Elevator apt, semi-fireproof with stores
33-10 38 AVENUE
QUEENS · BIN 4004575
💬 Discuss this project
2024Year Built
7Stories
D7Building Class
M1-2/R6AZoning
8,380 sfGross Floor Area
11Units
Rent Stabilized17 Open Violations 15 unresolved · 2 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: 38TH AVE DEV LLC · 2,296 sf lot · 3.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction84p · 4 filings · 20 docs
Floor 7Under Construction83p · 1 filing · 20 docs
Floor 6Under Construction110p · 1 filing · 20 docs
Floor 5Under Construction109p · 1 filing · 20 docs
Floor 4Under Construction109p · 1 filing · 20 docs
Floor 3Under Construction109p · 1 filing · 20 docs
Floor 2Under Construction110p · 2 filings · 20 docs
Floor 1Under Construction101p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES2907/08/2026
CLASSIC CONSULTING GROUP303/22/2026
DEVELOPMENT GROUP I VITA103/22/2026
VITAL DEVELOPMENT GROUP 1703/22/2026
38 LIC703/22/2026
VITAL DEVELOPMENT GROUP I103/22/2026
31 DR LIC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2017$1.6M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.503/21/2026
SNR EXPEDITING DESIGN1803/21/2026
SITE SAFETY BSD103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VITAL DEVELOPMENT GROUP IGeneral Contractor2807/08/2026
LG ELITE PLUMBING INCPlumbing1007/14/2026
RELIABLE ENTERPRISES INCGeneral Contractor1007/08/2026
PAUL TOTH EXCAVATION INCGeneral Contractor403/21/2026
CLASSIC CONSULTING GROUPGeneral Contractor203/21/2026
ILG MECH SERVICES, INCPlumbing207/08/2026
JOHN AHRENSElectrical103/21/2026
IRA L GRANDPlumbing103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161103/30/2026
Building Lifecycle
All (95)Filed (25)Permit Issued (32)Signed Off (4)Violation (34)
08/05/2026
Violation issued (ECB, open)
Construction
07/27/2026
Filed — New Building
INSTALLATION OF SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUCTION WITH NB# Q08043398.
Q08043398-S9
07/23/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01078553-I1
07/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177442-I1
07/13/2026
Permit issued — Plumbing
Q61839521-I1-PL
07/02/2026
Violation issued (ECB, open)
Unknown
06/17/2026
Permit issued — Sidewalk Shed
Q01078553-I1-SH
06/04/2026
Violation issued (ECB, open)
Construction
06/04/2026
Violation issued (ECB, closed)
Unknown
06/04/2026
Violation issued (ECB, closed)
Unknown
06/04/2026
Violation issued (ECB, closed)
Construction
05/26/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01078577-I1
05/20/2026
Violation issued (ECB, closed)
Unknown
03/30/2026
Filed — New Building
INSTALLATION OF SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUCTION WITH NB# Q08043398.
Q08043398-P3
02/17/2026
Permit issued — Construction Fence
Q08043398-S6-FN
02/17/2026
Violation issued (ECB, closed)
Unknown
02/11/2026
Permit issued — General Construction
Q08043398-I1-GC
02/06/2026
Permit issued — Construction Fence
Q08043398-S6-FN
02/06/2026
Permit issued — Mechanical Systems
Q08043398-S5-MS
01/26/2026
Permit issued — Plumbing
Q08043398-S3-PL
01/08/2026
Permit issued — Protection and Mechanical Methods
Q01177442-I1-PMM
10/31/2025
Permit issued — Mechanical Systems
Q08043398-S5-MS
09/22/2025
Permit issued — Construction Fence
Q08043398-S6-FN
09/19/2025
Permit issued — General Construction
Q08043398-I1-GC
09/19/2025
Permit issued — General Construction
Q08043398-I1-GC
08/27/2025
Permit issued — Sprinklers
Q08043398-S4-EW-SP
07/09/2025
Filed — New Building
INSTALLATION OF SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUCTION WITH NB# Q08043398.
Q08043398-P2
06/27/2025
Violation issued (ECB, closed)
Construction
06/23/2025
Permit issued — Sidewalk Shed
Q01078553-I1-SH
06/23/2025
Permit issued — Supported Scaffold
Q01078577-I1-SF
05/27/2025
Permit issued — Sprinklers
Q08043398-S4-EW-SP
05/08/2025
Violation issued (ECB, closed)
Unknown
03/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177442-P3
03/14/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01078577-P2
03/14/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01078553-P1
03/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177442-P2
03/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177442-P1
03/06/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Violation issued (ECB, closed)
Unknown
03/06/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Violation issued (ECB, closed)
Construction
02/10/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01078577-P1
02/07/2025
Permit issued — General Construction
Q08043398-I1-GC
02/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177442-I1
02/06/2025
Permit issued — Structural
Q08043398-S2-ST
02/06/2025
Permit issued — Construction Fence
Q08043398-S6-FN
02/06/2025
Permit issued — Protection and Mechanical Methods
Q01177442-I1-PMM
02/06/2025
Permit issued — Foundation
Q08043398-S1-FO-EA
02/06/2025
Violation issued (ECB, closed)
Construction
01/16/2025
Permit issued — Plumbing
Q08043398-S3-PL
01/02/2025
Filed — New Building
INSTALLATION OF SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUCTION WITH NB# Q08043398.
Q08043398-S5
11/29/2024
Violation issued (HPD, open)
I
11/21/2024
Permit issued — Construction Fence
Q08043398-S6-FN
10/22/2024
Permit issued — Earth Work
Q08043398-S1-FO-EA
10/21/2024
Filed — New Building
INSTALLATION OF SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUCTION WITH NB# Q08043398.
Q08043398-S4
10/17/2024
Permit issued — Plumbing
Q01119692-I1-PL
10/11/2024
Permit issued — Structural
Q08043398-S2-ST
10/10/2024
Filed — New Building
INSTALLATION OF SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUCTION WITH NB# Q08043398.
Q08043398-S6
10/08/2024
Signed off — Full Demolition
Q00997783-I1
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC07/13/2026
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC06/17/2026
DOB NOWConstruction FencePermit IssuedVITAL DEVELOPMENT GROUP I02/17/2026
DOB NOWGeneral ConstructionPermit IssuedVITAL DEVELOPMENT GROUP I02/11/2026
DOB NOWConstruction FencePermit IssuedVITAL DEVELOPMENT GROUP I02/06/2026
DOB NOWMechanical SystemsPermit IssuedVITAL DEVELOPMENT GROUP I02/06/2026
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC01/26/2026
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC01/08/2026
DOB NOWMechanical SystemsPermit IssuedVITAL DEVELOPMENT GROUP I10/31/2025
DOB NOWConstruction FencePermit IssuedVITAL DEVELOPMENT GROUP I09/22/2025
DOB NOWGeneral ConstructionPermit IssuedVITAL DEVELOPMENT GROUP I09/19/2025
DOB NOWGeneral ConstructionPermit IssuedVITAL DEVELOPMENT GROUP I09/19/2025
DOB NOWSprinklersPermit IssuedIRA L GRAND08/27/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC06/23/2025
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC06/23/2025
DOB NOWSprinklersPermit IssuedIRA L GRAND05/27/2025
DOB NOWGeneral ConstructionPermit IssuedVITAL DEVELOPMENT GROUP I02/07/2025
DOB NOWStructuralPermit IssuedVITAL DEVELOPMENT GROUP I02/06/2025
DOB NOWConstruction FencePermit IssuedVITAL DEVELOPMENT GROUP I02/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC02/06/2025
DOB NOWFoundationPermit IssuedVITAL DEVELOPMENT GROUP I02/06/2025
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC01/16/2025
DOB NOWConstruction FencePermit IssuedVITAL DEVELOPMENT GROUP I11/21/2024
DOB NOWEarth WorkPermit IssuedVITAL DEVELOPMENT GROUP I10/22/2024
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC10/17/2024
DOB NOWStructuralPermit IssuedVITAL DEVELOPMENT GROUP I10/11/2024
DOB NOWEarth WorkPermit IssuedVITAL DEVELOPMENT GROUP I10/08/2024
DOB NOWConstruction FenceSigned-offPAUL TOTH EXCAVATION INC07/26/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC07/23/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC07/23/2024
DOB NOWFull DemolitionSigned-offPAUL TOTH EXCAVATION INC07/22/2024
DOB NOWSidewalk ShedPermit IssuedCLASSIC CONSULTING GROUP07/16/2024
1 project · most recent 07/27/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedLG ELITE PLUMBING INCStorm, Water/Sanitary
4 projects · most recent 09/17/2025
General Wiring
FiledStatusContractorScope
09/17/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
03/21/2025Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
07/11/2024CompleteRICHARD NEU—
06/29/2024CompleteRICHARD NEU—
1 project · most recent 07/27/2026
Concrete Masonry
FiledStatusContractorScope
07/27/2026Permit IssuedVITAL DEVELOPMENT GROUP IConcrete, Masonry
3 projects · most recent 07/27/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
07/27/2026Permit IssuedVITAL DEVELOPMENT GROUP IFence
03/14/2025Signed-offRELIABLE ENTERPRISES INCSidewalk Shed
03/14/2025Signed-offRELIABLE ENTERPRISES INCScaffold
1 project · most recent 07/27/2026
Earthwork
FiledStatusContractorScope
07/27/2026Permit IssuedVITAL DEVELOPMENT GROUP IEarthwork
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
04/14/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/14/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/14/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/14/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/14/2026Maintenance informationFAHAD FATEHenergy_progress
04/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
04/06/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/06/2026Exterior lighting powerFAHAD FATEHenergy_progress
04/06/2026MeteringFAHAD FATEHenergy_progress
04/06/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/06/2026Air barrier — testing FAHAD FATEHenergy_progress
04/06/2026Interior lighting powerFAHAD FATEHenergy_progress
04/06/2026Fenestration air leakageFAHAD FATEHenergy_progress
04/06/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/06/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
04/06/2026MasonryFAHAD FATEHspecial
04/06/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/06/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/06/2026Mastic and Intumescent Fire-resistant CoatingsFAHAD FATEHspecial
04/06/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/06/2026Permanent certificateFAHAD FATEHenergy_progress
04/06/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/06/2026Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
04/06/2026Lighting controlsFAHAD FATEHenergy_progress
04/06/2026Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 79.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/22/2026Q01070631-I1Request digital key ↗
08/21/2026Q01119692-I1Request digital key ↗
08/21/2026Q08043398-P4Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION6
09/10/2019421913692Open ↗
06/26/2019421689710Open ↗
11/27/2018421689710Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
09/10/2019421913692Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/21/2026Q08043398-P1Open ↗
08/14/2026Q08043398-I1Open ↗
08/13/2026Q08043398-P2Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/22/2026Q01070631-I1Open ↗
08/21/2026Q01119692-I1Open ↗
08/21/2026Q08043398-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026Q08043398-S4Open ↗
09/18/2026Q08043398-S2Open ↗
08/29/2026Q08043398-S5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/18/2026Q08043398-S2Open ↗
08/29/2026Q08043398-S5Open ↗
08/29/2026Q08043398-S5Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/02/2018421654686Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026Q08043398-P1Open ↗
08/14/2026Q08043398-I1Open ↗
08/13/2026Q08043398-P2Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/02/2018421654686Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00997783-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00997783-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00997783-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00997783-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/21/2026Q08043398-P1Open ↗
08/14/2026Q08043398-I1Open ↗
08/13/2026Q08043398-P2Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/27/2018421689710Open ↗
▸BISSTREET TREE CHECKLIST1
08/02/2018421654686Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08043398-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWOER: Notice to Proceed11
08/21/2026Q08043398-S3Open ↗
08/14/2026Q08043398-P3Open ↗
08/14/2026Q08043398-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWRodent Control1
08/13/2026Q00997783-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/02/2018421654686Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q08043398-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q08043398-S1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/10/2019421913692Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/02/2018421654686Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
09/10/2019421913692Open ↗
11/27/2018421689710Open ↗
08/02/2018421654686Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/10/2019421913692Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/21/2026Q08043398-P1Open ↗
08/14/2026Q08043398-I1Open ↗
08/13/2026Q08043398-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026Q08043398-P1Open ↗
08/14/2026Q08043398-I1Open ↗
08/13/2026Q08043398-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q08043398-P1Open ↗
08/14/2026Q08043398-I1Open ↗
08/13/2026Q08043398-P2Open ↗
▸DOB NOWStructure Photographs2
08/13/2026Q00997783-P1Open ↗
08/13/2026Q00997783-I1Open ↗
▸BISPLOT DIAGRAM1
08/02/2018421654686Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08043398-S1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00997783-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00997783-I1Open ↗