← Back
BuildNYC
Two family frame
329 PROSPECT AVENUE
BROOKLYN · BIN 3024298
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R5BZoning
1,710 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family frame · Owner of record: Townhouse Rental · 1,560 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 2 filings · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar9p · 2 filings · 20 docs
Basement1p · 1 filing · 9 docs
Sub-Basement7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
USA Development1207/08/2026
Townhouse Rental103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/11/2022$2.9M—382 EAST 91 LLC → TOWNHOUSE RENTAL II, L.L.C.$1,690/sf building
08/13/2021$1.3M—Private party → 382 EAST 91 LLC$775/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LWL Associates405/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Top Dog Plumbing & HeatingPlumbing207/08/2026
Stellar IndustriesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc Consulting Engineers4083205/17/2022
Lam and Co Consulting8065205/17/2022
Building Lifecycle
06/21/2022
Signed off — Alteration
PROPOSED PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION APPLICATION FOR EXITING 2-FAMILY 2-SOTYR REISDENTIAL BUILIDNG WITH BASEMENT AND CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00572489-I1
06/10/2022
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 1-FAMILY 2-STY. RESIDENTIAL BUILDING WITH BSMT & CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00568167-I1
06/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/27/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/18/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAN PEREZ
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTop Dog Plumbing & Heating05/04/2022
DOB NOWGeneral ConstructionSigned-offStellar Industries09/10/2021
DOB NOWPlumbingSigned-offTop Dog Plumbing & Heating09/07/2021
BISOTISSUEDHerminio Desantos05/07/1996
2 projects · most recent 05/31/2022
General Wiring
FiledStatusContractorScope
05/31/2022CompleteRoyal Electrical ContractingGeneral Wiring
08/23/2021CompleteRoyal Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/27/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/18/2022Structural Stability – Alterations of existing buildingsJAN PEREZspecial
05/18/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
05/18/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
05/18/2022Lighting in dwelling unitsCHI WAI CHUNGenergy_progress
05/18/2022Fenestration air leakageCHI WAI CHUNGenergy_progress
05/18/2022Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
05/18/2022Fenestration areasCHI WAI CHUNGenergy_progress
05/18/2022Lighting controlsCHI WAI CHUNGenergy_progress
05/18/2022Air barrier - visual inspectionCHI WAI CHUNGenergy_progress
05/18/2022Interior lighting powerCHI WAI CHUNGenergy_progress
05/18/2022Insulation placement and R valuesCHI WAI CHUNGenergy_progress
05/18/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
05/18/2022Exterior lighting powerCHI WAI CHUNGenergy_progress
05/17/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
05/17/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
05/17/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
05/17/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
05/12/2022Fenestration areasCHI WAI CHUNGenergy_progress
05/12/2022Fenestration air leakageCHI WAI CHUNGenergy_progress
05/12/2022Insulation placement and R valuesCHI WAI CHUNGenergy_progress
05/12/2022Exterior lighting powerCHI WAI CHUNGenergy_progress
05/12/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
05/12/2022Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
05/12/2022Lighting controlsCHI WAI CHUNGenergy_progress
05/12/2022Lighting in dwelling unitsCHI WAI CHUNGenergy_progress
Latest 25 of 30.
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account