Locations of Work
StructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2 filings · 20 docs
Floor 7Under Construction2 filings · 20 docs
Floor 6Under Construction2 filings · 20 docs
Floor 5Under Construction2 filings · 20 docs
Floor 4Under Construction2 filings · 20 docs
Floor 3Under Construction2 filings · 20 docs
Floor 2Under Construction2 filings · 20 docs
Floor 1Under Construction2 filings · 20 docs
CellarUnder Construction1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CYPRESS HILLS CHILD CARE CORPORATIO509/22/2026
MHANY MANAGEMENT409/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BROOKER ENGINEERING, PLLC808/26/2026
FL&M ENGINEERING DESIGN &INSPECTION306/09/2026
CTC,LLC101/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GALAXY G.C. GROUP, LLCGeneral Contractor409/22/2026
AJC SPRINKLER CORPFire Protection109/15/2026
MC SUPERSTRUCTURE INCGeneral Contractor108/07/2026
AJC PLUMBING & HTG CORPPlumbing108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803808/26/2026
Building Lifecycle
All (89)Filed (12)Permit Issued (13)Inspection (4)Objection (30)Special Inspection (30)
09/21/2026
Permit issued — Foundation
B08004405-S7-FO
08/31/2026
Permit issued — Support of Excavation
B08004405-S5-SE
08/26/2026
Filed — Alteration
Support of Excavation work as per plans filed herewith.
B08004405-P2
08/26/2026
Permit issued — Construction Fence
B01345874-I1-FN
08/26/2026
Permit issued — Structural
B08004405-S4-ST
08/06/2026
Permit issued — Sidewalk Shed
B01307850-I1-SH
08/04/2026
Special inspection requirement — Footing and Foundation
08/04/2026
Special inspection requirement — Subgrade Inspections
06/17/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
06/17/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
06/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SAMI HAJJAR P.E
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
06/12/2026
Permit issued — Supported Scaffold
B01380350-I1-SF
06/09/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01380350-I1
05/22/2026
Permit issued — Sprinklers
B08004405-S6-EW-SP
05/08/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01307850-I1
05/08/2026
Permit issued — Plumbing
B08004405-S3-PL
05/08/2026
Permit issued — Sidewalk Shed
B01307850-I1-SH
04/29/2026
Permit issued — Structural
B08004405-S4-ST
04/27/2026
Permit issued — Support of Excavation
B08004405-S5-SE
03/18/2026
Permit issued — Construction Fence
B01345874-I1-FN
01/27/2026
Permit issued — Protection and Mechanical Methods
B01297032-I1-PMM
01/26/2026
Filed — Alteration
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01297032-I1
01/21/2026
Filed — Alteration
B01345874-I1
12/11/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
10/15/2024
Objection resolved — Addressed
10/15/2024
Objection resolved — Addressed
10/11/2024
Objection raised — Other
10/11/2024
Objection raised — Other
10/11/2024
Objection raised — Other
10/08/2024
Objection raised — Other
10/07/2024
Filed — Alteration
Support of Excavation work as per plans filed herewith.
B08004405-S7
10/07/2024
Filed — Alteration
Support of Excavation work as per plans filed herewith.
B08004405-S4
10/07/2024
Filed — Alteration
Support of Excavation work as per plans filed herewith.
B08004405-S5
10/03/2024
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Underpinning
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
06/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2024
Objection resolved — Addressed
06/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/13/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/26/2023
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
06/26/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SAMI HAJJAR P.E
06/26/2023
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
06/26/2023
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
06/23/2023
Filed — Alteration
Support of Excavation work as per plans filed herewith.
B08004405-S6
06/22/2023
Objection raised — Other
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/16/2023
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
06/15/2023
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
06/13/2023
Filed — Alteration
Support of Excavation work as per plans filed herewith.
B08004405-S1
06/13/2023
Filed — Alteration
Support of Excavation work as per plans filed herewith.
B08004405-S3
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedGALAXY G.C. GROUP, LLC09/21/2026
DOB NOWSupport of ExcavationPermit IssuedGALAXY G.C. GROUP, LLC08/31/2026
DOB NOWConstruction FencePermit IssuedGALAXY G.C. GROUP, LLC08/26/2026
DOB NOWStructuralPermit IssuedGALAXY G.C. GROUP, LLC08/26/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC08/06/2026
DOB NOWSupported ScaffoldPermit IssuedMC SUPERSTRUCTURE INC06/12/2026
DOB NOWSprinklersPermit IssuedAJC SPRINKLER CORP05/22/2026
DOB NOWPlumbingPermit IssuedAJC PLUMBING & HTG CORP05/08/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC05/08/2026
DOB NOWStructuralPermit IssuedGALAXY G.C. GROUP, LLC04/29/2026
DOB NOWSupport of ExcavationPermit IssuedGALAXY G.C. GROUP, LLC04/27/2026
DOB NOWConstruction FencePermit IssuedGALAXY G.C. GROUP, LLC03/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMC SUPERSTRUCTURE INC01/27/2026
1 project · most recent 08/26/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/26/2026Permit IssuedAJC PLUMBING & HTG CORPGas, Storm, Water/Sanitary
4 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026Permit IssuedCOUNTY ELECL CONTRACTOR IGeneral Wiring
05/05/2026Permit IssuedSOLAS ELECTRICAL CORP—
05/05/2026Permit IssuedCOUNTY ELECL CONTRACTOR I1 meters, 1 new_meters
01/23/2026Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Permit IssuedGALAXY G.C. GROUP, LLC5 scope_items
2 projects · most recent 06/09/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/09/2026Permit IssuedMC SUPERSTRUCTURE INCScaffold
05/08/2026Permit IssuedMC SUPERSTRUCTURE INCSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/04/2026Footing and Foundation—progress
08/04/2026Subgrade Inspections—special
06/17/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
06/17/2026Post-installed AnchorsSAMI HAJJAR P.Especial
06/17/2026Excavations - Sheeting, Shoring, and BracingSAMI HAJJAR P.Especial
06/17/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
10/03/2024Structural Steel - WeldingSAMI HAJJAR P.Especial
10/03/2024Subgrade InspectionsSAMI HAJJAR P.Especial
10/03/2024UnderpinningSAMI HAJJAR P.Especial
10/03/2024FinalSAMI HAJJAR P.Eprogress
10/03/2024Footing and FoundationSAMI HAJJAR P.Eprogress
10/03/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
10/03/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
10/03/2024Excavations - Sheeting, Shoring, and BracingSAMI HAJJAR P.Especial
10/03/2024Post-installed AnchorsSAMI HAJJAR P.Especial
06/26/2023Post-installed AnchorsSAMI HAJJAR P.Especial
06/26/2023Excavations - Sheeting, Shoring, and BracingSAMI HAJJAR P.Especial
06/26/2023Structural Steel - WeldingSAMI HAJJAR P.Especial
06/26/2023Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
06/16/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
06/16/2023Post-installed AnchorsSAMI HAJJAR P.Especial
06/15/2023Sprinkler SystemsSAMI HAJJAR P.Especial
06/09/2023Maintenance informationSAMI HAJJAR P.Eenergy_progress
06/09/2023Post-installed AnchorsSAMI HAJJAR P.Especial
06/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
Latest 25 of 47.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026B08004405-S6Request digital key ↗
08/27/2026B08004405-P3Request digital key ↗
08/27/2026B08004405-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026B08004405-S4Open ↗
08/27/2026B08004405-P3Open ↗
08/27/2026B08004405-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/28/2026B08004405-S6Open ↗
09/23/2026B08004405-P2Open ↗
09/23/2026B08004405-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B08004405-P3Open ↗
09/18/2026B08004405-S3Open ↗
09/18/2026B08004405-S3Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos5
▸DOB NOWOER: Notice to Proceed5
08/27/2026B08004405-S4Open ↗
08/27/2026B08004405-P3Open ↗
08/27/2026B08004405-P2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/27/2026B08004405-P3Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/27/2026B08004405-P3Open ↗
08/27/2026B08004405-P2Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/14/2026B08004405-S5Open ↗