← Back
BuildNYC
Elevator apt, artists in residence
329 GREENWICH STREET
MANHATTAN · BIN 1001551
💬 Discuss this project
1887Year Built
5Stories
D2Building Class
C6-2AZoning
11,309 sfGross Floor Area
9Units
2 Active Violations 3 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, artists in residence · Owner of record: SMCB Associates · 2,500 sf lot · 4.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofS.m.c.b. AssociatesUnder Construction2p · 2 filings · 20 docs
Floor 5S.m.c.b. AssociatesUnder Construction3p · 2 filings · 20 docs
Floor 4Unit 4E, Unit 4WUnder Construction4p · 3 filings · 20 docs
Floor 3S.m.c.b. AssociatesUnder Construction5p · 2 filings · 20 docs
Floor 2Unit 2WUnder Construction4p · 2 filings · 20 docs
Floor 1S.m.c.b. Associates1p · 2 filings · 20 docs
CellarS.m.c.b. AssociatesUnder Construction14p · 4 filings · 20 docs
Site & exteriorS.m.c.b. Associates8p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S.M.C.B. Associates4207/08/2026
SMC Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Costa Arch & Engineering702/18/2026
John G. Sisk, PE110/24/2025
Phase Zero Design110/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Costa1403/21/2026
Think Design Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jodom MechanicalPlumbing607/08/2026
R.N.K. Romeo ConstructionScaffold303/21/2026
County Electrical Contractor IElectrical103/21/2026
R.N.K. Romeo ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Costa Architects & Engineering1321502/18/2026
Kadan5956202/18/2026
Think Design Architectura683110/09/2025
Building Lifecycle
07/22/2026
No certificate of correction on file for class 1 failure-to-maintain violation #39069464R issued 9/6/2022 citing the vault beneath the public…
ECB violation · open
06/18/2026
Permit renewed — Plumbing
Renewed without changes
M00304802-I1-PL
06/18/2026
Permit renewed — Plumbing
Renewed without changes
M00304354-I1-PL
06/18/2026
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
M00921924-I1-FN
03/31/2026
Signed off — Alteration
M00678284-I1
95 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJodom Mechanical06/18/2026
DOB NOWPlumbingPermit IssuedJodom Mechanical06/18/2026
DOB NOWGeneral ConstructionSigned-offR.N.K. Romeo Construction06/18/2025
DOB NOWConstruction FencePermit IssuedR.N.K. Romeo Construction06/18/2025
DOB NOWPlumbingPermit IssuedJodom Mechanical05/08/2025
DOB NOWPlumbingPermit IssuedJodom Mechanical05/08/2025
DOB NOWPlumbingPermit IssuedJodom Mechanical08/31/2021
DOB NOWPlumbingPermit IssuedJodom Mechanical08/31/2021
BISPLISSUEDJodom Mechanical09/05/2025
BIS—ISSUEDL&T Consultants07/16/2025
BIS—ISSUEDPlatinum Builders08/23/2022
BISPLISSUEDJodom Mechanical09/02/2021
BIS—ISSUEDPlatinum Builders07/15/2021
BIS—ISSUEDVillano Construction06/22/2020
BIS—ISSUEDVillano Construction09/25/2019
BIS—ISSUEDGreenline Developers11/14/2018
BIS—ISSUEDGreenline Developers08/02/2017
BIS—ISSUEDGreenline Developers08/01/2016
BISPLISSUEDEmpire Plumbing12/15/2015
BISMHISSUEDSkilco12/14/2015
BIS—ISSUEDGreenline Developers06/19/2015
BIS—ISSUEDGreenline Developers08/11/2014
BISPLISSUEDWaterfire01/16/2014
BISSPISSUEDSafety Fire Sprinkler10/28/2013
BISEQISSUEDChief Fire Prevention & Mechanical10/07/2013
BISPLISSUEDAll Day Plumbing & Heating09/17/2013
BISOTISSUEDPrecision Innovations NY07/12/2013
BISFPISSUEDIdeal Fire Systems10/28/2005
BISOTISSUEDDanjor Construction05/19/2005
BIS—ISSUEDCharles M Trojahn08/13/2004
BISEQISSUEDHI Tech Bridging03/13/2002
BIS—ISSUEDCJM 7th Ave04/02/2001
BIS—ISSUEDB. Motovich Construction, Mmint11/18/1994
BISFPISSUEDIdeal Fire Control07/29/1992
1 project · most recent 01/09/2023
Others
FiledStatusContractorScope
01/09/2023——Others
3 projects · most recent 10/24/2025
Water/Sanitary Gas
FiledStatusContractorScope
10/24/2025——Water/Sanitary
08/03/2021Permit IssuedJodom MechanicalWater/Sanitary
04/07/2020Permit IssuedJodom MechanicalGas, Water/Sanitary
2 projects · most recent 11/05/2025
General Wiring
FiledStatusContractorScope
11/05/2025CompletePrime ElectricalGeneral Wiring
12/21/2021Permit IssuedPrime ElectricalGeneral Wiring
1 project · most recent 08/03/2023
Steel Wood
FiledStatusContractorScope
08/03/2023——Steel, Wood
1 project · most recent 08/28/2023
Fence
FiledStatusContractorScope
08/28/2023Permit IssuedR.N.K. Romeo ConstructionFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/26/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/02/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
03/01/2026Post-installed AnchorsGEORGE OZAETAspecial
03/01/2026Fire-Resistant Penetrations and JointsANGELO COSTAspecial
03/01/2026Structural Steel - DetailsGEORGE OZAETAspecial
03/01/2026FinalGEORGE OZAETAprogress
03/01/2026Structural Cold-Formed SteelGEORGE OZAETAspecial
03/01/2026Concrete - Cast-In-PlaceGEORGE OZAETAspecial
03/01/2026Structural Stability – Alterations of existing buildingsGEORGE OZAETAspecial
03/01/2026Structural Steel - WeldingGEORGE OZAETAspecial
02/06/2026Structural Steel - DetailsGEORGE OZAETAspecial
02/06/2026FinalGEORGE OZAETAprogress
02/06/2026Structural Stability – Alterations of existing buildingsGEORGE OZAETAspecial
02/06/2026Structural Steel - WeldingGEORGE OZAETAspecial
02/06/2026Concrete - Cast-In-PlaceGEORGE OZAETAspecial
02/06/2026Fire-Resistant Penetrations and JointsANGELO COSTAspecial
02/06/2026Post-installed AnchorsGEORGE OZAETAspecial
02/06/2026Structural Cold-Formed SteelGEORGE OZAETAspecial
10/09/2025Tenant Protection Plan Compliance—special
08/01/2025Tenant Protection Plan Compliance—special
06/17/2025Maintenance information—energy_progress
06/17/2025Fire-Resistant Penetrations and Joints—special
06/17/2025Energy Code Compliance Inspections—progress
06/17/2025HVAC-R and service water piping design and insulation—energy_progress
06/17/2025Permanent certificate—energy_progress
06/11/2025Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
07/31/2023Tenant Protection Plan Compliance—special
Latest 25 of 44.
290 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account