Two stories - detached, small or mid-size
33-21 165 STREET
QUEENS · Murray Hill-Broadway Flushing · BIN 4118743
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,957 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2020$990K—— → —$506/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C510/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLIED RESTORATION CORPGeneral Contractor507/08/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK J. QUATELA, ARCHITE1632410/25/2021
Building Lifecycle
All (43)Filed (5)Permit Issued (4)Signed Off (1)Violation (1)Inspection (2)Special Inspection (30)
11/09/2022
Permit issued — Mechanical Systems
Q00479640-I1-GC-CX
07/05/2022
Signed off — Alteration
RELOCATE WASHER AND GAS DRYER, ADD NEW SINK FLOOR DRAIN , CAP AND REMOVE 3 PIECE BATHROOM AT CELLAR. RELOCATE SINK AND GAS RANGE IN KITCHEN, AND ADD 2 PIECE BATHROOM AT FIRST.. REPLACE/RELOCATE EXISTING BATHROOM AT SECOND FL. ADD 3 PIECE IN ATTIC
Q00465133-I1
10/27/2021
Permit issued — Mechanical Systems
Q00479640-I1-GC-CX
10/27/2021
Special inspection requirement — Concrete - Cast-In-Place
FRANK QUATELA
10/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK QUATELA
10/27/2021
Special inspection requirement — Mechanical Systems
FRANK QUATELA
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
10/27/2021
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
10/27/2021
Special inspection requirement — Final
FRANK QUATELA
10/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
10/27/2021
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
10/27/2021
Special inspection requirement — Maintenance information
FRANK QUATELA
10/27/2021
Special inspection requirement — Fenestration areas
FRANK QUATELA
10/27/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
10/27/2021
Special inspection requirement — Protection of exposed foundation insulation
FRANK QUATELA
10/27/2021
Special inspection requirement — Interior lighting power
FRANK QUATELA
10/27/2021
Special inspection requirement — Permanent certificate
FRANK QUATELA
10/27/2021
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
10/25/2021
Filed — Alteration CO
Q00479640-P1
10/04/2021
Filed — Alteration
RELOCATE WASHER AND GAS DRYER, ADD NEW SINK FLOOR DRAIN , CAP AND REMOVE 3 PIECE BATHROOM AT CELLAR. RELOCATE SINK AND GAS RANGE IN KITCHEN, AND ADD 2 PIECE BATHROOM AT FIRST.. REPLACE/RELOCATE EXISTING BATHROOM AT SECOND FL. ADD 3 PIECE IN ATTIC
Q00465133-P1
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
09/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
FRANK QUATELA
09/29/2021
Special inspection requirement — Concrete - Cast-In-Place
FRANK QUATELA
09/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
09/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
FRANK QUATELA
09/29/2021
Special inspection requirement — Maintenance information
FRANK QUATELA
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
09/29/2021
Special inspection requirement — Mechanical Systems
FRANK QUATELA
09/29/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK QUATELA
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
09/29/2021
Special inspection requirement — Final
FRANK QUATELA
09/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
FRANK QUATELA
09/29/2021
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
09/29/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
08/09/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/20/2021
Permit issued — Plumbing
Q00465133-I1-PL
07/09/2021
Permit issued — Mechanical Systems
Q00479640-I1-GC-CX
06/08/2021
Filed — Alteration
RELOCATE WASHER AND GAS DRYER, ADD NEW SINK FLOOR DRAIN , CAP AND REMOVE 3 PIECE BATHROOM AT CELLAR. RELOCATE SINK AND GAS RANGE IN KITCHEN, AND ADD 2 PIECE BATHROOM AT FIRST.. REPLACE/RELOCATE EXISTING BATHROOM AT SECOND FL. ADD 3 PIECE IN ATTIC
Q00465133-I1
06/01/2021
Filed — Alteration CO
Q00479640-I1
02/19/2021
Filed — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY AT OSP IN CONJUNCTION WITH GC APPLICATION Q00465429. NO CHANGE TO THE USE, EGRESS, AND OCCUPANCY.
Q00465372-I1
04/28/2008
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedALLIED RESTORATION11/09/2022
DOB NOWMechanical SystemsPermit IssuedALLIED RESTORATION10/27/2021
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP07/20/2021
DOB NOWMechanical SystemsPermit IssuedALLIED RESTORATION07/09/2021
BIS—ISSUEDMAJOR HOMES CORP.03/28/1995
1 project · most recent 09/06/2023
General Wiring
FiledStatusContractorScope
09/06/2023CompleteTEMPEST ELEC'L CONTRG, INGeneral Wiring
1 project · most recent 02/19/2021
Fence
FiledStatusContractorScope
02/19/2021——Fence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/09/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/27/2021Concrete - Cast-In-PlaceFRANK QUATELAspecial
10/27/2021Structural Stability – Alterations of existing buildingsFRANK QUATELAspecial
10/27/2021Mechanical SystemsFRANK QUATELAspecial
10/27/2021Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
10/27/2021Energy Code Compliance InspectionsFRANK QUATELAprogress
10/27/2021FinalFRANK QUATELAprogress
10/27/2021Fire-Resistance Rated ConstructionFRANK QUATELAprogress
10/27/2021Air barrier - visual inspectionFRANK QUATELAenergy_progress
10/27/2021Maintenance informationFRANK QUATELAenergy_progress
10/27/2021Fenestration areasFRANK QUATELAenergy_progress
10/27/2021Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
10/27/2021Protection of exposed foundation insulationFRANK QUATELAenergy_progress
10/27/2021Interior lighting powerFRANK QUATELAenergy_progress
10/27/2021Permanent certificateFRANK QUATELAenergy_progress
10/27/2021Fenestration air leakageFRANK QUATELAenergy_progress
09/29/2021Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
09/29/2021Energy Code Compliance InspectionsFRANK QUATELAprogress
09/29/2021HVAC-R and service water heating equipmentFRANK QUATELAenergy_progress
09/29/2021Concrete - Cast-In-PlaceFRANK QUATELAspecial
09/29/2021HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
09/29/2021HVAC-R and service water heating system controlsFRANK QUATELAenergy_progress
09/29/2021Maintenance informationFRANK QUATELAenergy_progress
09/29/2021Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
09/29/2021Mechanical SystemsFRANK QUATELAspecial
09/29/2021Structural Stability – Alterations of existing buildingsFRANK QUATELAspecial
Latest 25 of 36.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
08/27/2026Q00479640-P2Request digital key ↗
08/27/2026Q00479640-P1Request digital key ↗
08/27/2026Q00479640-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00465133-I1Request digital key ↗
08/15/2026Q00465133-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00465372-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00465133-P1Open ↗
09/01/2026Q00465133-P1Open ↗
08/31/2026Q00479640-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00465372-I1Open ↗
08/27/2026Q00465133-P1Open ↗
08/27/2026Q00465133-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00465133-P1Open ↗
08/31/2026Q00479640-P1Open ↗
08/28/2026Q00479640-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/27/2026Q00479640-I1Open ↗
08/27/2026Q00479640-P1Open ↗
08/13/2026Q00479640-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00479640-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00465133-I1Open ↗
08/27/2026Q00465133-P1Open ↗
08/27/2026Q00479640-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00465133-I1Open ↗