← Back
Walk-up apt, over six families with stores
328 WEST 46 STREET
MANHATTAN · BIN 1076202
💬 Discuss this project
1920Year Built
3Stories
C7Building Class
R8Zoning
7,316 sfGross Floor Area
14Units
Rent Stabilized48 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 328-330 WEST 46TH STREET, INC. · 4,017 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 32p · 1 filing · 7 docs
Floor 22p · 1 filing · 7 docs
Floor 12p · 1 filing · 7 docs
Cellar1p · 1 filing · 4 docs
Basement1p · 1 filing · 7 docs
Sub-Basement4p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LMS REALTY1407/08/2026
328-330 WEST 46TH STREET, INC.103/22/2026
S B S PROPERTIES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/27/2017$12.5M—— → —$1,709/sf building
02/10/2014$188K—SQUAREBOX LLC → OLD GREENWAY, LLC$26/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DANIEL O'CONNOR ARCHITECTS503/31/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOP DOG PLBG & HTG CORPPlumbing407/08/2026
DONE RIGHT HOOD & FIRE SAGeneral Contractor303/21/2026
DUMAS CONSTRUCTION INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DANIEL O'CONNOR ARCHITECT1730410/28/2021
Building Lifecycle
All (86)Filed (5)Permit Issued (3)Violation (40)Inspection (6)Objection (27)Special Inspection (5)
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
04/28/2026
Objection raised — Zoning
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Other
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Accessibility
04/28/2026
Objection raised — Energy
04/28/2026
Objection raised — Inspections
04/28/2026
Objection raised — Zoning
04/28/2026
Objection raised — Other
04/28/2026
Objection raised — Cost
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Zoning
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Structural
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Structural
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Accessibility
03/31/2026
Filed — Alteration CO
INTERIOR ALTERATION AT THE CELLAR AND BASEMENT FOR AN EATING AND DRINKING ESTABLISHMENT, INCLUDING NEW FOOD PREPARATIONAREA. NEW EGRESS AND AUXLIARY STAIRS AND INCREASE IN OCCUPANT LOAD
M01371061-I1
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/04/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2024
Violation issued (HPD, closed)
A
03/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
02/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
02/10/2022
Violation issued (HPD, open)
B
01/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/23/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2021
Permit issued — Plumbing
M00576629-I1-PL
10/28/2021
Filed — Alteration CO
M00612267-I1
10/28/2021
Filed — Alteration
BASTM-replace 1 toilet.rep/relocat1 lav,cap/remove2urinals,2 toilets,and2lavs. removed all existing comm.cooking equip. and install 13 new gas comm.cooking equip.inst.1gas/s/v. CEL-rep. and relo.1 hwh,., inst. 2comp.sinks,1dw,1hs.3lav,6toilet,1grease/trap
M00576629-I1
09/24/2021
Permit issued — Mechanical Systems
M00576725-I1-MS
09/13/2021
Filed — Alteration
Remove and install a new kitchen range hood. remove and install a new exhaust and fresh make up air ductwork. remove and install a new make up air and exhaust motors. remove and install 5 new fujitsu split a/c units as per plans submitted.
M00576725-I1
09/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel O'Connor
08/13/2021
Special inspection requirement — Mechanical Systems
Daniel O'Connor
08/13/2021
Special inspection requirement — Final
Daniel O'Connor
08/07/2021
Permit issued — General Construction
M00563575-I1-GC
07/27/2021
Filed — Alteration
Removal of existing non bearing partition walls, doors, mill work, ceiling and flooring. And installation of new non bearing partition .walls, doors, mill work, ceiling, and flooring tiles in kitchen area and dining rooms. No change in use, egress or occu
M00563575-I1
07/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel O'Connor
07/23/2021
Special inspection requirement — Final
Daniel O'Connor
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
12/15/2010
Violation issued (HPD, open)
B
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTOP DOG PLBG & HTG CORP11/16/2021
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT HOOD & FIRE SA09/24/2021
DOB NOWGeneral ConstructionPermit IssuedDUMAS CONSTRUCTION INC08/07/2021
BISFPISSUEDFIRE COMMAND CO, INC10/10/2013
BISOTISSUEDVON OSTEN CORP10/14/2004
BISEQISSUEDSPRING SCAFFOLDING09/23/2004
BISFPISSUEDIDEAL FIRE SYSTEM INC.07/29/2004
BISFBISSUEDATECH HEATING AND COOLING LLC03/26/2004
BISFPISSUEDALLIED FIRE CONTROL03/08/2000
BISOTISSUEDCITIZEN WATERPROOFING05/07/1998
BISOTISSUEDAPPLE CONSTRUCTION LTD08/19/1994
BISMHISSUEDAPPLE CONSTRUCTION LTD06/17/1994
1 project · most recent 09/13/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/13/2021Permit IssuedDONE RIGHT HOOD & FIRE SAAir Conditioning Systems
Cooling
Fujitsu F2L36C18180000-F2L36W18180000 36,000 BTU · Split System ×5
1 project · most recent 10/28/2021
Gas Water/Sanitary
FiledStatusContractorScope
10/28/2021Permit IssuedTOP DOG PLBG & HTG CORPGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/09/2021Fire-Resistant Penetrations and JointsDaniel O'Connorspecial
08/13/2021Mechanical SystemsDaniel O'Connorspecial
08/13/2021FinalDaniel O'Connorprogress
07/23/2021Fire-Resistant Penetrations and JointsDaniel O'Connorspecial
07/23/2021FinalDaniel O'Connorprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00563575-I1Request digital key ↗
09/03/2026M00576725-I1Request digital key ↗
09/03/2026M00576629-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION1
10/16/2013121743462Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/20/2013121743462Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/14/2026M01371061-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00563575-I1Open ↗
08/18/2026M01371061-I1Open ↗
08/13/2026M00576629-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00563575-I1Open ↗
08/22/2026M00576725-I1Open ↗
08/22/2026M00576725-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00563575-I1Open ↗
08/22/2026M00576725-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/02/2013121743462Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
12/02/2013121743462Open ↗
▸Safety & Tenant Protection7
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist5
08/14/2026M01371061-I1Open ↗
08/13/2026M00576629-I1Open ↗
08/13/2026M00576725-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist1
08/14/2026M01371061-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00612267-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00563575-I1Open ↗
08/14/2026M01371061-I1Open ↗
08/13/2026M00576725-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/02/2013121743462Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/02/2013121743462Open ↗
09/20/2013121743462Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/20/2013121743462Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026M01371061-I1Open ↗