Elevator apt, fireproof with stores
Clarkson Estates
329 CLARKSON AVENUE · BIN 3430375
💬 Discuss this project
2024Year Built
9Stories
D6Building Class
M1-1Zoning
348,074 sfGross Floor Area
329Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: CHV 329 CLARKSON AVENUE HOUSING DEVELOPM ENT FUND C · 54,756 sf lot · 6.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof8p · 3 filings · 19 docs
Bulkhead1p · 1 filing · 10 docs
Floor 96p · 2 filings · 11 docs
Floor 85p · 1 filing · 8 docs
Floor 7
Floor 6
Floor 56p · 1 filing · 8 docs
Floor 46p · 1 filing · 8 docs
Floor 36p · 1 filing · 8 docs
Floor 25p · 1 filing · 8 docs
Floor 1Under Construction199p · 1 filing · 20 docs
CellarUnder Construction232p · 4 filings · 20 docs
1 job · most recent 05/28/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2026Signed-offMB MECHANICAL OF NY INCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUY-AH24NL 24,000 BTU · Split System ×1
Heat / Cool
Swegon NAGOLD005FRX 540 CFM · Rooftop Unit ×6
NAGOLD060FRX 5,100 CFM · Rooftop Unit ×4
NAGOLD008FRX 540 CFM · Rooftop Unit ×2
NAGOLD00FRX 540 CFM · Rooftop Unit ×2
NAGOLD020FRX 1,620 CFM · Rooftop Unit ×2
NAGOLD030FRX 2,532 CFM · Rooftop Unit ×2
NAGOLD040FRX 4,320 CFM · Rooftop Unit ×2
Mitsubishi Electric PURY-P72TNU-A 72,000 BTU · Vrf Outdoor ×6
PURY-P96TNU-A 96,000 BTU · Vrf Outdoor ×4
MXZ-SM36NAM2 36,000 BTU · Split System ×2
TUHYP1443AN40A 144,000 BTU · Vrf Outdoor ×2
Ventilation
Ventacity VS900 752 CFM · Erv ×10
VS400 361 CFM · Erv ×8
Swegon NAGOLD020FRX 2,112 CFM · Erv ×2
Ducts & Piping
N/A NA 1 BTU · Ductwork ×1
1 job · most recent 11/17/2025
FiledStatusContractorScope
11/17/2025Signed-offF.S. SITE CORP3,819 heads, 5 outlets
2 jobs · most recent 05/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/28/2026Signed-offF.S. SITE CORPGas, Storm, Water/Sanitary
11/17/2025Signed-offF.S. SITE CORP—
5 jobs · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedJ.W. ELECTRIC CORPGeneral Wiring
05/29/2026CompleteACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
09/23/2024CompleteTUXEDO ELEC'L CONTR'G INC—
04/18/2024CompleteTOP SHELF ELECTRIC CORP—
03/05/2024CompleteJ.W. ELECTRIC CORP1 meters, 1 new_meters
1 job · most recent 05/28/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/28/2026Signed-offMB MECHANICAL OF NY INCSteel, Concrete, Masonry
Building Lifecycle
All (157)Filed (34)Permit Issued (23)Signed Off (15)Violation (16)Inspection (22)Objection (17)Special Inspection (30)
07/24/2026
Objection raised — Other
07/08/2026
Signed off — Alteration
Multipoint Suspended Scaffold Installation as per plans filed herewith. No change in egress, use or occupancy.
B01120850-S1
07/08/2026
Signed off — Alteration
Multipoint Suspended Scaffold Installation as per plans filed herewith. No change in egress, use or occupancy.
B01120850-I1
07/07/2026
Signed off — Alteration
FILING HEREWITH INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM FOR NEW BUILDING AS PER PLANS.
B00779534-I1
06/24/2026
Signed off — New Building
JOB WAS ACCEPTED INTO THE HUB PROGRAM BY MR. RAMI BITAR ON 2/8/22. FILING A MIXED USE NEW BUILDING AS PER PLANS. A NYS OVERRIDE WILL BE ISSUED FOR THE ZONING DISTRICT.
B00681143-S3
06/23/2026
Signed off — New Building
JOB WAS ACCEPTED INTO THE HUB PROGRAM BY MR. RAMI BITAR ON 2/8/22. FILING A MIXED USE NEW BUILDING AS PER PLANS. A NYS OVERRIDE WILL BE ISSUED FOR THE ZONING DISTRICT.
B00681143-S4
06/12/2026
Filed — No Work
B01415061-I1
06/10/2026
Special inspection requirement — Public Assembly Emergency Lighting
EDWIN HOPKINS
06/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Final
EDWIN HOPKINS
06/01/2026
Special inspection requirement — Interior lighting power
STEVEN KLOCKE
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
STEVEN KLOCKE
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Maintenance information
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Shutoff dampers
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Lighting in dwelling units
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Lighting controls
STEVEN KLOCKE
06/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Electrical motors and elevators
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Metering
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Exterior lighting power
STEVEN KLOCKE
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
06/01/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
05/28/2026
Filed — New Building
JOB WAS ACCEPTED INTO THE HUB PROGRAM BY MR. RAMI BITAR ON 2/8/22. FILING A MIXED USE NEW BUILDING AS PER PLANS. A NYS OVERRIDE WILL BE ISSUED FOR THE ZONING DISTRICT.
B00681143-B2
05/19/2026
Signed off — Alteration
FILING HEREWITH INSTALLATION OF CURB CUT FOR PARKING GARAGE IN CONJUNCTION WITH NB.
B00787687-I1
05/19/2026
Filed — New Building
JOB WAS ACCEPTED INTO THE HUB PROGRAM BY MR. RAMI BITAR ON 2/8/22. FILING A MIXED USE NEW BUILDING AS PER PLANS. A NYS OVERRIDE WILL BE ISSUED FOR THE ZONING DISTRICT.
B00681143-B1
05/14/2026
Special inspection requirement — Maintenance information
STEVEN KLOCKE
05/14/2026
Special inspection requirement — Air barrier - visual inspection
STEVEN KLOCKE
05/14/2026
Special inspection requirement — Lighting in dwelling units
STEVEN KLOCKE
05/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
STEVEN KLOCKE
05/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
STEVEN KLOCKE
05/14/2026
Special inspection requirement — Exterior lighting power
STEVEN KLOCKE
05/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
STEVEN KLOCKE
05/14/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
EDWIN HOPKINS
05/14/2026
Special inspection requirement — Sprayed fire-resistant materials
EDWIN HOPKINS
05/14/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
EDWIN HOPKINS
05/14/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
EDWIN HOPKINS
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
STEVEN KLOCKE
05/12/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/09/2026
Filed — New Building
JOB WAS ACCEPTED INTO THE HUB PROGRAM BY MR. RAMI BITAR ON 2/8/22. FILING A MIXED USE NEW BUILDING AS PER PLANS. A NYS OVERRIDE WILL BE ISSUED FOR THE ZONING DISTRICT.
B00681143-A9
04/03/2026
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00946265-I1
03/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/19/2026
Signed off — Alteration
INSTALLATON OF (3) THREE TEMPORARY STANDPIPE IN CONJUNCTION WITH NB APPLICATION #B00681143 AS PER PLANS
B00901052-I1
03/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Permit issued — Curb Cut
B00787687-I1-CC
02/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01077243-I1
02/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01077243-S1
02/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
B01160424-I1
02/13/2026
Filed — New Building
JOB WAS ACCEPTED INTO THE HUB PROGRAM BY MR. RAMI BITAR ON 2/8/22. FILING A MIXED USE NEW BUILDING AS PER PLANS. A NYS OVERRIDE WILL BE ISSUED FOR THE ZONING DISTRICT.
B00681143-A7
01/30/2026
Violation issued (ECB, closed)
Unknown
01/30/2026
Violation issued (ECB, closed)
Construction
01/07/2026
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00939195-I1
01/07/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/06/2026
Filed — New Building
JOB WAS ACCEPTED INTO THE HUB PROGRAM BY MR. RAMI BITAR ON 2/8/22. FILING A MIXED USE NEW BUILDING AS PER PLANS. A NYS OVERRIDE WILL BE ISSUED FOR THE ZONING DISTRICT.
B00681143-A6
12/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 157 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAMBA HOUSING VENTURES5609/20/2026
BRUNO FRUSTACI CONTRACTING1503/22/2026
VIK XS SERVICES403/21/2026
DORIA203/21/2026
SKYLINE SCAFFOLDING GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.3903/21/2026
STRACAR ENGINEERING P C203/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
Rigid Structural Design, LLC203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
AO CONSULTING AND DRAFTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRUNO FRUSTACI CONTRACTING INCGeneral Contractor1207/08/2026
F.S. SITE CORPPlumbing507/08/2026
F.S. SITE CORPFire Protection307/08/2026
MB MECHANICAL OF NY INCGeneral Contractor206/17/2026
K.M.D MECHANICAL 1443 LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES97311105/28/2026
VIBRANALYSIS INC., DBA VT6864508/15/2025
SYNERGIC DESIGN LLC8561105/16/2025
SKYLINE RIGGING7880101/21/2025
MUESER RUTLEDGE CONSULTIN977401/30/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBRUNO FRUSTACI CONTRACTING INC02/26/2026
DOB NOWMechanical SystemsSigned-offMB MECHANICAL OF NY INC10/06/2025
DOB NOWStandpipeSigned-offALAN J. BRUTOSKY PLBG CON09/22/2025
DOB NOWStandpipeSigned-offALAN J BRUTOSKY PLBR CONT09/19/2025
DOB NOWSprinklersSigned-offK.M.D MECHANICAL 1443 LLC09/18/2025
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC09/10/2025
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC09/09/2025
DOB NOWStructuralSigned-offBRUNO FRUSTACI CONTRACTING INC07/02/2025
DOB NOWPlumbingSigned-offALAN J BRUTOSKY PLBR CONT03/24/2025
DOB NOWStandpipeSigned-offALAN J. BRUTOSKY PLBG CON03/20/2025
DOB NOWSprinklersSigned-offALAN J BRUTOSKY PLBR CONT03/20/2025
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC12/12/2024
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC11/14/2024
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC11/08/2024
DOB NOWMechanical SystemsSigned-offMB MECHANICAL OF NY INC10/15/2024
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC05/07/2024
DOB NOWStandpipeSigned-offALAN J BRUTOSKY PLBR CONT03/25/2024
DOB NOWSprinklersSigned-offALAN J. BRUTOSKY PLBG CON03/25/2024
DOB NOWPlumbingSigned-offALAN J BRUTOSKY PLBR CONT03/22/2024
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC03/18/2024
DOB NOWFoundationSigned-offBRUNO FRUSTACI CONTRACTING INC11/16/2023
DOB NOWSupport of ExcavationSigned-offBRUNO FRUSTACI CONTRACTING INC11/13/2023
DOB NOWGeneral ConstructionPermit IssuedBRUNO FRUSTACI CONTRACTING INC11/09/2023
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
05/12/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
11/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/28/2024Pass-Final PL - UndergroundPassView ↗
05/09/2024Pass-Final PL - UndergroundPassView ↗
04/18/2024Pass-Final PL - UndergroundPassView ↗
04/10/2024Pass-Final PL - UndergroundPassView ↗
04/01/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
06/10/2026Public Assembly Emergency LightingEDWIN HOPKINSprogress
06/01/2026FinalEDWIN HOPKINSprogress
06/01/2026Mechanical SystemsEDWIN HOPKINSspecial
06/01/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
06/01/2026HVAC-R and service water heating system controlsSTEVEN KLOCKEenergy_progress
06/01/2026Interior lighting powerSTEVEN KLOCKEenergy_progress
06/01/2026Lighting controlsSTEVEN KLOCKEenergy_progress
06/01/2026Electrical motors and elevatorsSTEVEN KLOCKEenergy_progress
06/01/2026HVAC-R and service water piping design and insulationSTEVEN KLOCKEenergy_progress
06/01/2026Lighting in dwelling unitsSTEVEN KLOCKEenergy_progress
06/01/2026MeteringSTEVEN KLOCKEenergy_progress
06/01/2026Exterior lighting powerSTEVEN KLOCKEenergy_progress
06/01/2026Maintenance informationSTEVEN KLOCKEenergy_progress
06/01/2026Shutoff dampersSTEVEN KLOCKEenergy_progress
06/01/2026Duct leakage testing, insulation and designSTEVEN KLOCKEenergy_progress
06/01/2026HVAC-R and service water heating equipmentSTEVEN KLOCKEenergy_progress
05/14/2026Wall Panels, Curtain Walls, and VeneersEDWIN HOPKINSspecial
05/14/2026Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
05/14/2026Fenestration areasSTEVEN KLOCKEenergy_progress
05/14/2026Insulation placement and R valuesSTEVEN KLOCKEenergy_progress
05/14/2026VestibulesSTEVEN KLOCKEenergy_progress
05/14/2026Air barrier - visual inspectionSTEVEN KLOCKEenergy_progress
05/14/2026Protection of exposed foundation insulationSTEVEN KLOCKEenergy_progress
05/14/2026Fenestration air leakageSTEVEN KLOCKEenergy_progress
05/14/2026Air barrier continuity plan testingSTEVEN KLOCKEenergy_progress
Latest 25 of 123.
▾Documents — 217 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch35
08/28/2026B00787687-I1Request digital key ↗
08/26/2026B00901052-I1Request digital key ↗
08/24/2026B01077243-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/19/2026B01294607-I1Request digital key ↗
08/16/2026B01415061-I1Request digital key ↗
▸Applications & Permits7
▸DOB NOWDEP Stormwater Construction Permit3
08/13/2026B00681143-S5Open ↗
08/13/2026B00681143-P3Open ↗
08/13/2026B00681143-P2Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
11/01/2023340867066Open ↗
11/02/2022340867066Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
03/14/2024340867066Open ↗
11/02/2022340867066Open ↗
▸Zoning, Tax Lot & Property Records21
▸DOB NOWRestrictive Declaration/Easement 112
08/17/2026B00681143-B2Open ↗
08/17/2026B00681143-A9Open ↗
08/13/2026B00681143-P7Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/17/2026B00681143-A9Open ↗
08/13/2026B00681143-P7Open ↗
08/13/2026B00681143-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/17/2026B00681143-A9Open ↗
08/13/2026B00681143-P7Open ↗
08/13/2026B00681143-A7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00681143-I1Open ↗
▸Seals & Professional Certifications83
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/26/2026B00901052-I1Open ↗
08/24/2026B01077243-I1Open ↗
08/24/2026B01077243-S1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/27/2026B00681143-A4Open ↗
09/01/2026B00681143-P4Open ↗
09/01/2026B00681143-B2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/26/2026B01160424-I1Open ↗
09/23/2026B00779534-I1Open ↗
09/23/2026B00901052-I1Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/02/2022340867066Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/02/2022340867066Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00681143-P7Open ↗
08/13/2026B00681143-A7Open ↗
08/13/2026B00681143-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026B00681143-I1—
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/17/2026B00681143-P7Open ↗
08/17/2026B00681143-I1Open ↗
08/17/2026B00681143-A9Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
03/21/2024340867066Open ↗
▸BISSTREET TREE CHECKLIST1
09/21/2023340867066Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00681143-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/17/2026B00681143-S3Open ↗
08/17/2026B00681143-S4Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/21/2026B01224271-I1Open ↗
08/19/2026B00779534-I1Open ↗
08/17/2026B00681143-S5Open ↗
Showing 3 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/01/2023340867066Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
03/21/2024340867066Open ↗
11/01/2023340867066Open ↗
09/21/2023340867066Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/02/2022340867066Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/02/2022340867066Open ↗
▸Other Documents26
▸DOB NOWSite Survey: Initial5
08/17/2026B00681143-A9Open ↗
08/14/2026B00681143-B1Open ↗
08/13/2026B00681143-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026B00681143-I1Open ↗
08/17/2026B00681143-P7Open ↗
08/17/2026B00681143-A9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/17/2026B00681143-A9Open ↗
08/13/2026B00681143-I1Open ↗
08/13/2026B00681143-P7Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
11/01/2023340867066Open ↗
11/01/2023340867066Open ↗
11/01/2023340867066Open ↗
▸DOB NOWCalculations3
08/21/2026B01160424-I1Open ↗
08/13/2026B01160424-P1Open ↗
08/13/2026B01120850-S2Open ↗
▸DOB NOWManufacturer's Specifications3
08/21/2026B01160424-I1Open ↗
08/13/2026B01120850-S2Open ↗
08/13/2026B01160424-P1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
11/01/2023340867066Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00681143-S5Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1