← Back
BuildNYC
Two stories - detached, small or mid-size
328 CARY AVENUE
STATEN ISLAND · BIN 5004721
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R3AZoning
3,300 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,662 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProject Summary1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect103/28/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Long Island Power SolutionsGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854103/28/2025
Building Lifecycle
02/26/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
S01202688-I1-SL
04/04/2025
Permit issued — Solar
S01202688-I1-SL
03/28/2025
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
S01202688-I1
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
03/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedLong Island Power Solutions04/04/2025
BISOTISSUEDPro Custom Solar10/13/2020
1 project · most recent 03/13/2025
FiledStatusContractorScope
03/13/2025Permit IssuedCatizone Electrical—
1 project · most recent 03/28/2025
FiledStatusContractorScope
03/28/2025Permit IssuedLong Island Power Solutions—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/28/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
03/28/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
03/28/2025Energy Code Compliance InspectionsTOM PETERSENprogress
03/28/2025FinalTOM PETERSENprogress
03/28/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account