Predominantly retail with other uses
3276 WESTCHESTER AVENUE
BRONX · Pelham Bay-Country Club-City Island · BIN 2047464
💬 Discuss this project
1954Year Built
2Stories
K4Building Class
R7-1Zoning
19,736 sfGross Floor Area
4Units
0 Open Violations
Predominantly retail with other uses · Owner of record: BP GROUP BRONX TIC LLC · 9,481 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Roof5p · 3 filings · 20 docs
Floor 225p · 2 filings · 20 docs
Floor 131p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARCAL GROUP507/09/2026
CVS HEALTH707/08/2026
MARCAL CONTRACTING1907/08/2026
PELHAM BAY 2007503/22/2026
PECHAM BAY 2007, LLC C/O103/22/2026
PELHAM SO TIC LLC103/22/2026
PELHAM BAR 2007 LLC103/22/2026
PELBAY ASSOCIATES3803/22/2026
OWNER OF 3276 WESTCHESTER203/22/2026
YONA LOVE CONSULTING SERVICES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.203/01/2026
MAE ENGINEERING, PLLC311/11/2025
MCHENERY TESTING LAB510/16/2025
DIGROUPARCHITECTURE406/10/2025
TSF ENGINEERING, PC304/17/2024
STEVEN R. SAVINO ARCHITECT PC302/07/2023
LEON SKVIRSKY PE405/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS803/21/2026
4444 PPPP CORP2003/21/2026
LOXTON1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARCAL CONTRACTING CO LLCGeneral Contractor707/08/2026
BENJAMIN DREBINElectrical303/21/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
HILLEL DIAMANTElectrical203/21/2026
CURRENT MECHS ELEC CONTS 005095General Contractor203/22/2026
JOHN EVAN CONTRACTING CORGeneral Contractor204/09/2026
METFLOW FIRE CONTROL LLCFire Protection107/08/2026
ACCURATE ELECL CORP 002950General Contractor103/22/2026
AFGO MECHANICAL SVCS INCGeneral Contractor107/08/2026
LEMODE PLBG & HTG CORPPlumbing107/08/2026
BIG APPLE SEWER & DRAIN IElectrical103/21/2026
JONG HYUN KIMElectrical103/22/2026
BEST PBG HTG & COOL INCPlumbing107/08/2026
CREATIVE PLUMBING INPlumbing107/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
VARDARO CONSTRUCTION CORPElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281111/11/2025
MCHENERY TESTING LAB9181210/16/2025
METRIC CONSULTING AND INS1803606/10/2025
STEVEN R. SAVINO ARCHIT1216112/17/2019
Building Lifecycle
All (195)Filed (24)Permit Issued (13)Signed Off (7)Violation (52)Inspection (14)Objection (56)Special Inspection (29)
08/25/2026
Signed off — Alteration
Install Fuel Oil storage tank in cellar and relocation of existing belly tank onto Roof along with all associated fuel oil piping, vents, fill, and pump set. Filing supersedes #X01117895-I1 and its scope.
X01309266-I1
07/07/2026
Permit issued — Boiler Equipment
X01309266-I1-BE
06/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/11/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Permit issued — Sign
X01359329-I1-SG
04/07/2026
Permit issued — Sign
X01361982-I1-SG
03/01/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01359329-I1
02/24/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01361982-I1
11/24/2025
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
11/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2025
Objection raised — Mechanical
11/17/2025
Objection raised — Mechanical
11/17/2025
Objection raised — Admin
11/17/2025
Objection raised — Mechanical
11/11/2025
Filed — Alteration
Install Fuel Oil storage tank in cellar and relocation of existing belly tank onto Roof along with all associated fuel oil piping, vents, fill, and pump set. Filing supersedes #X01117895-I1 and its scope.
X01309266-I1
10/17/2025
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
10/17/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
10/16/2025
Filed — Alteration
To install a commercial hood
X01266016-P2
10/16/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
10/15/2025
Filed — Alteration
To install a commercial hood
X01266016-P1
10/15/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
10/15/2025
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
09/29/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/25/2025
Filed — Alteration
Install Fuel Oil storage tank in cellar and relocation of existing belly tank onto Roof along with all associated fuel oil piping, vents, fill, and pump set
X01117895-P1
09/15/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/20/2025
Filed — Alteration
To install a commercial hood
X01266016-S2
08/18/2025
Permit issued — Mechanical Systems
X01266016-S1-MS
08/15/2025
Permit issued — General Construction
X01266016-I1-GC
08/11/2025
Filed — Alteration
To install a commercial hood
X01266016-I1
08/11/2025
Filed — Alteration
To install a commercial hood
X01266016-S1
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/12/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
06/12/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/10/2025
Filed — Alteration CO
Interior renovation of 2 story building and change of use.
X00930650-P2
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/27/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
05/27/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
05/22/2025
Signed off — Alteration
IN-KIND REPLACEMENT OF GAS PIPING FROM THE EXISTING SHUT-OFF VALVE TO THE REPLACED HVAC UNIT FILED UNDER APPLICATION NO. X00280895. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00280976-I1
05/22/2025
Signed off — Alteration
X00280895-I1
04/16/2025
Permit issued — Plumbing
X00280976-I1-PL
04/08/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/19/2024
Filed — Alteration CO
Interior renovation of 2 story building and change of use.
X00930650-P1
11/18/2024
Signed off — Alteration CO
Interior renovation of 2 story building and change of use.
X00930650-S2
11/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/16/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
11/16/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
11/12/2024
Signed off — Alteration CO
Interior renovation of 2 story building and change of use.
X00930650-S3
11/12/2024
Permit issued — Mechanical Systems
X00930650-S3-MS
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN07/07/2026
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC04/07/2026
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC04/07/2026
DOB NOWMechanical SystemsPermit IssuedJOHN EVAN CONTRACTING COR08/18/2025
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR08/15/2025
DOB NOWPlumbingSigned-offBEST PBG HTG & COOL INC04/16/2025
DOB NOWMechanical SystemsSigned-offMARCAL CONTRACTING CO LLC11/12/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC06/06/2024
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC06/06/2024
DOB NOWGeneral ConstructionPermit IssuedMARCAL CONTRACTING CO LLC06/05/2024
DOB NOWGeneral ConstructionSigned-offMARCAL CONTRACTING CO LLC01/11/2024
DOB NOWPlumbingSigned-offLEMODE PLBG & HTG CORP03/02/2020
DOB NOWMechanical SystemsSigned-offAFGO MECHANICAL SVCS12/23/2019
BIS—ISSUEDMARCAL CONTRACTING CO LLC03/20/2019
BISMHISSUEDAIRWORKS MECHANICAL INC10/10/2013
BIS—ISSUEDJOHN CAPPELLI ERECTORS IN03/20/2012
BIS—ISSUEDSIGNS CAD CORP02/05/2004
BISSPISSUEDHEADS UP FIRE SPRINKLER01/10/2003
BISSPISSUEDFULEP FIRE PROT. CO., LL10/17/2002
BISOTISSUEDPELBAY ASSOCIATES09/20/2002
BISPLISSUEDJOHN CANNETTI09/20/2002
BIS—ISSUEDBERGER SIGN FABRICATION INC.09/04/2002
BIS—ISSUEDPELBAY ASSOCIATES06/19/2002
BISSPISSUEDHEADS UP FIRE SPRINKLER06/17/2002
BISSPISSUEDPINNACLE PLBG & HTG CORP06/10/2002
BISPLISSUEDPERFECT PLUMBING &HEATING CORP04/17/2002
BISPLISSUEDJOE TRUCE PLUMBING INC.04/04/2002
BIS—ISSUEDSIGNS CAD CORP03/29/2002
BIS—ISSUEDSIGNS CAD CORP03/29/2002
BIS—ISSUEDSIGNS CAD CORP03/29/2002
BIS—ISSUEDSIGNS CAD CORP03/29/2002
BISOTISSUEDMICHELLE KUO CORP03/29/2002
BIS—ISSUEDSIGNS CAD CORP03/29/2002
BIS—ISSUEDCOW BAY SPRINKLER CORP03/26/2002
BISOTISSUEDINTREPID DEVELOPMENT03/14/2002
BISMHISSUEDINTREPID DEVELOPMENT03/14/2002
BISEQISSUEDJA-TO BLDG CONTRACTORS IN02/05/2002
BISPLISSUEDBEDROCK PLBG. & HTG., INC01/30/2002
BIS—ISSUEDCOW BAY SPRINKLER CORP01/11/2002
BISEQISSUEDCOW BAY SPRINKLER CORP01/11/2002
+ 14 more permits on file
2 projects · most recent 10/16/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/16/2025Permit IssuedJOHN EVAN CONTRACTING CORVentilation Systems—
06/10/2025Signed-offMARCAL CONTRACTING CO LLCVentilation Systems
Ventilation
Greenheck G-102-VG 1,050 CFM · Exhaust Fan ×1
__Junk__ N/A 1 BTU · Ductwork ×1
1 project · most recent 06/10/2025
Water/Sanitary
FiledStatusContractorScope
06/10/2025Signed-offCREATIVE PLUMBING INWater/Sanitary
9 projects · most recent 01/23/2026
General Wiring
FiledStatusContractorScope
01/23/2026CompleteJONG HYUN KIM—
11/26/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
05/28/2025CompleteACCURATE ELEC'L CORP.General Wiring
05/12/2025CompleteACCURATE ELEC'L CORP.General Wiring
12/19/2024CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
06/29/2018CompleteROBERT S. COVELLO—
06/28/2018CompleteROBERT S. COVELLO—
06/28/2018CompleteROBERT S. COVELLO—
06/27/2018CompleteROBERT S. COVELLO—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
06/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Pass-Final Sign Permit InspectionPassView ↗
05/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
10/17/2025Mechanical SystemsTREVOR O. FLOWERSspecial
10/17/2025FinalTREVOR O. FLOWERSprogress
10/16/2025FinalTREVOR O. FLOWERSprogress
10/15/2025FinalTREVOR O. FLOWERSprogress
10/15/2025Mechanical SystemsTREVOR O. FLOWERSspecial
09/29/2025Fuel-Oil Storage and Fuel-Oil Piping Systems—special
09/29/2025Fire-Resistant Penetrations and Joints—special
09/15/2025Fuel-Oil Storage and Fuel-Oil Piping Systems—special
09/15/2025Fire-Resistant Penetrations and Joints—special
06/12/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
06/12/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
06/12/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
06/12/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/27/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/27/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/27/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
05/27/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
11/16/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/16/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/16/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
11/16/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
03/18/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/18/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
03/18/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/18/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
Latest 25 of 29.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch22
08/26/2026X00042603-I1Request digital key ↗
08/26/2026X00042609-I1Request digital key ↗
08/22/2026X00975632-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/23/2026X00280976-I1Request digital key ↗
08/15/2026X00280976-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00280895-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
01/29/2025220023301Open ↗
12/17/2024210178519Open ↗
11/15/2024220170437Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION4
07/25/2019210178519Open ↗
03/20/2019210178519Open ↗
10/10/2013220333583Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/12/2014220333583Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
02/15/2022220741892Open ↗
01/27/2022220741892Open ↗
12/05/2018210178519Open ↗
▸BISZONING RESOLUTION DETERMINATION1
12/05/2018210178519Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
01/27/2022220741892Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/27/2022220741892Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00930650-I1Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/26/2026X00042609-I1Open ↗
08/26/2026X00280895-I1Open ↗
08/23/2026X00280976-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/13/2026X01266016-S1Open ↗
09/01/2026X01266016-I1Open ↗
09/01/2026X01266016-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/13/2026X01266016-S1Open ↗
09/01/2026X01266016-P2Open ↗
08/31/2026X00930650-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/20/2019210178519Open ↗
02/19/2014220333583Open ↗
09/06/2013220333583Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/07/2013220333583Open ↗
08/15/2009220023301Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/07/2013220333583Open ↗
08/15/2009220023301Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/19/2014220333583Open ↗
▸BISEQUIPMENT USE PERMITS1
02/19/2014220333583Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026X00930650-P1Open ↗
08/13/2026X00930650-P2Open ↗
08/13/2026X00930650-I1Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT2
03/20/2019210178519Open ↗
03/20/2019210178519Open ↗
▸BISSTREET TREE CHECKLIST1
12/05/2018210178519Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/06/2013220333583Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/15/2009220023301Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/19/2014220333583Open ↗
09/07/2013220333583Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/31/2018210178519Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/19/2014220333583Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/05/2018210178519Open ↗
10/31/2018210178519Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/15/2022220741892Open ↗
02/15/2022220741892Open ↗
12/05/2018210178519Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
12/04/2018210178519Open ↗
10/31/2018210178519Open ↗
08/15/2009220023301Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/24/2012220170437Open ↗
08/15/2009220023301Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/19/2014220333583Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/05/2018210178519Open ↗
02/19/2014220333583Open ↗
09/07/2013220333583Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
01/27/2022220741892Open ↗
10/31/2018210178519Open ↗
09/06/2013220333583Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
12/05/2018210178519Open ↗
▸BISBOROUGH INTAKE FORM1
01/27/2022220741892Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM3
02/15/2022220741892Open ↗
10/31/2018210178519Open ↗
08/15/2009220023301Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026X00930650-I1Open ↗
08/13/2026X00930650-P1Open ↗
08/13/2026X00930650-P2Open ↗