DOB07/08/2020FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED VERTICAL CRACKS ABOVE THE 4TH FLOOR WINDOWS, CRACKED BRICKS ON THE CORNERS OF EXPOSURE #1. VERTICAL CRACK, AND MORTAR JOINT CRACKS ON EXPOSURE #4. DAMAGED FACADE NON COMPLIANT TO CODE.
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
HPD12/15/2008§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD12/15/2008§ 27-2032, 2034 ADM CODE DISCONTINUE USE OF ILLEGAL SPACE AND/OR HOT WATER HEATER AND PROVIDE FILED FOR & APPROVED HEATER WHICH OBTAINS COMBUSTION AIR DIRECTLY FROM OUTSIDE THE BUILDING OR APPROVED CENTRAL SYSTEM GAS FIRED HEATER IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
DOB11/05/2008V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB09/01/1994V-DOB VIOLATION - ACTIVE
ECB08/11/2011WORK W/O A PERMIT. LOCATION 2ND FLR. INSTALLED 2 KITCHEN SINKS, 2 GAS STOVES, AND 2 BATHTUBS W/O A PERMIT. LAST PERMIT FILED, 2 GAS STOVES &2 BATHTUBS W/O A PERMIT. LAST PERMIT FILED W/DOB DOES NOT SHOW THESENothing owed — awaiting certificate of correction
ECB09/26/2008WORK W/O A PERMIT. NOTED: HAVING ERECTED AN OFFICE OR OFFICES STORAGE NEW PARTITIONS,STAIRS,CREATING 2ND FLR SPACE. AT GROUND FLR ART STUDIO,NO PERMIT ON FILES WORK APPROX 99% COMPLETE AT TIME OF INSPECTIONNothing owed — awaiting certificate of correction
ECB03/23/2001FAILURE TO MAINTAIN EXTERIOR BUILDING WALL.NOTED:HOLE IN CORNER OF WEST PARAPET WALL ON REAR ADDITION.BRICKS HAVE FALLEN ON ADJACENT ROOF BELOW.MORE BRICKS AND COPING IN DANGER OF COLLAPSE ONTO ADJACENT ROOF TONothing owed — awaiting certificate of correction
ECB05/06/1998FAILURE TO MAINTAIN BLDG EXTERIOR AT WEST SIDE OF BLDG REAR EXTENSION 2/3RD FLOOR LEVELS BRICKWORK BROKEN. DAMGED & LOOSE WITH DETERIORATED MORTAR JOINTS THROUGHOUT AREA. REMEDY: REPAIR ALL DEFECTS IN A SAFE &Nothing owed — awaiting certificate of correction
ECB12/27/1996OCCUAPNCY CONTRARY TO THAT ALLOWED BY CERTIFICATE OF OCCUPANCY #101546 AT 10/22/92 NOTED: 2ND FLOOR OFFICE SPACES OCCUPANCY GR. E) NOW BEING CHANGED & USED AS 2 NOS APARTMENT WITH KITCHEN BATH SLEEPING FACILITINothing owed — awaiting certificate of correction
ECB06/09/1992NEW BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE O OCCUPANCY APP.#276/92 REMEDY: OBTAIN NEW C OF O. FORTHWITH.Nothing owed — awaiting certificate of correction
ECB07/24/199132 RESEAL BREECHING TO CHIMNEY PROPERLYNothing owed — awaiting certificate of correction