← Back
Walk-up apt, over six families with stores
329 WADSWORTH AVENUE
MANHATTAN · BIN 1064016
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R7-2Zoning
28,740 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized14 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: ATILIO & ANA CENEDESES LOUNOR REA LTY CO · 6,000 sf lot · 4.79 FAR built · Flood zone X
Locations of Work
Architecture
Floor 52p · 1 filing · 6 docs
Floor 42p · 1 filing · 6 docs
Floor 32p · 1 filing · 6 docs
Floor 22p · 1 filing · 6 docs
Floor 12p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INWOOD REDI CAR INC.503/22/2026
715 HEIGHTS CORP403/21/2026
SHAH BUILDER303/21/2026
716 HEIGHTS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA108/19/2021
GREEN DESIGN104/07/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MSS GOLDEN EAGLE CONSTRUCGeneral Contractor307/08/2026
BAUER MECHANCIAL LLCPlumbing303/22/2026
IVAN DUBBSElectrical103/21/2026
GUITY ZAPATA, CARLOSElectrical103/21/2026
SPEZIALE, JOSEPHElectrical103/21/2026
SAKELLARIS, GEORGEElectrical103/21/2026
HUDSON SCENIC STUDIOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189108/19/2021
Building Lifecycle
All (71)Filed (2)Permit Issued (2)Violation (60)Inspection (4)Special Inspection (3)
04/29/2026
Violation issued (HPD, closed)
A
01/19/2026
Violation issued (HPD, open)
A
01/19/2026
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
05/10/2025
Violation issued (HPD, open)
B
05/10/2025
Violation issued (HPD, open)
B
02/28/2025
Violation issued (HPD, open)
B
02/28/2025
Violation issued (HPD, closed)
A
02/09/2025
Violation issued (HPD, open)
B
08/02/2024
Violation issued (HPD, closed)
C
08/02/2024
Violation issued (HPD, closed)
C
08/02/2024
Violation issued (HPD, closed)
C
08/02/2024
Violation issued (HPD, closed)
B
07/25/2024
Violation issued (HPD, closed)
B
07/25/2024
Violation issued (HPD, closed)
B
07/25/2024
Violation issued (HPD, closed)
B
07/10/2023
Violation issued (HPD, open)
C
07/10/2023
Violation issued (HPD, closed)
B
11/07/2022
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
A
10/27/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/13/2022
Violation issued (ECB, closed)
Construction
11/17/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/09/2021
Permit issued — General Construction
M00500083-I1-GC
08/19/2021
Filed — Alteration
WINDOW LINTEL REPLACEMENT AND GRINDING AND POINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION.
M00500083-I1
04/09/2021
Permit issued — Sidewalk Shed
M00500077-I1-SH
04/09/2021
Violation issued (ECB, closed)
Construction
04/07/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00500077-I1
04/07/2021
Special inspection requirement — Masonry
BRIAN T. O'CONNOR
04/07/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
04/07/2021
Special inspection requirement — Final
Vicente Varela
04/01/2021
Violation issued (HPD, closed)
A
02/16/2021
Violation issued (ECB, closed)
Construction
01/14/2021
Violation issued (HPD, closed)
B
01/14/2021
Violation issued (HPD, closed)
B
01/14/2021
Violation issued (HPD, closed)
A
01/14/2021
Violation issued (HPD, closed)
A
12/08/2020
Violation issued (HPD, closed)
B
12/08/2020
Violation issued (HPD, closed)
A
12/08/2020
Violation issued (HPD, closed)
B
09/03/2020
Violation issued (HPD, closed)
B
09/03/2020
Violation issued (HPD, closed)
B
09/03/2020
Violation issued (HPD, closed)
C
09/03/2020
Violation issued (HPD, closed)
C
09/03/2020
Violation issued (HPD, closed)
B
09/03/2020
Violation issued (HPD, closed)
A
09/03/2020
Violation issued (HPD, closed)
B
08/16/2020
Violation issued (HPD, closed)
B
08/16/2020
Violation issued (HPD, closed)
B
08/16/2020
Violation issued (HPD, closed)
B
08/16/2020
Violation issued (HPD, closed)
B
08/16/2020
Violation issued (HPD, closed)
A
08/16/2020
Violation issued (HPD, closed)
B
08/16/2020
Violation issued (HPD, closed)
B
08/16/2020
Violation issued (HPD, closed)
A
08/16/2020
Violation issued (HPD, closed)
A
08/16/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
B
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMSS GOLDEN EAGLE CONSTRUC09/09/2021
DOB NOWSidewalk ShedPermit IssuedMSS GOLDEN EAGLE CONSTRUC04/09/2021
BISEQISSUEDSHAH BUILDERS INC02/25/2013
BISPLISSUEDCHARLES DIMINO INC.07/16/2004
BIS—ISSUED715 HEITHTS CORP06/18/2004
BISBLISSUEDG BAUER INC01/06/2004
1 project · most recent 04/07/2021
Sidewalk Shed
FiledStatusContractorScope
04/07/2021Permit IssuedMSS GOLDEN EAGLE CONSTRUCSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/27/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/07/2021MasonryBRIAN T. O'CONNORspecial
04/07/2021Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
04/07/2021FinalVicente Varelaprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026M00500077-I1Request digital key ↗
09/03/2026M00500083-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/26/2013121552195Open ↗
▸BISWORK PERMIT APPLICATION1
02/26/2013121552195Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/03/2026M00500083-I1Open ↗
08/13/2026M00500077-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00500083-I1Open ↗
08/28/2026M00500083-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/26/2013121552195Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/26/2013121552195Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M00500083-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/03/2026M00500083-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
02/26/2013121552195Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/26/2013121552195Open ↗