BuildNYC
Hospital, sanitarium, mental institution
St. John's Episcopal Hospital
327 BEACH 19TH STREET · BIN 4430537
💬 Discuss this project
1982Year Built
10Stories
I1Building Class
R5Zoning
119,788 sfGross Floor Area
1Units
LL97 Covered15 Active Violations 8 unresolved · 7 paperwork only 14 likely answered 9 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: Church Charity Foundation of Li · 170,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsSt. John's Episcopal HospitalUnder Construction4 filings
RoofSt. John's Episcopal Hospital, SJE Hospital +125p · 14 filings
PenthouseSt. John's Episcopal Hospital3p · 1 filing · 16 docs
Floor 11St. John's Episcopal Hospital7p · 8 filings
Floor 10St. John's Episcopal Hospital1p · 2 filings
Floor 9St. John's Episcopal Hospital6p · 4 filings
Floor 8St. John's Episcopal Hospital1p · 1 filing
Floor 7St. John's Episcopal Hospital3p · 2 filings
Floor 6St. John's Episcopal Hospital4p · 2 filings
Floor 5St. John's Episcopal Hospital7p · 2 filings
Floor 4St. John's Episcopal Hospital6p · 2 filings
Floor 3St. John's Episcopal Hospital2p · 2 filings
Floor 2St. John's Episcopal Hospital4p · 4 filings
Floor 1St. John's Episcopal Hospital, SJE HospitalUnder Construction2p · 9 filings · 1 doc
MezzanineSt. John's Episcopal Hospital3p · 1 filing · 16 docs
BasementSt. John's Episcopal Hospital6p · 2 filings · 16 docs
Sub-BasementSt. John's Episcopal Hospital6 filings
Site & exteriorSt. John's Episcopal HospitalUnder Construction5 filings · 15 docs
Filed — no permit issuedSt. John's Episcopal Hospital1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St John's Esposcopal Hospital35710/13/2026
Episcopal Health Services3407/08/2026
Church Charity Foundation of Li2603/22/2026
St Johns Associates203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M Expediting2403/21/2026
NH Expediting and Consulting7203/21/2026
K & M Associates703/21/2026
Praxis Workshop403/21/2026
SMN Consulting Services203/21/2026
Noel Building Consulting403/21/2026
KM Associates of New York103/21/2026
Environmental Engineering Solutions603/21/2026
EDG403/21/2026
Loring Consulting Engineers403/21/2026
Synergy Building Consultants203/21/2026
Expediting203/21/2026
PJB Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Shannon GroupGeneral Contractor1907/08/2026
Emcor Services NY/NJGeneral Contractor1107/08/2026
Manager RestroGeneral Contractor1008/22/2026
GSR ContractorScaffold808/30/2026
Icon ContractingGeneral Contractor704/09/2026
Tom Fitzpatrick ElectricalElectrical703/22/2026
PRD GroupScaffold507/08/2026
Dual Fuel Plumbing & HeatingPlumbing507/08/2026
AMS ContractorScaffold407/08/2026
East Enders NYCGeneral Contractor303/21/2026
Dell MechanicalPlumbing207/08/2026
Upright Fire ProtctnFire Protection107/08/2026
Cotroneo & Marino's UntdElectrical103/21/2026
Triple I Electrical Contracting IElectrical103/22/2026
WTG ElectricElectrical103/22/2026
Belfor Long IslandGeneral Contractor107/08/2026
Signature Construction GroupGeneral Contractor107/08/2026
Alpha Group NY1Scaffold106/28/2026
Allstate SprinklerFire Protection107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
WTG ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Valerio Associates13791508/27/2026
Nicholas C Pappas Architects55521508/27/2026
Future Tech Consultants O5892502/02/2026
Comply Building Group86221008/07/2025
Janha Building Ideas6129106/20/2024
Socotec Engineering4983703/21/2024
CL Engineering6781111/03/2021
Nuenergen1717112/18/2020
Building Lifecycle
All (300)Filed (72)Permit Issued (63)Signed Off (19)Facade (FISP) (11)Violation (42)Inspection (22)Objection (41)Special Inspection (30)
09/15/2026
Signed off — Alteration
THIS APPLICATION IS FILED TO DO FACADE REPAIR WORK FOR THE LOCAL LAW 11 AND ALSO TO DISMISS THE VIOLATIONS RELATED TO THIS.
Q00451561-I1
09/15/2026
Signed off — Alteration
Q01270163-I1
09/02/2026
Objection raised — Other
09/02/2026
Objection raised — Inspections
09/02/2026
Objection raised — Inspections
08/28/2026
Permit issued — Sidewalk Shed
Q00764628-I1-SH
08/27/2026
Filed — Alteration
Repurpose portion of pipe shaft into electric closets. Floors 2,3 and 5 through 11. Add electric closet in room on 4th floor as shown on plans. there is no change in use, occupancy or means of egress.
Q08031627-S1
08/27/2026
Filed — Alteration
Repurpose portion of pipe shaft into electric closets. Floors 2,3 and 5 through 11. Add electric closet in room on 4th floor as shown on plans. there is no change in use, occupancy or means of egress.
Q08031627-P2
08/21/2026
Permit issued — General Construction
Q00451561-I1-GC
08/21/2026
Permit issued — General Construction
Q01270163-I1-GC
07/13/2026
Violation issued (ECB, open)
Construction
07/07/2026
Cycle 10 facade report submitted
06/25/2026
Cycle 10 facade inspection completed
06/05/2026
Special inspection requirement — Final
06/05/2026
Special inspection requirement — Concrete - Cast-In-Place
06/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/05/2026
Special inspection requirement — Structural Steel - Details
06/05/2026
Special inspection requirement — Structural Steel - Welding
06/01/2026
Special inspection requirement — Final
Nicholas Pappas
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nicholas Pappas
06/01/2026
Special inspection requirement — Structural Steel - Details
JOHN VALERIO
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Pappas
05/28/2026
Special inspection requirement — Air barrier - visual inspection
Nicholas Pappas
05/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN VALERIO
05/28/2026
Special inspection requirement — Final
Nicholas Pappas
05/28/2026
Special inspection requirement — Masonry
Nicholas Pappas
05/13/2026
Permit issued — Sidewalk Shed
Q00764628-I1-SH
05/08/2026
Filed — Alteration
Q01393200-I1
05/08/2026
Permit issued — Supported Scaffold
Q01393200-I1-SF
04/20/2026
Violation issued (ECB, open)
Local Law
04/17/2026
Signed off — Alteration
Q01003674-I1
03/30/2026
Cycle 10 facade report submitted
03/30/2026
Cycle 10 facade report signed — UNSAFE
03/26/2026
Permit issued — General Construction
Q00451561-I1-GC
03/26/2026
Cycle 10 facade inspection completed
03/25/2026
Permit issued — Structural
Q08031627-I1-GC-CX
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Pappas
02/23/2026
Special inspection requirement — Final
Nicholas Pappas
02/23/2026
Special inspection requirement — Structural Steel - Details
JOHN VALERIO
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nicholas Pappas
02/22/2026
Cycle 8 facade report signed — SWARMP
02/16/2026
Special inspection requirement — Final
Nicholas Pappas
02/16/2026
Special inspection requirement — Air barrier - visual inspection
Nicholas Pappas
02/16/2026
Special inspection requirement — Masonry
Nicholas Pappas
02/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN VALERIO
02/16/2026
Special inspection requirement — Energy Code Compliance
Nicholas Pappas
02/12/2026
Permit issued — Sidewalk Shed
Q00764628-I1-SH
02/02/2026
Filed — Alteration
APPLICATION FILED TO INSTALL (1) ONE ADDITIONAL STEAM BOILER IN CONJUNCTION WITH Q00975247-S1 STEAM-TO-HOT WATER CONVERSION.
Q00975247-A3
02/02/2026
Filed — Alteration
APPLICATION FILED TO INSTALL (1) ONE ADDITIONAL STEAM BOILER IN CONJUNCTION WITH Q00975247-S1 STEAM-TO-HOT WATER CONVERSION.
Q00975247-A2
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
02/02/2026
Special inspection requirement — Maintenance information
MARISA HARTE
02/02/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MARISA HARTE
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
02/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
01/28/2026
Filed — Alteration
Repurpose portion of pipe shaft into electric closets. Floors 2,3 and 5 through 11. Add electric closet in room on 4th floor as shown on plans. there is no change in use, occupancy or means of egress.
Q08031627-P1
01/09/2026
Filed — Alteration
MECHANICAL APPLICATION FILED FOR AIR HANDLING UNIT REPLACEMENTS.
Q01006824-P3
01/09/2026
Cycle 10 facade report submitted
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedGSR Contractor08/28/2026
DOB NOWGeneral ConstructionSigned-offManager Restro08/21/2026
DOB NOWGeneral ConstructionSigned-offManager Restro08/21/2026
DOB NOWSidewalk ShedPermit IssuedGSR Contractor05/13/2026
DOB NOWSupported ScaffoldPermit IssuedAlpha Group NY105/08/2026
DOB NOWGeneral ConstructionSigned-offManager Restro03/26/2026
DOB NOWStructuralPermit IssuedIcon Contracting03/25/2026
DOB NOWSidewalk ShedPermit IssuedGSR Contractor02/12/2026
DOB NOWBoiler EquipmentPermit IssuedDual Fuel Plumbing & Heating11/13/2025
DOB NOWBoiler EquipmentPermit IssuedDual Fuel Plumbing & Heating11/13/2025
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. Restoration10/27/2025
DOB NOWGeneral ConstructionSigned-offManager Restro10/27/2025
DOB NOWGeneral ConstructionSigned-offManager Restro07/29/2025
DOB NOWMechanical SystemsPermit IssuedEmcor Services NY/NJ07/08/2025
DOB NOWGeneral ConstructionPermit IssuedIcon Contracting04/23/2025
DOB NOWMechanical SystemsSigned-offThe Shannon Group04/21/2025
DOB NOWGeneral ConstructionSigned-offThe Shannon Group04/21/2025
DOB NOWGeneral ConstructionSigned-offManager Restro03/31/2025
DOB NOWGeneral ConstructionSigned-offThe Shannon Group03/06/2025
DOB NOWMechanical SystemsSigned-offThe Shannon Group03/06/2025
DOB NOWMechanical SystemsSigned-offThe Shannon Group03/06/2025
DOB NOWMechanical SystemsPermit IssuedEmcor Services NY/NJ02/12/2025
DOB NOWGeneral ConstructionSigned-offEmcor Services NY/NJ01/22/2025
DOB NOWGeneral ConstructionPermit IssuedEmcor Services NY/NJ01/22/2025
DOB NOWGeneral ConstructionPermit IssuedEmcor Services NY/NJ01/22/2025
DOB NOWMechanical SystemsPermit IssuedEmcor Services NY/NJ01/22/2025
DOB NOWGeneral ConstructionPermit IssuedEmcor Services NY/NJ01/22/2025
DOB NOWMechanical SystemsPermit IssuedEmcor Services NY/NJ01/22/2025
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. Restoration01/13/2025
DOB NOWGeneral ConstructionPermit IssuedIcon Contracting12/12/2024
DOB NOWSprinklersSigned-offH.J. Flood10/22/2024
DOB NOWPlumbingSigned-offDell Mechanical10/21/2024
DOB NOWEarth WorkSigned-offSignature Construction GR10/21/2024
DOB NOWMechanical SystemsSigned-offThe Shannon Group07/15/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. Restoration07/01/2024
DOB NOWGeneral ConstructionSigned-offThe Shannon Group06/07/2024
DOB NOWSidewalk ShedPermit IssuedGSR Contractor06/06/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. Restoration06/05/2024
DOB NOWStructuralSigned-offThe Shannon Group05/07/2024
DOB NOWGeneral ConstructionSigned-offThe Shannon Group04/22/2024
+ 60 more permits on file
2 projects · most recent 01/07/2026
Air Conditioning Systems Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
01/07/2026Permit IssuedEmcor Services NY/NJAir Conditioning Systems
Cooling
Broad Usa BZ100-d BZ76XIID-D-36.4/29.4-6.7/13.7-d-Fa-Ma-B3-100 250 tons · Chiller ×2
08/07/2025Permit IssuedEmcor Services NY/NJCooling Towers
Cooling Tower
Marley NC8403PAN4SGF2025 1,913 tons · Cooling Tower ×8
3 projects · most recent 02/02/2026
Gas Medical Gas
FiledStatusContractorScope
02/02/2026Permit IssuedDual Fuel Plumbing & HeatingGas
01/07/2026Signed-offDual Fuel Plumbing & HeatingGas
06/21/2021——Medical Gas
25 projects · most recent 10/09/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
10/09/2026Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
04/27/2026Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
12/20/2025Permit IssuedWTG ElectricGeneral Wiring
12/20/2025Permit IssuedWTG ElectricGeneral Wiring
08/19/2025Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
08/18/2025Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
07/18/2025Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
03/01/2025Permit IssuedWTG ElectricGeneral Wiring
10/31/2024Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
10/02/2024Permit IssuedRaikos ElectricGeneral Wiring
05/21/2024Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
04/21/2024Permit IssuedDeluxe Electrical & MaintenanceGeneral Wiring
03/29/2024Permit IssuedWTG ElectricGeneral Wiring
11/27/2023CompleteTriple I Electrical Contracting IGeneral Wiring
06/14/2023Permit IssuedTom Fitzpatrick ElectricalGeneral Wiring
4 projects · most recent 08/27/2026
Steel Masonry
FiledStatusContractorScope
08/27/2026Permit IssuedIcon Contracting1 scope_items
01/09/2026Permit IssuedEmcor Services NY/NJSteel
12/13/2023——Steel, Masonry
10/24/2023——Masonry
1 project · most recent 07/01/2022
Sidewalk Shed
FiledStatusContractorScope
07/01/2022Permit IssuedGSR ContractorSidewalk Shed
1 project · most recent 06/20/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/20/2024Permit IssuedM.G.R. RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
06/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2024Certified Medical Gas - MG - PL - FinishCertifiedView ↗
04/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/05/2026Structural Steel - Welding—special
06/05/2026Structural Stability – Alterations of existing buildings—special
06/05/2026Final—progress
06/05/2026Concrete - Cast-In-Place—special
06/05/2026Structural Steel - Details—special
06/05/2026Structural Steel - High Strength Bolting—special
06/01/2026FinalNicholas Pappasprogress
06/01/2026Structural Steel - DetailsJOHN VALERIOspecial
06/01/2026Fire-Resistance Rated ConstructionNicholas Pappasprogress
06/01/2026Fire-Resistant Penetrations and JointsNicholas Pappasspecial
05/28/2026FinalNicholas Pappasprogress
05/28/2026MasonryNicholas Pappasspecial
05/28/2026Air barrier - visual inspectionNicholas Pappasenergy_progress
05/28/2026Structural Stability – Alterations of existing buildingsJOHN VALERIOspecial
02/23/2026FinalNicholas Pappasprogress
02/23/2026Fire-Resistance Rated ConstructionNicholas Pappasprogress
02/23/2026Structural Steel - DetailsJOHN VALERIOspecial
02/23/2026Fire-Resistant Penetrations and JointsNicholas Pappasspecial
02/16/2026FinalNicholas Pappasprogress
02/16/2026Energy Code ComplianceNicholas Pappasprogress
02/16/2026Air barrier - visual inspectionNicholas Pappasenergy_progress
02/16/2026MasonryNicholas Pappasspecial
02/16/2026Structural Stability – Alterations of existing buildingsJOHN VALERIOspecial
02/02/2026HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
02/02/2026HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. John's Episcopal HospitalMedical / HealthcareSub-basement, Floors 1–11, Roof
Project Q01270163 Alteration · LOC Issued · 09/09/2025
Project Q08031627 Alteration · Permit Entire · 11/04/2024
Project Q01029192 Alteration · LOC Issued · 08/07/2024
Project Q01029189 Alteration · LOC Issued · 06/24/2024
Project Q01069799 Alteration · Permit Entire · 06/20/2024
Project Q01029198 Alteration · LOC Issued · 06/10/2024
Project Q01029175 Alteration · LOC Issued · 05/28/2024
Project Q00976782 Alteration · Permit Entire · 05/06/2024
Project Q01033432 Alteration · Approved · 04/18/2024
Project Q00998216 Alteration · LOC Issued · 04/02/2024
Project Q00975247 Alteration · Permit Entire · 03/21/2024
Project Q01006824 Alteration · Permit Entire · 03/11/2024
SJE HospitalMedical / HealthcareFloor 1, Roof
Project Q01227269 Alteration · Permit Entire · 05/22/2025
Project Q00991963 Alteration · Permit Entire · 01/19/2024
Project Q00966196 Alteration · Approved · 12/13/2023
St. John Episcopal Hospital PharmacyMedical / HealthcareRoof
Project Q01033947 Alteration · Approved · 04/22/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,013 on file (BIS + DOB NOW)
▸Plans & Drawings78
▸DOB NOWPlans/Sketch66
08/27/2026Q00605778-I1Request digital key ↗
08/26/2026Q00660414-I1Request digital key ↗
08/26/2026Q00672549-I1Request digital key ↗
Showing 3 of 66 on file for this type
▸DOB NOWPlans/Sketch - General Construction8
08/27/2026Q00471352-P1Request digital key ↗
08/27/2026Q00471352-I1Request digital key ↗
08/27/2026Q00471352-P5Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/28/2026Q00221066-I1Request digital key ↗
08/27/2026Q00435338-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/27/2026Q00395349-I1Request digital key ↗
▸Applications & Permits148
▸BISPLAN / WORK APPROVAL APPLICATION88
11/24/2025420963390Open ↗
11/10/2025420963390Open ↗
11/05/2025420963390Open ↗
Showing 3 of 88 on file for this type
▸BISWORK PERMIT APPLICATION60
12/28/2021440658049Open ↗
05/06/2020440591183Open ↗
02/28/2020420963407Open ↗
Showing 3 of 60 on file for this type
▸Seals & Professional Certifications323
▸DOB NOWDPL-1: Design Professional Seal & Signature77
08/27/2026Q00435338-I1Open ↗
08/27/2026Q00395349-I1Open ↗
08/27/2026Q00471352-P1Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWProgress Inspector Seal & Signature75
09/29/2026Q00471352-P1Open ↗
09/27/2026Q00852005-I1Open ↗
09/27/2026Q01006824-I1Open ↗
Showing 3 of 75 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION69
04/30/2020421892161Open ↗
04/29/2020421892170Open ↗
04/29/2020421892170Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature60
10/03/2026Q01006824-S1Open ↗
09/29/2026Q00471352-P1Open ↗
09/29/2026Q00471352-P1Open ↗
Showing 3 of 60 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
02/19/2021440658049Open ↗
02/26/2020421892161Open ↗
02/19/2019421892170Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
09/10/2014421022253Open ↗
Showing 1 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
02/19/2019421892170Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
05/01/2015440216678Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/24/2020440658067Open ↗
▸Trade Schedules & Equipment56
▸BISSELF-CERT PLUMBING NOTICE19
08/07/2015440216678Open ↗
07/22/2015440216678Open ↗
03/25/2015420963407Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING11
05/01/2015440216678Open ↗
Showing 1 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS7
04/30/2020421892161Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/19/2019421892170Open ↗
02/19/2019421892161Open ↗
10/10/2017420963407Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/14/2020421892161Open ↗
05/06/2020421892161Open ↗
04/29/2020421892161Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection4
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos87
▸DOB NOWDEP ACP-5: Asbestos Assessment Report49
08/27/2026Q00605778-I1Open ↗
08/26/2026Q00691194-I1Open ↗
08/26/2026Q00690942-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/01/2015421205289Open ↗
10/01/2015421205289Open ↗
07/16/2014421002836Open ↗
Showing 3 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
06/20/2019421690361Open ↗
02/19/2019421892170Open ↗
02/19/2019421892161Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/10/2014421022253Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026Q00471352-I1Open ↗
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
04/30/2020421892161Open ↗
04/29/2020421892170Open ↗
04/27/2020421690361Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
05/06/2020421690361Open ↗
05/06/2020421892161Open ↗
04/29/2020421892161Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
05/06/2020421690361Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
09/10/2014421022253Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY11
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
05/06/2020421690361Open ↗
Showing 3 of 11 on file for this type
▸BISMANUFACTURE STATEMENT: QUALITY OF MASONRY UNITS-REQUIRED PRIOR TO CONSTRUCTION OF MASONRY (B FORM 10H)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs133
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter72
08/27/2026Q00471352-P5Open ↗
08/27/2026Q00471352-P1Open ↗
08/27/2026Q00471352-I1Open ↗
Showing 3 of 72 on file for this type
▸BISADMINISTRATIVE OBJECTIONS32
09/10/2014421022253Open ↗
07/16/2014421002836Open ↗
07/14/2014421002818Open ↗
Showing 3 of 32 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
05/14/2020421892161Open ↗
05/06/2020421690361Open ↗
04/29/2020421892161Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER3
02/28/2020420963407Open ↗
02/18/2020420963407Open ↗
08/01/2017421205289Open ↗
▸BISFINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT48
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
05/14/2020421892161Open ↗
Showing 3 of 48 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL1
03/30/2015421002836Open ↗
▸Filing & Intake Forms72
▸BISEFILING COVER SHEET37
02/19/2019421892170Open ↗
02/19/2019421892161Open ↗
01/03/2019421716147Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION24
11/25/2025420963390Open ↗
05/06/2020421892161Open ↗
01/28/2020421892161Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM6
04/29/2020421892161Open ↗
04/29/2020421892170Open ↗
04/27/2020421690361Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/24/2020440658067Open ↗
12/22/2020440658049Open ↗
04/03/2020440591183Open ↗
Showing 3 of 5 on file for this type
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
11/25/2025420963390Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
04/03/2020440591183Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type