323 WEST 11 STREET
MANHATTAN · West Village · BIN 1078299
💬 Discuss this project
1897Year Built
5Stories
C6Building Class
R6Zoning
31,206 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized61 Open Violations 59 unresolved · 2 paperwork only ▸
Walk-up cooperative · Owner of record: 323-325-327 WEST 11TH STREET OWNERSCORP. · 8,182 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof11p · 5 filings · 20 docs
Floor 51p · 1 filing · 14 docs
Floor 45p · 2 filings · 19 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEPRINE CONSTRUCTION103/22/2026
DOMINION PROPERTY GROUP903/21/2026
INTERSYSTEMS203/21/2026
323-325-327 WEST 11TH ST OWNERS203/21/2026
323-327 WEST 11TH STREET OWNERS503/21/2026
323-325-327 WEST 11TH STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHERNY ARCHITECT PLLC510/31/2025
RIMKUS NEW YORK PLLC104/04/2025
ASHRAF CORP110/05/2023
GIULIA ALIMONTI101/30/2023
RIP CONSTRUCTION CONSULTANTS203/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIP CC403/21/2026
RIMKUS NEW YORK PLLC203/21/2026
Rigid Structural Design, LLC103/21/2026
DOME K203/21/2026
PS ENGINEERS203/21/2026
JAM CONSULTANTS, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOME K LLCGeneral Contractor1007/08/2026
A.M.N. CORPORATIONPlumbing507/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor303/21/2026
JERRICK ASSOCIATES INCGeneral Contractor203/21/2026
MICHELLE KUO CORPGeneral Contractor203/21/2026
TOMASZ PUZAElectrical103/21/2026
TWO-TONE CONTRACTING CORP.General Contractor107/08/2026
AAA TOTAL PLUMBING, INCPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHERNY ARCHITECT PLLC1925510/31/2025
RIMKUS NEW YORK, PLLC8123104/04/2025
ATLAS ATC ENGINEERING INC8011101/30/2023
CROSSCHECK INSPECTION SER544103/23/2022
Building Lifecycle
All (128)Filed (11)Permit Issued (12)Signed Off (6)Violation (60)Inspection (11)Objection (8)Special Inspection (20)
01/28/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/07/2026
Signed off — Alteration
Relocate 1 water closet, 1 kitchen sink, 1 gas range. Remove 1 bathtub. Install 1 lavatory, 1 shower, 1 dishwasher, 1 washer.
M01012932-S1
11/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
Vladimir Lukyanov-Cherny
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Lukyanov-Cherny
10/31/2025
Filed — Alteration
Relocate 1 water closet, 1 kitchen sink, 1 gas range. Remove 1 bathtub. Install 1 lavatory, 1 shower, 1 dishwasher, 1 washer.
M01012932-P1
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/26/2025
Signed off — Alteration
Relocate 1 water closet, 1 kitchen sink, 1 gas range. Remove 1 bathtub. Install 1 lavatory, 1 shower, 1 dishwasher, 1 washer.
M01012932-I1
08/13/2025
Permit issued — General Construction
M01180538-I1-GC
07/21/2025
Permit issued — Suspended Scaffold
M01248519-I1-SC
07/15/2025
Filed — Alteration
M01248519-I1
07/02/2025
Violation issued (HPD, open)
C
07/02/2025
Violation issued (HPD, closed)
C
06/25/2025
Violation issued (HPD, open)
B
06/25/2025
Violation issued (HPD, open)
B
06/25/2025
Violation issued (HPD, open)
B
06/13/2025
Permit issued — Mechanical Systems
M01012932-I1-GC-CX
04/22/2025
Objection raised — Fire_Protection
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Structural
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Admin
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Structural
04/22/2025
Objection resolved — Addressed
04/04/2025
Filed — Alteration
Roof restoration work and waterproofing as necessary. All work as per plans submitted. No change in use, occupancy or regress proposed under this application.
M01180538-I1
03/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/28/2024
Permit issued — Plumbing
M01012932-S1-PL
06/11/2024
Permit issued — General Construction
M01012932-I1-GC-CX
05/10/2024
Filed — Alteration
Relocate 1 water closet, 1 kitchen sink, 1 gas range. Remove 1 bathtub. Install 1 lavatory, 1 shower, 1 dishwasher, 1 washer.
M01012932-S1
04/25/2024
Filed — Alteration
Relocate 1 water closet, 1 kitchen sink, 1 gas range. Remove 1 bathtub. Install 1 lavatory, 1 shower, 1 dishwasher, 1 washer.
M01012932-I1
02/02/2024
Signed off — Alteration
RENOVATION OF APT 3W ON 3RD FL, PARTITION WORK PER PLANS. INSTALLATION OF A NEW ELECTRIC A/C SYSTEM WITH DUCTWORK IN APT. 3W AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00737437-I1
01/24/2024
Signed off — Alteration
RENOVATION OF APT 3W ON 3RD FL, PARTITION WORK PER PLANS. INSTALLATION OF A NEW ELECTRIC A/C SYSTEM WITH DUCTWORK IN APT. 3W AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00737437-S1
01/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2023
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00936182-I1
10/06/2023
Permit issued — Sidewalk Shed
M00936182-I1-SH
10/05/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00936182-I1
06/23/2023
Permit issued — Mechanical Systems
M00737437-I1-GC-CX
04/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/30/2023
Permit issued — Plumbing
M00737437-S1-PL
03/29/2023
Violation issued (HPD, closed)
A
03/28/2023
Signed off — Alteration
M00686730-I1
03/20/2023
Permit issued — General Construction
M00800852-I1-GC
01/30/2023
Filed — Alteration
M00800852-I1
01/30/2023
Permit issued — General Construction
M00737437-I1-GC-CX
01/05/2023
Filed — Alteration
RENOVATION OF APT 3W ON 3RD FL, PARTITION WORK PER PLANS. INSTALLATION OF A NEW ELECTRIC A/C SYSTEM WITH DUCTWORK IN APT. 3W AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00737437-S1
01/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Vladimir Lukyanov-Cherny
01/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Lukyanov-Cherny
12/23/2022
Filed — Alteration
RENOVATION OF APT 3W ON 3RD FL, PARTITION WORK PER PLANS. INSTALLATION OF A NEW ELECTRIC A/C SYSTEM WITH DUCTWORK IN APT. 3W AND CONDENSING UNIT ON A STEEL BRACKET ATTACHED TO BRICK MASONRY ROOF PARAPET WALL. PL WORK WILL BE FILED SUBSEQUENTLY.
M00737437-I1
12/23/2022
Special inspection requirement — Tenant Protection Plan Compliance
Vladimir Lukyanov-Cherny
12/16/2022
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
12/16/2022
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
12/16/2022
Special inspection requirement — Masonry
GIORGI KHARDZEISHVILI
12/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
12/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Vladimir Lukyanov-Cherny
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP08/13/2025
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP07/21/2025
DOB NOWMechanical SystemsSigned-offDOME K LLC06/13/2025
DOB NOWPlumbingSigned-offA.M.N. CORPORATION06/28/2024
DOB NOWGeneral ConstructionSigned-offDOME K LLC06/11/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC10/06/2023
DOB NOWMechanical SystemsSigned-offDOME K LLC06/23/2023
DOB NOWPlumbingSigned-offA.M.N. CORPORATION03/30/2023
DOB NOWGeneral ConstructionPermit IssuedGE 2A CONSTRUCTION03/20/2023
DOB NOWGeneral ConstructionSigned-offDOME K LLC01/30/2023
DOB NOWGeneral ConstructionSigned-off18-15 REALTY LLC10/18/2022
DOB NOWPlumbingPermit IssuedAAA TOTAL PLUMBING, INC09/09/2022
BISPLISSUEDA.M.N. CORPORATION01/17/2020
BISOTISSUEDA.L ELECTRICAL CORP11/19/2019
BISMHISSUEDA.L ELECTRICAL CORP11/19/2019
BISMHISSUEDA.L ELECTRICAL CORP09/06/2019
BISOTISSUEDA.L ELECTRICAL CORP03/15/2019
BISPLISSUEDA.M.N. CORPORATION11/14/2018
BISOTISSUEDA.L ELECTRICAL CORP09/18/2018
BISPLISSUEDORBIT PLBG & HTG INC10/31/2017
BISOTISSUEDAUGUST CONSTRUCTION GROUP10/31/2017
BISPLISSUEDA.M.N. CORPORATION10/08/2015
BISOTISSUEDDOVEKS INC08/10/2015
BISPLISSUEDAJC PLUMBING & HTG CORP02/26/2013
BISOTISSUEDBLACK SQUARE BUILDERS CORP01/25/2013
BISOTISSUEDBLACK SQUARE BUILDERS CORP01/25/2013
BISEQISSUEDNTERSYSTEMS CORP.09/12/2008
BISOTISSUEDBASONAS CONSTRUCTION CORP07/20/2007
BISOTISSUEDFORTITUDE INC06/28/2005
BISOTISSUEDWHAT'S YOUR PROBLEM ? HANDY SERV06/16/1995
BISFPISSUEDMASTER FIRE PREVENTION SYS INC05/15/1992
4 projects · most recent 05/26/2026
General Wiring
FiledStatusContractorScope
05/26/2026CompleteACCURATE ELEC'L CORP.General Wiring
10/05/2023CompleteBOROWIDE ELECT'L CONTR'S—
04/08/2023CompleteKINGS ELECTRIC CO., INC.General Wiring
04/04/2019CompleteA.L. ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/28/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
11/24/2025Tenant Protection Plan ComplianceVladimir Lukyanov-Chernyspecial
11/24/2025Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
01/03/2023Tenant Protection Plan ComplianceVladimir Lukyanov-Chernyspecial
01/03/2023Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
12/23/2022Tenant Protection Plan ComplianceVladimir Lukyanov-Chernyspecial
12/16/2022FinalGIORGI KHARDZEISHVILIprogress
12/16/2022Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
12/16/2022MasonryGIORGI KHARDZEISHVILIspecial
12/16/2022Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
12/13/2022HVAC-R and service water piping design and insulationVladimir Lukyanov-Chernyenergy_progress
12/13/2022HVAC-R and service water heating equipmentVladimir Lukyanov-Chernyenergy_progress
12/13/2022HVAC-R and service water heating system controlsVladimir Lukyanov-Chernyenergy_progress
12/13/2022Insulation placement and R valuesVladimir Lukyanov-Chernyenergy_progress
12/13/2022Lighting in dwelling unitsVladimir Lukyanov-Chernyenergy_progress
12/13/2022Maintenance informationVladimir Lukyanov-Chernyenergy_progress
06/01/2022Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
05/12/2022Mechanical SystemsVladimir Lukyanov-Chernyspecial
05/12/2022FinalVladimir Lukyanov-Chernyprogress
03/07/2022Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
02/24/2022FinalEUGENE BIFULCOprogress
▾Documents — 204 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026M00686796-I1Request digital key ↗
09/02/2026M00686730-I1Request digital key ↗
09/01/2026M00737437-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION17
01/29/2020123381768Open ↗
12/12/2019140707536Open ↗
12/09/2019140707536Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION14
11/20/2019123381768Open ↗
11/20/2019123478539Open ↗
09/06/2019123478539Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWLPC Approval/Permit9
09/02/2026M00686730-I1Open ↗
08/13/2026M00737437-S1Open ↗
08/13/2026M01012932-S1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications40
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
07/11/2019123381768Open ↗
06/27/2019123478539Open ↗
07/25/2018123381768Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026M00686796-I1Open ↗
09/02/2026M00686730-I1Open ↗
09/01/2026M00800852-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/05/2026M01012932-S1Open ↗
09/01/2026M00737437-I1Open ↗
09/01/2026M00737437-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026M00686730-I1Open ↗
09/01/2026M00737437-I1Open ↗
09/01/2026M00737437-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/16/2017140707536Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/16/2017140707536Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/12/2008110337083Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/16/2017140707536Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/12/2008110337083Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
01/29/2020123381768Open ↗
07/25/2018123381768Open ↗
05/16/2018140707536Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING2
10/16/2017140707536Open ↗
12/05/2012121426670Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/18/2013121426670Open ↗
06/27/2013121426670Open ↗
▸BISPLUMBING (PL) SIGNOFF1
12/03/2021140707536Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/27/2019123478539Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026M00686796-I1Open ↗
09/02/2026M00686730-I1Open ↗
09/01/2026M00800852-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/11/2019123381768Open ↗
06/27/2019123478539Open ↗
10/16/2017140707536Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/12/2008110337083Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
07/11/2019123381768Open ↗
06/27/2019123478539Open ↗
07/25/2018123381768Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/19/2020123478539Open ↗
06/29/2020123381768Open ↗
10/31/2017121426670Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/19/2020123478539Open ↗
06/29/2020123381768Open ↗
10/16/2017140707536Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/03/2021140707536Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/16/2017140707536Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/19/2020123478539Open ↗
06/29/2020123381768Open ↗
10/16/2017140707536Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/03/2021140707536Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/03/2021140707536Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/03/2021140707536Open ↗
08/14/2020123478539Open ↗
06/29/2020123381768Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL4
09/06/2019123478539Open ↗
07/25/2018123381768Open ↗
10/16/2017140707536Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/05/2012121426670Open ↗
09/12/2008110337083Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/09/2019140707536Open ↗
▸BISFINAL1
12/03/2021140707536Open ↗
▸BISLANDMARKS SIGNOFF1
12/03/2021140707536Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
07/19/2020123478539Open ↗
06/29/2020123381768Open ↗
06/27/2019123478539Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/03/2021140707536Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
08/26/2015122418080Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION12
02/07/2020123381768Open ↗
07/11/2019123381768Open ↗
06/27/2019123478539Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM7
01/29/2020123381768Open ↗
12/09/2019140707536Open ↗
06/26/2019123381768Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
06/27/2019123478539Open ↗
07/25/2018123381768Open ↗
07/14/2015122418080Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/16/2017140707536Open ↗
▸Other Documents9
▸DOB NOWProof of Historic Building3
09/02/2026M00686730-I1Open ↗
08/13/2026M00800852-I1Open ↗
08/13/2026M00686796-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/09/2019140707536Open ↗
10/16/2017140707536Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
01/28/2013121426670Open ↗
▸BISPRELIMINARY1
12/03/2021140707536Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01248519-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01248519-I1Open ↗