← Back
Primarily 2 family with 1 store or office
33-18 DITMARS BOULEVARD
QUEENS · BIN 4017043
💬 Discuss this project
1928Year Built
3Stories
S2Building Class
R5DZoning
4,752 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: 3318 JK LLC · 2,000 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
Civil
Cellar1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING307/08/2026
3318 JK1607/08/2026
BASIC GROUPS CORP503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/08/2023$2.5M—— → —$516/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC602/03/2024
NIC 88 CORP109/21/2023
ASR ENGINEERING PC109/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506602/03/2024
NIC 88 CORP8371109/21/2023
Building Lifecycle
All (26)Filed (8)Permit Issued (4)Signed Off (3)Violation (7)Inspection (4)
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2024
Signed off — Alteration
Q00906873-I1
05/30/2024
Signed off — Alteration
Q00906873-S1
02/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2024
Filed — Alteration
Q00906873-P4
01/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/26/2024
Filed — Alteration
Q00906873-P3
01/26/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/23/2024
Filed — Alteration
Q00906873-P2
01/11/2024
Filed — Alteration
Q00906873-P1
11/15/2023
Signed off — Alteration
Proposed replace parapet wall of existing 6 story building. Construction work as per plan. No change in egress, use, or occupancy. Scaffold and street shed under another job number.
Q00933175-I1
09/25/2023
Permit issued — General Construction
Q00933175-I1-GC
09/21/2023
Filed — Alteration
Proposed replace parapet wall of existing 6 story building. Construction work as per plan. No change in egress, use, or occupancy. Scaffold and street shed under another job number.
Q00933175-I1
09/07/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00928835-I1
09/07/2023
Permit issued — Sidewalk Shed
Q00928835-I1-SH
08/02/2023
Permit issued — Boiler Equipment
Q00906873-S1-BE
08/02/2023
Permit issued — Plumbing
Q00906873-I1-PL
07/21/2023
Filed — Alteration
Q00906873-I1
07/21/2023
Filed — Alteration
Q00906873-S1
04/22/2021
Violation issued (HPD, closed)
I
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2011
Violation issued (ECB, closed)
Construction
12/22/2011
Violation issued (ECB, closed)
Construction
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY09/25/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING09/07/2023
DOB NOWBoiler EquipmentSigned-offQMB PLUMBING & HEATING INC08/02/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC08/02/2023
BISFPISSUEDUNIQUE FIRE SYSTEMS INC02/13/2012
BISPLISSUEDC.R.U. MECHAN & HEAT INC12/28/2011
BISEQISSUEDTOTAL METAL CORP12/23/2011
BISOTISSUEDTOTAL METAL CORP12/23/2011
BISPLISSUEDC.R.U. MECHAN & HEAT INC11/21/2011
BISEQISSUEDTOTAL METAL CORP11/07/2011
BISOTISSUEDTOTAL METAL CORP11/07/2011
1 project · most recent 09/08/2023
FiledStatusContractorScope
09/08/2023Permit IssuedRICHARD NEU—
1 project · most recent 09/07/2023
Sidewalk Shed
FiledStatusContractorScope
09/07/2023Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
02/05/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/05/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
02/05/2024Maintenance informationXIAOHONG ZHAOenergy_progress
02/05/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
02/05/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
02/05/2024Tenant Protection Plan ComplianceXIAOHONG ZHAOspecial
02/05/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
02/03/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/03/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
02/03/2024Maintenance informationXIAOHONG ZHAOenergy_progress
02/03/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
02/03/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
02/03/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
02/03/2024Tenant Protection Plan Compliance—special
01/11/2024Maintenance informationXIAOHONG ZHAOenergy_progress
01/11/2024Heating SystemsXIAOHONG ZHAOspecial
01/11/2024Tenant Protection Plan Compliance—special
01/11/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
01/11/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
01/11/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/21/2023MasonryEric Sunspecial
09/13/2023Fire-Resistance Rated ConstructionEric Sunprogress
09/13/2023FinalEric Sunprogress
09/13/2023Tenant Protection Plan ComplianceEric Sunspecial
09/13/2023Fire-Resistant Penetrations and JointsEric Sunspecial
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00928835-I1Request digital key ↗
08/24/2026Q00933175-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
09/17/2013420512056Open ↗
07/19/2013420512056Open ↗
02/15/2012420532757Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
02/15/2012420532757Open ↗
12/29/2011420512056Open ↗
12/28/2011420512056Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026Q00906873-P4Open ↗
09/02/2026Q00906873-P4Open ↗
09/02/2026Q00906873-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00906873-P4Open ↗
08/31/2026Q00933175-I1Open ↗
08/31/2026Q00933175-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/15/2013420512056Open ↗
08/12/2013420512056Open ↗
12/12/2011420512056Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/15/2012420532757Open ↗
11/09/2011420501601Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/15/2012420532757Open ↗
11/09/2011420501601Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026Q00928835-I1Open ↗
08/24/2026Q00933175-I1Open ↗
▸Trade Schedules & Equipment15
▸BISEQUIPMENT USE PERMITS4
09/19/2013420512056Open ↗
09/19/2013420512056Open ↗
09/19/2013420512056Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
02/03/2012420512056Open ↗
01/17/2012420512056Open ↗
12/23/2011420512056Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
04/24/2012420512056Open ↗
04/09/2012420512056Open ↗
01/27/2012420512056Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/11/2012420532757Open ↗
▸BISWATER METER PERMIT : DEP-METER1
04/09/2012420512056Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/17/2013420512056Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
04/24/2012420512056Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
11/09/2011420501601Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
11/09/2011420501601Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/12/2011420512056Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026Q00933175-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/15/2013420512056Open ↗
08/12/2013420512056Open ↗
▸BISTECHNICAL REPORT: ENERGY2
12/12/2011420512056Open ↗
11/09/2011420501601Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/12/2013420512056Open ↗
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS3
02/15/2012420532757Open ↗
12/12/2011420512056Open ↗
11/09/2011420501601Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/17/2013420512056Open ↗
04/11/2012420532757Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
04/09/2012420512056Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
08/16/2013420512056Open ↗
08/12/2013420512056Open ↗
04/11/2012420532757Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
02/15/2012420532757Open ↗
12/12/2011420512056Open ↗
11/09/2011420501601Open ↗
▸BISADDITIONAL INFORMATION1
08/12/2013420512056Open ↗