1960Year Built
1Stories
E1Building Class
M1-1Zoning
44,000 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only 3 old, status unconfirmed ▸FDNY Report ↗
General warehouse · Owner of record: Ditmas Associates · 44,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofALT1 Cofo Filing and Proposed Installation of a Pre-fabricat3p · 1 filing · 20 docs
Floor 1ALT1 Cofo Filing and Proposed Installation of a Pre-fabricat34p · 1 filing · 20 docs
MezzanineALT1 Cofo Filing and Proposed Installation of a Pre-fabricat20p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ditmas203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashok Architecture Design, PL/1012/13/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Automotive Facility ServicesGeneral Contractor603/21/2026
Elmac ElectricElectrical103/22/2026
NYC Plumbing & HeatingFire Protection107/08/2026
NYC Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ashok Architecture Design60271012/13/2024
Building Lifecycle
All (134)Filed (10)Permit Issued (5)Signed Off (2)Violation (30)Inspection (7)Objection (50)Special Inspection (30)
12/23/2024
Special inspection requirement — Fenestration areas
Ashish Patel
12/23/2024
Special inspection requirement — Fenestration air leakage
Ashish Patel
12/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Ashish Patel
12/23/2024
Special inspection requirement — Maintenance information
Ashish Patel
12/23/2024
Special inspection requirement — Shutoff dampers
Ashish Patel
12/23/2024
Special inspection requirement — Mechanical Systems
Ashish Patel
12/23/2024
Special inspection requirement — Exterior lighting power
Ashish Patel
12/23/2024
Special inspection requirement — Lighting controls
Ashish Patel
12/23/2024
Special inspection requirement — Protection of exposed foundation insulation
Ashish Patel
12/23/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ashish Patel
12/23/2024
Special inspection requirement — Air barrier - visual inspection
Ashish Patel
12/23/2024
Special inspection requirement — Ventilation and air distribution system
Ashish Patel
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
12/23/2024
Special inspection requirement — Insulation placement and R values
Ashish Patel
12/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
12/23/2024
Special inspection requirement — Final
Ashish Patel
12/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
12/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashish Patel
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
12/23/2024
Special inspection requirement — Interior lighting power
Ashish Patel
12/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P7
11/14/2024
Special inspection requirement — Final
Ashish Patel
11/14/2024
Special inspection requirement — Exterior lighting power
Ashish Patel
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
11/14/2024
Special inspection requirement — Fenestration air leakage
Ashish Patel
11/14/2024
Special inspection requirement — Fenestration areas
Ashish Patel
11/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashish Patel
11/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
11/14/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ashish Patel
11/14/2024
Special inspection requirement — Air barrier - visual inspection
Ashish Patel
10/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P6
09/06/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P5
06/22/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-S1
06/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P4
05/26/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-S2
05/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2024
Permit issued — General Construction
B00960242-I1-GC-CX
05/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/03/2024
Permit issued — Mechanical Systems
B00960242-I1-GC-CX
04/23/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P3
04/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P2
04/04/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P1
03/14/2024
Permit issued — Mechanical Systems
B00960242-I1-GC-CX
01/08/2024
Permit issued — Sprinklers
B00960242-S2-EW-SP
01/08/2024
Permit issued — Plumbing
B00960242-S1-PL
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAutomotive Facility Services05/20/2024
DOB NOWMechanical SystemsPermit IssuedAutomotive Facility Services05/03/2024
DOB NOWMechanical SystemsPermit IssuedAutomotive Facility Services03/14/2024
DOB NOWSprinklersSigned-offNYC Plumbing & Heating01/08/2024
DOB NOWPlumbingSigned-offNYC Plumbing & Heating01/08/2024
1 project · most recent 12/13/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/13/2024Permit IssuedAutomotive Facility ServicesVentilation Systems
Ventilation
Accudraft Accudraft 1,500 BTU ×4
1 project · most recent 12/13/2024
Sprinkler System
FiledStatusContractorScope
12/13/2024Signed-offNYC Plumbing & HeatingSprinkler System
1 project · most recent 12/13/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/13/2024Signed-offNYC Plumbing & HeatingGas, Water/Sanitary
3 projects · most recent 06/07/2025
General Wiring
FiledStatusContractorScope
06/07/2025CompleteRM Electric Co2 meters, 1 new_meters
03/12/2024CompleteElmac ElectricGeneral Wiring
10/31/2023CancelledMan ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
12/23/2024Fenestration and door U-factor and product ratingsAshish Patelenergy_progress
12/23/2024Shutoff dampersAshish Patelenergy_progress
12/23/2024HVAC-R and service water heating equipmentAshish Patelenergy_progress
12/23/2024Air barrier - visual inspectionAshish Patelenergy_progress
12/23/2024Fenestration areasAshish Patelenergy_progress
12/23/2024Maintenance informationAshish Patelenergy_progress
12/23/2024Duct leakage testing, insulation and designAshish Patelenergy_progress
12/23/2024Fenestration air leakageAshish Patelenergy_progress
12/23/2024Interior lighting powerAshish Patelenergy_progress
12/23/2024Protection of exposed foundation insulationAshish Patelenergy_progress
12/23/2024Lighting controlsAshish Patelenergy_progress
12/23/2024Structural Stability – Alterations of existing buildingsAshish Patelspecial
12/23/2024Mechanical SystemsAshish Patelspecial
12/23/2024FinalAshish Patelprogress
12/23/2024Fire-Resistance Rated ConstructionAshish Patelprogress
12/23/2024Energy Code Compliance InspectionsAshish Patelprogress
12/23/2024HVAC-R and service water heating system controlsAshish Patelenergy_progress
12/23/2024Ventilation and air distribution systemAshish Patelenergy_progress
12/23/2024Insulation placement and R valuesAshish Patelenergy_progress
12/23/2024Exterior lighting powerAshish Patelenergy_progress
12/23/2024HVAC-R and service water piping design and insulationAshish Patelenergy_progress
11/14/2024Interior lighting powerAshish Patelenergy_progress
11/14/2024HVAC-R and service water heating equipmentAshish Patelenergy_progress
11/14/2024Insulation placement and R valuesAshish Patelenergy_progress
11/14/2024Air barrier - visual inspectionAshish Patelenergy_progress
Latest 25 of 106.
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00960242-P7Request digital key ↗
08/26/2026B00960242-P6Request digital key ↗
08/26/2026B00960242-P5Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications114
▸DOB NOWProgress Inspector Seal & Signature90
09/27/2026B00960242-P6Open ↗
09/27/2026B00960242-P6Open ↗
09/27/2026B00960242-P6Open ↗
Showing 3 of 90 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/05/2026B00960242-S2Open ↗
09/27/2026B00960242-P6Open ↗
09/27/2026B00960242-P6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00960242-P6Open ↗
08/26/2026B00960242-P7Open ↗
08/26/2026B00960242-P5Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B00960242-P7Open ↗
08/26/2026B00960242-P6Open ↗
08/26/2026B00960242-P5Open ↗
Showing 3 of 10 on file for this type
▸Other Documents9
▸DOB NOWProperty Ownership Certification4
08/26/2026B00960242-P7Open ↗
08/26/2026B00960242-P6Open ↗
08/26/2026B00960242-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00960242-P6Open ↗
08/13/2026B00960242-P7Open ↗
08/13/2026B00960242-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00960242-I1Open ↗