← Back
BuildNYC
Three families
328 12TH STREET
BROOKLYN · Park Slope · BIN 3023210
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,508 sfGross Floor Area
3Units
Rent Stabilized8 Active Violations 3 old, status unconfirmed ▸FDNY Report ↗
Three families · Owner of record: 328 12th Street Development · 2,200 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHVAC workUnder Construction30p · 5 filings · 20 docs
PenthouseUnder Construction24p · 2 filings · 20 docs
Floor 4HVAC workUnder Construction23p · 5 filings · 20 docs
Floor 3HVAC workUnder Construction23p · 5 filings · 20 docs
Floor 2HVAC workUnder Construction31p · 5 filings · 20 docs
Floor 1HVAC workUnder Construction31p · 6 filings · 20 docs
CellarHVAC workUnder Construction62p · 7 filings · 20 docs
BasementUnder Construction21p · 1 filing · 20 docs
Site & exteriorConstruction fence for demolitionUnder Construction13p · 4 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
328 12th St Development2007/08/2026
328 12th St Holding1203/21/2026
328 12th Street203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2023$1.8M—328 12TH STREET LLC → 328 12th Street Development$708/sf building
03/22/2021$1.1M—— → —$439/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Studio Associates712/01/2025
Always Fast Services109/24/2025
AA Building & Inspection Service904/21/2025
Jian Engineering112/11/2021
Sharon Associates209/22/2021
Jung H. Choi, Architect105/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1803/21/2026
Design Studio Associates603/21/2026
LFNY Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Harry's DesignGeneral Contractor608/05/2026
Harry's DesignScaffold307/08/2026
LL Custom HomesScaffold203/21/2026
Phoenix Sutton STRScaffold204/09/2026
LL Custom HomesGeneral Contractor203/21/2026
SMVP ManagementScaffold107/08/2026
Plumbing NYCPlumbing107/08/2026
Plumbing NYCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection15191512/01/2025
Building Lifecycle
All (205)Filed (21)Permit Issued (16)Signed Off (2)Violation (54)Inspection (2)Objection (80)Special Inspection (30)
08/04/2026
Permit issued — General Construction
B00562773-I1-GC
05/08/2026
Permit issued — Sprinklers
B00562773-S2-EW-SP
04/30/2026
Violation issued (HPD, open)
A
04/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01290746-I1
04/13/2026
Violation issued (ECB, closed)
Unknown
04/13/2026
Violation issued (ECB, closed)
Construction
04/13/2026
Violation issued (ECB, closed)
Construction
04/13/2026
Violation issued (ECB, closed)
Construction
04/13/2026
Violation issued (ECB, closed)
Unknown
03/18/2026
Signed off — Alteration
Proposed SOE work for vertical and horizontal extension to existing 3-story residential building filed in conjunction with Alt-CO-NB # B00562773-I1.
B00624748-I1
03/16/2026
Permit issued — General Construction
B00562773-I1-GC
03/16/2026
Permit issued — Construction Fence
B01113439-I1-FN
01/21/2026
Permit issued — Construction Fence
B01113439-I1-FN
01/12/2026
Violation issued (ECB, closed)
Construction
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AS PER PLANS FILED HEREWITH
B00562773-S2
11/20/2025
Permit issued — Plumbing
B00562773-S1-PL
11/19/2025
Violation issued (HPD, open)
I
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AS PER PLANS FILED HEREWITH
B00562773-P3
10/29/2025
Violation issued (ECB, closed)
Construction
10/29/2025
Special inspection requirement — Metering
Younes Abouyaala
10/29/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
10/29/2025
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
10/29/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
10/29/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
10/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
10/29/2025
Special inspection requirement — Metering
Younes Abouyaala
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
10/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/29/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
10/29/2025
Special inspection requirement — Masonry
Younes Abouyaala
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/29/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
10/29/2025
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
10/29/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
10/29/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
10/29/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
10/29/2025
Special inspection requirement — Lighting controls
Younes Abouyaala
10/29/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
10/29/2025
Special inspection requirement — Lighting controls
Younes Abouyaala
10/29/2025
Special inspection requirement — Exterior lighting power
Younes Abouyaala
10/29/2025
Special inspection requirement — Masonry
Younes Abouyaala
10/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
10/29/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
10/29/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
10/07/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AS PER PLANS FILED HEREWITH
B00562773-S1
09/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01290746-I1
09/24/2025
Permit issued — Supported Scaffold
B01290746-I1-SF
09/24/2025
Permit issued — Supported Scaffold
B01290746-I1-SH
09/12/2025
Permit issued — General Construction
B00562773-I1-GC
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/05/2025
Objection raised — Structural
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHarry's Design08/04/2026
DOB NOWSprinklersPermit IssuedPlumbing NYC05/08/2026
DOB NOWGeneral ConstructionPermit IssuedHarry's Design03/16/2026
DOB NOWConstruction FencePermit IssuedHarry's Design03/16/2026
DOB NOWConstruction FencePermit IssuedHarry's Design01/21/2026
DOB NOWPlumbingPermit IssuedPlumbing Works NYC11/20/2025
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR09/24/2025
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR09/24/2025
DOB NOWGeneral ConstructionPermit IssuedHarry's Design09/12/2025
DOB NOWStructuralPermit IssuedHarry's Design07/30/2025
DOB NOWFoundationSigned-offHarry's Design12/09/2024
DOB NOWConstruction FencePermit IssuedHarry's Design10/11/2024
DOB NOWSupport of ExcavationSigned-offHarry's Design10/11/2024
DOB NOWGeneral ConstructionPermit IssuedLL Custom Homes07/18/2023
DOB NOWConstruction FencePermit IssuedLL Custom Homes06/13/2023
DOB NOWConstruction FencePermit IssuedSMVP Management05/20/2019
BIS—ISSUEDDomus Home Improvement Design07/12/2019
BIS—ISSUEDDomus Home Improvement Design07/01/2019
BIS—ISSUEDDomus Home Improvement Design07/01/2019
BISOTISSUEDBPS Construction & Home05/02/2012
1 project · most recent 09/22/2021
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/22/2021——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
— 4MXS36RMVJUA 36,000 BTU · Condensing Unit ×3
5MXS48TVJU 47,000 BTU · Condensing Unit ×1
Heating
— 4MXS36RMVJUA 36,000 BTU · Condensing Unit ×3
5MXS48TVJU 48,500 BTU · Condensing Unit ×1
Berko FRC4020 13,650 BTU · Electric Heater ×4
Ventilation
Greenheck SP-B110 100 CFM · Kitchen Exhaust ×2
SP-B70 50 CFM · Exhaust Fan ×2
2 projects · most recent 12/01/2025
Storm Water/Sanitary Gas
FiledStatusContractorScope
12/01/2025Permit IssuedPlumbing Works NYCStorm, Water/Sanitary
09/22/2021——Gas, Storm, Water/Sanitary
2 projects · most recent 09/24/2025
General Wiring
FiledStatusContractorScope
09/24/2025CompleteRichard Neu—
04/03/2025Permit IssuedNapstar ElectricGeneral Wiring
2 projects · most recent 04/21/2025
FiledStatusContractorScope
04/21/2025Signed-offHarry's Design6 scope_items
04/12/2023——1 scope_items
1 project · most recent 09/19/2024
Fence
FiledStatusContractorScope
09/19/2024Permit IssuedHarry's DesignFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 140
DateRequirementInspectorRole
11/18/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/29/2025Maintenance informationYounes Abouyaalaenergy_progress
10/29/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
10/29/2025Lighting controlsYounes Abouyaalaenergy_progress
10/29/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
10/29/2025Exterior lighting powerYounes Abouyaalaenergy_progress
10/29/2025Air barrier — testing Younes Abouyaalaenergy_progress
10/29/2025Fenestration air leakageYounes Abouyaalaenergy_progress
10/29/2025Lighting controlsYounes Abouyaalaenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/29/2025MasonryYounes Abouyaalaspecial
10/29/2025MeteringYounes Abouyaalaenergy_progress
10/29/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/29/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/29/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
10/29/2025Lighting in dwelling unitsYounes Abouyaalaenergy_progress
10/29/2025Interior lighting powerYounes Abouyaalaenergy_progress
10/29/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
10/29/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
10/29/2025Exterior lighting powerYounes Abouyaalaenergy_progress
10/29/2025Air barrier — testing Younes Abouyaalaenergy_progress
10/29/2025Fenestration areasYounes Abouyaalaenergy_progress
10/29/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
10/29/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
10/29/2025MasonryYounes Abouyaalaspecial
Latest 25 of 140.
▾Documents — 234 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch20
08/31/2026B00595887-I1Request digital key ↗
08/31/2026B00643459-I1Request digital key ↗
08/29/2026B00624741-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00166616-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION13
11/17/2025322122635Open ↗
09/28/2021340823121Open ↗
05/28/2021321674096Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
07/23/2019321674096Open ↗
07/23/2019321674096Open ↗
07/23/2019321674096Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/08/2023340823121Open ↗
09/28/2021340823121Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/27/2019321674096Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00562773-P3Open ↗
08/13/2026B00562773-P1Open ↗
08/13/2026B00562773-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00562773-P2Open ↗
08/13/2026B00562773-I1Open ↗
08/13/2026B00562773-P3Open ↗
Showing 3 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/28/2021340823121Open ↗
▸BISZONING DIAGRAM1
05/15/2019321674096Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00562773-I1Open ↗
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature42
10/03/2026B00624748-S1Open ↗
10/03/2026B00624748-S1Open ↗
09/28/2026B00562773-P1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/02/2026B00166616-I1Open ↗
08/31/2026B00595887-I1Open ↗
08/31/2026B00643459-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
10/03/2026B00624748-S1Open ↗
09/28/2026B00562773-P1Open ↗
09/02/2026B00624748-P5Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
07/05/2019321674096Open ↗
07/05/2019321674096Open ↗
07/02/2019321674096Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/28/2021340823121Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/28/2021340823121Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/07/2012320471869Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00562773-I1Open ↗
08/13/2026B00562773-P3Open ↗
08/13/2026B00562773-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/05/2019321674096Open ↗
09/19/2018321674096Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
09/28/2021340823121Open ↗
06/03/2019321674096Open ↗
▸BISST-1 Street Tree Checklist1
05/07/2012320471869Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/10/2021340823121Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/10/2021340823121Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/03/2019321674096Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/03/2019321674096Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00562773-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026B00562773-S1Open ↗
08/20/2026B00562773-I1Open ↗
08/20/2026B00562773-P3Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
05/07/2012320471869Open ↗
05/07/2012320471869Open ↗
05/07/2012320471869Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026B00595887-I1Open ↗
08/15/2026B00624748-S1Open ↗
08/15/2026B00624748-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/06/2019321674096Open ↗
02/07/2019321674096Open ↗
09/19/2018321674096Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/07/2012320471869Open ↗
▸Inspections & Test Reports3
▸BISSOIL REPORT1
07/05/2019321674096Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/03/2019321674096Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/03/2019321674096Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE3
02/07/2019321674096Open ↗
02/07/2019321674096Open ↗
10/24/2017321674096Open ↗
▸BISSUPERSEDING LETTER2
07/23/2019321674096Open ↗
07/23/2019321674096Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/04/2012320471869Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT4
03/06/2019321674096Open ↗
02/07/2019321674096Open ↗
10/24/2017321674096Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/23/2019321674096Open ↗
07/03/2019321674096Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/23/2019321674096Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00562773-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00562773-I1Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION4
05/02/2023340823121Open ↗
03/08/2023340823121Open ↗
11/10/2021340823121Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
11/17/2025322122635Open ↗
09/19/2018321674096Open ↗
09/19/2018321674096Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/28/2021340823121Open ↗
05/07/2012320471869Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/28/2021340823121Open ↗
▸Other Documents26
▸DOB NOWPlot Diagram7
08/13/2026B00624741-I1Open ↗
08/13/2026B00624748-S1Open ↗
08/13/2026B00624748-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWWaiver Document4
08/13/2026B00562773-I1Open ↗
08/13/2026B00562773-P3Open ↗
08/13/2026B00562773-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00562773-P1Open ↗
08/13/2026B00562773-P3Open ↗
08/13/2026B00562773-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00562773-I1Open ↗
08/13/2026B00562773-P3Open ↗
08/13/2026B00562773-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
03/08/2023340823121Open ↗
09/28/2021340823121Open ↗
▸BISPLOT DIAGRAM2
03/06/2019321674096Open ↗
10/24/2017321674096Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/23/2019321674096Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00562773-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00624748-I1Open ↗