← Back
Two stories - detached, small or mid-size
3286 WATT AVENUE
BRONX · BIN 2076272
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3-1Zoning
1,002 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,632 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
PlumbingCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 2 filings · 20 docs
Floor 1Under Construction1p · 2 filings · 20 docs
CellarUnder Construction1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHIN-YANG CONSTRUCTION IN303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HCD ARCHITECT PC302/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HCDARCHITECT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHIN-YANG CONSTRUCTION INGeneral Contractor207/08/2026
L&M PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778105/04/2025
Building Lifecycle
All (12)Filed (3)Permit Issued (3)Violation (3)Inspection (3)
04/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
03/20/2026
Permit issued — Plumbing
X01308742-I1-PL
02/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2026
Filed — Alteration
X01308742-I1
01/14/2026
Violation issued (ECB, closed)
Construction
01/14/2026
Violation issued (ECB, open)
Unknown
01/14/2026
Violation issued (ECB, open)
Unknown
11/20/2025
Permit issued — Earth Work
X01189343-I1-GC-CX
10/30/2025
Permit issued — Construction Fence
X01290280-I1-FN
09/30/2025
Filed — Alteration
X01290280-I1
05/04/2025
Filed — Alteration
HORIZONTAL EXTENSION, INTERIOR RENOVATION. INSTALL NEW PLUMBING FIXTURES AND OBTAIN NEW C.O.
X01189343-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedL&M PLUMBING LLC03/20/2026
DOB NOWEarth WorkPermit IssuedSHIN-YANG CONSTRUCTION IN11/20/2025
DOB NOWConstruction FencePermit IssuedSHIN-YANG CONSTRUCTION IN10/30/2025
1 project · most recent 05/04/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/04/2025Permit IssuedSHIN-YANG CONSTRUCTION INHeating and Air Conditioning Systems
Heat / Cool
Gree RZQ36PVJU9 3 tons · Vrf Outdoor ×2
1 project · most recent 02/24/2026
General Wiring
FiledStatusContractorScope
02/24/2026Permit IssuedALL AROUND ELECTRIC CORP.General Wiring
1 project · most recent 05/04/2025
Wood
FiledStatusContractorScope
05/04/2025Permit IssuedSHIN-YANG CONSTRUCTION INWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/25/2026Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
02/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/06/2025Air barrier - visual inspectionChuandong Haoenergy_progress
06/06/2025Fenestration and door U-factor and product ratingsChuandong Haoenergy_progress
06/06/2025Permanent certificateChuandong Haoenergy_progress
06/06/2025Insulation placement and R valuesChuandong Haoenergy_progress
04/08/2025Designated Seismic SystemXIONGCAI GUspecial
04/08/2025Wood – Prefabricated I-JoistsXIONGCAI GUspecial
04/08/2025Wood – Seismic ResistanceXIONGCAI GUspecial
03/03/2025Footing and FoundationXIONGCAI GUprogress
03/03/2025FinalChuandong Haoprogress
03/03/2025Mechanical SystemsXIONGCAI GUspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026X01189343-I1Request digital key ↗
08/18/2026X01290280-I1Request digital key ↗
08/17/2026X01308742-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01189343-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/20/2026X01189343-I1Open ↗
09/20/2026X01189343-I1Open ↗
09/20/2026X01189343-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/20/2026X01189343-I1Open ↗
09/20/2026X01189343-I1Open ↗
09/20/2026X01189343-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026X01290280-I1Open ↗
08/17/2026X01308742-I1Open ↗
08/13/2026X01189343-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01308742-I1Open ↗
08/13/2026X01189343-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026X01189343-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDCLA Approval of Artwork1
08/13/2026X01290280-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026X01189343-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01189343-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01189343-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X01189343-I1Open ↗