BTU · Vrf Indoor ×235
ARNU123SJA4 12,300 BTU · Vrf Indoor ×138
ARUN024GSS4 2 tons · Vrf Outdoor ×41
ARUM036GSS5 3 tons · Vrf Outdoor ×22
ARNU243SKA4 24,200 BTU · Vrf Indoor ×18
ARNU123SJAU 12,300 BTU · Vrf Indoor ×10
ARNU183SKSA4 12,300 BTU · Vrf Indoor ×4
ARNU243KA4 9,600 BTU · Vrf Indoor ×2
ARUM048GSS5 4 tons · Vrf Outdoor ×2
ARNU243TNA4 24,200 BTU · Vrf Indoor ×1
ARNU483M3A4 48,100 BTU · Vrf Indoor ×1
Ventilation
Valent VX-352--70D-T 12,000 CFM ×1
1 project · most recent 09/11/2026
Sprinkler System
FiledStatusContractorScope
09/11/2026——Sprinkler System
1 project · most recent 09/11/2026
FiledStatusContractorScope
09/11/2026———
1 project · most recent 11/28/2025
General Wiring
FiledStatusContractorScope
11/28/2025Permit IssuedHivolts ElectricalGeneral Wiring
2 projects · most recent 09/11/2026
Concrete Masonry
FiledStatusContractorScope
09/11/2026Permit IssuedN Tech Design of AmericaConcrete, Masonry
07/22/2022——2 scope_items
1 project · most recent 09/11/2026
Fence
FiledStatusContractorScope
09/11/2026Permit IssuedN Tech Design of AmericaFence
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
08/17/2026Fenestration air leakagePaul Raymondenergy_progress
08/17/2026Maintenance informationPaul Raymondenergy_progress
08/17/2026VestibulesPaul Raymondenergy_progress
08/17/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
08/17/2026Electrical motors and elevatorsPaul Raymondenergy_progress
08/17/2026Fenestration areasPaul Raymondenergy_progress
08/17/2026Insulation placement and R valuesPaul Raymondenergy_progress
08/17/2026MeteringPaul Raymondenergy_progress
08/17/2026Energy Code Compliance InspectionsPaul Raymondprogress
08/17/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
08/17/2026Lighting in dwelling unitsPaul Raymondenergy_progress
08/17/2026Exterior lighting powerPaul Raymondenergy_progress
08/17/2026Lighting controlsPaul Raymondenergy_progress
08/17/2026Air barrier - visual inspectionPaul Raymondenergy_progress
08/17/2026Interior lighting powerPaul Raymondenergy_progress
08/17/2026Air barrier continuity plan testingPaul Raymondenergy_progress
08/17/2026Exterior Insulation and Finish Systems (EIFS)—special
08/17/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/22/2025Fire-Resistant Penetrations and Joints—special
07/22/2025Post-installed Anchors—special
07/22/2025Standpipe Systems—special
03/08/2024UnderpinningPaul Raymondspecial
03/08/2024Excavations - Sheeting, Shoring, and Bracing—special
03/08/2024Post-installed Anchors—special
03/08/2024Structural Steel - High Strength Bolting—special
Latest 25 of 101.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/24/2026X00643959-S3Request digital key ↗
08/24/2026X00643959-S7Request digital key ↗
08/24/2026X00643959-S8Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/23/2025220743756Open ↗
▸Zoning, Tax Lot & Property Records45
▸DOB NOWRestrictive Declaration/Easement 110
10/14/2026X00643959-Z1Open ↗
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-S7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWRestrictive Declaration/Easement 410
10/14/2026X00643959-Z1Open ↗
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-S7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWRestrictive Declaration/Easement 210
10/14/2026X00643959-Z1Open ↗
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-S7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWRestrictive Declaration/Easement 310
10/14/2026X00643959-Z1Open ↗
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-S8Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00643959-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature13
10/14/2026X00643959-Z1Open ↗
08/24/2026X00643959-S6Open ↗
08/24/2026X00643959-S8Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/19/2026X00643959-S2Open ↗
09/02/2026X00716285-I1Open ↗
09/02/2026X00716285-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/19/2026X00643959-S2Open ↗
09/02/2026X00716285-I1Open ↗
09/01/2026X00643959-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/20/2021240313086Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X00643959-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X00643959-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00643959-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026X00716285-P1Open ↗
08/13/2026X00643959-S1Open ↗
08/13/2026X00643959-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram2
08/13/2026X00643959-S2Open ↗
08/13/2026X00716285-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/24/2026X00643959-S1Open ↗
08/13/2026X00716285-I1Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
12/20/2021240313086Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/20/2021240313086Open ↗
▸BISEFILING COVER SHEET1
07/23/2025220743756Open ↗
▸Other Documents11
▸DOB NOWAdjoining Owners Notification3
08/24/2026X00643959-S1Open ↗
08/15/2026X00643959-S2Open ↗
08/13/2026X00716285-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026X00643959-P1Open ↗
08/13/2026X00643959-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026X00643959-P1Open ↗
08/15/2026X00643959-I1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/13/2026X00643959-S6Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/15/2026X00643959-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/20/2026X00643959-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00643959-I1Open ↗