Roof1p · 1 filing · 6 docs
Architecture
Facade Restoration: re-pointing mortar joints; removing existing coating and applying new coating at base stone, window sill, and water table; restoration of deteriorated brownstone.
On file for this project
6 documents · 1 drawing sheet
Floor 18p · 1 filing · 2 docs
EquipmentGeneralLandscapeMechanicalStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Site & exterior3p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
Facade Restoration: re-pointing mortar joints; removing existing coating and applying new coating at base stone, window sill, and water table; restoration of deteriorated brownstone.
On file for this project
6 documents · 4 drawing sheets