← Back
Factory, industrial, semi-fireproof
328 JOHNSON AVENUE
BROOKLYN · BIN 3071314
💬 Discuss this project
1972Year Built
1Stories
F4Building Class
M1-2Zoning
14,227 sfGross Floor Area
0Units
4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: BOERUM JOHNSON AVE ASSOC · 22,524 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 13p · 1 filing · 14 docs
Cellar1p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLOSSAL MEDIA1104/09/2026
BOERUM JOHNSON AVENUE ASSOCIATES1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SKYE BEACH RA412/03/2025
R SCOTT LEWIS PE PC104/25/2025
ANGELO NG & ANTHONY NG ARCHITECTS S409/21/2022
TAN ARCHITECT P.C301/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING603/21/2026
SKYE BEACH RA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERBORO SIGN ELECL MAIScaffold407/08/2026
M&L SIGNS INCGeneral Contractor104/09/2026
BEST PLUMBING & HVAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M.G. MCLAREN ENGINEERING2999104/25/2025
BIG APPLE GROUP NY A RMA9168107/29/2020
Building Lifecycle
All (107)Filed (12)Permit Issued (6)Signed Off (6)Violation (2)Objection (51)Special Inspection (30)
02/10/2026
Signed off — Alteration
B01189587-I1
02/10/2026
Signed off — Alteration
B01189616-I1
02/10/2026
Signed off — Alteration
Filing to create hand-painted changeable copy advertising wall sign on sign structure
B01189565-I1
02/10/2026
Signed off — Alteration
B01189626-I1
12/12/2025
Permit issued — Sign
B01189626-I1-SG
12/12/2025
Permit issued — Sign
B01189565-I1-SG
12/11/2025
Permit issued — Sign
B01189616-I1-SG
12/11/2025
Permit issued — Sign
B01189587-I1-SG
12/03/2025
Filed — Alteration
B01189587-I1
12/03/2025
Filed — Alteration
B01189616-I1
12/03/2025
Filed — Alteration
Filing to create hand-painted changeable copy advertising wall sign on sign structure
B01189565-I1
12/03/2025
Filed — Alteration
B01189626-I1
11/21/2025
Signed off — Alteration
Filing to erect steel sign structure on exterior of existing brick building
B01185569-I1
06/26/2025
Permit issued — Structural
B01185569-I1-ST
04/25/2025
Filed — Alteration
Filing to erect steel sign structure on exterior of existing brick building
B01185569-I1
03/04/2025
Special inspection requirement — Final
SKYE BEACH
03/04/2025
Special inspection requirement — Structural Steel - Welding
Jeremy Billig
03/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Jeremy Billig
03/04/2025
Special inspection requirement — Structural Steel - Details
Jeremy Billig
02/24/2025
Special inspection requirement — Final
RENEE RAJAPPA
12/18/2023
Signed off — Alteration
Remove and cap existing gas boiler and hot water heater equipment's; and install new gas heat space heaters (gas furnaces) and replace existing gas meter per plan. No change in use, egress, and occupancy.
B00360641-I1
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/21/2022
Objection raised — Other
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection resolved — Addressed
09/21/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING CURB CUT # 1 IN CONJUNCTION WITH ALT 1 APPLICATION B00793989
B00793989-S9
09/21/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING CURB CUT # 1 IN CONJUNCTION WITH ALT 1 APPLICATION B00793989
B00793989-S8
09/12/2022
Violation issued (ECB, closed)
Construction
09/12/2022
Violation issued (ECB, closed)
Construction
09/07/2022
Objection raised — Scope
09/07/2022
Objection raised — Scope
09/07/2022
Objection raised — Scope
09/07/2022
Objection raised — Scope
09/07/2022
Objection raised — Scope
09/07/2022
Objection raised — Scope
09/07/2022
Objection raised — Scope
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI12/12/2025
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI12/12/2025
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI12/11/2025
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI12/11/2025
DOB NOWStructuralSigned-offM&L SIGNS INC06/26/2025
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC09/25/2020
BISFPISSUEDWILLIAM HIRD & CO INC04/23/2012
BISOTISSUEDA A DIVERSIFIED H V A C & R INC01/15/2004
BISFPISSUEDNEW YORK BUSINESS12/28/2000
BISPLISSUEDWASOFF PLBG & UTILITY CO01/29/1993
BISBLISSUEDWASOFF PLBG & UTILITY CO01/29/1993
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
03/04/2025FinalSKYE BEACHprogress
03/04/2025Structural Steel - WeldingJeremy Billigspecial
03/04/2025Structural Steel - High Strength BoltingJeremy Billigspecial
03/04/2025Structural Steel - DetailsJeremy Billigspecial
02/24/2025FinalRENEE RAJAPPAprogress
08/16/2022Fire-Resistance Rated Construction—progress
08/16/2022Protection of exposed foundation insulation—energy_progress
08/16/2022Maintenance information—energy_progress
08/16/2022Vestibules—energy_progress
08/16/2022Masonry—special
08/16/2022Structural Stability – Alterations of existing buildings—special
08/16/2022Concrete - Cast-In-Place—special
08/16/2022Excavations - Sheeting, Shoring, and Bracing—special
08/16/2022Fire-Resistant Penetrations and Joints—special
08/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/16/2022Subgrade Inspections—special
08/16/2022Subsurface Investigations (Borings/Test Pits)—special
08/16/2022Energy Code Compliance Inspections—progress
08/16/2022Electrical motors and elevators—energy_progress
08/16/2022Air barrier — testing —energy_progress
08/16/2022Fenestration and door U-factor and product ratings—energy_progress
08/16/2022Air barrier - visual inspection—energy_progress
08/16/2022Exterior lighting power—energy_progress
08/16/2022Interior lighting power—energy_progress
08/16/2022Fenestration areas—energy_progress
Latest 25 of 42.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
08/28/2026B00793989-S7Request digital key ↗
08/28/2026B00793989-I1Request digital key ↗
08/28/2026B00793989-S8Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00360641-I1Request digital key ↗
08/15/2026B00360641-P3Request digital key ↗
08/14/2026B00360641-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
05/01/2012320460657Open ↗
04/11/2012320460657Open ↗
01/07/2009310236688Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/26/2022340864354Open ↗
▸BISWORK PERMIT APPLICATION1
04/25/2012320460657Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026B00793989-S7Open ↗
08/28/2026B00793989-I1Open ↗
08/28/2026B00793989-S8Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B01185569-I1Open ↗
08/24/2026B00360641-I1Open ↗
08/24/2026B00360641-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/11/2012320460657Open ↗
09/23/2009310236688Open ↗
01/07/2009310236688Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B01185569-I1Open ↗
08/29/2026B01185569-I1Open ↗
08/29/2026B01185569-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/26/2022340864354Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/26/2022340864354Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
04/11/2012320460657Open ↗
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
09/26/2022340864354Open ↗
▸BISSTREET TREE CHECKLIST1
09/26/2022340864354Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00793989-I1Open ↗
08/28/2026B00793989-S9Open ↗
08/28/2026B00793989-S8Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/11/2012320460657Open ↗
01/07/2009310236688Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00360641-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B00793989-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
04/11/2012320460657Open ↗
01/07/2009310236688Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/23/2009310236688Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
04/11/2012320460657Open ↗
09/23/2009310236688Open ↗
01/07/2009310236688Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
04/11/2012320460657Open ↗
01/07/2009310236688Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/26/2022340864354Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/26/2022340864354Open ↗
▸Other Documents3
▸BISBPP - SUPPORTING DOCUMENTATION1
09/26/2022340864354Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00793989-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00793989-I1Open ↗