← Back
Primarily 2 family with 1 store or office
33-21 JUNCTION BOULEVARD
QUEENS · BIN 4042373
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6AZoning
3,120 sfGross Floor Area
3Units
1 Open Violation ▸
Primarily 2 family with 1 store or office · 2,900 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC306/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ZHENG & ASSOCIATES LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HP SERVICES INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330306/10/2020
Building Lifecycle
All (19)Filed (3)Permit Issued (2)Signed Off (1)Violation (10)Special Inspection (3)
07/28/2026
Violation issued (ECB, open)
Construction
06/15/2020
Signed off — Alteration
PLUMBING WORK AT 002 AND 003 ONLY. CAP AND REMOVE (2) BATHTUBS. REPLACE (2) 2PCS BATHROOM. INSTALL (2) NEW 3PCS BATHROOM AND (2) SHOWERS. REPLACE AND RELOCATE (2) SINKS. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00268462-I1
06/11/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/10/2020
Filed — Alteration
PLUMBING WORK AT 002 AND 003 ONLY. CAP AND REMOVE (2) BATHTUBS. REPLACE (2) 2PCS BATHROOM. INSTALL (2) NEW 3PCS BATHROOM AND (2) SHOWERS. REPLACE AND RELOCATE (2) SINKS. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00268462-P2
06/10/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
03/16/2020
Permit issued — Plumbing
Q00268462-I1-PL
01/20/2020
Filed — Alteration
PLUMBING WORK AT 002 AND 003 ONLY. CAP AND REMOVE (2) BATHTUBS. REPLACE (2) 2PCS BATHROOM. INSTALL (2) NEW 3PCS BATHROOM AND (2) SHOWERS. REPLACE AND RELOCATE (2) SINKS. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00268462-P1
01/20/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
11/22/2019
Filed — Alteration
PLUMBING WORK AT 002 AND 003 ONLY. CAP AND REMOVE (2) BATHTUBS. REPLACE (2) 2PCS BATHROOM. INSTALL (2) NEW 3PCS BATHROOM AND (2) SHOWERS. REPLACE AND RELOCATE (2) SINKS. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00268462-I1
11/22/2019
Permit issued — Plumbing
Q00268462-I1-PL
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2009
Violation issued (ECB, closed)
Boilers
01/13/1998
Violation issued (ECB, closed)
Quality of Life
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHP SERVICES INC03/16/2020
DOB NOWPlumbingSigned-offHP SERVICES INC11/22/2019
BISOTISSUEDYX CONSTRUCTION INC01/04/2020
BISOTISSUEDYX CONSTRUCTION INC11/25/2019
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/11/2020Fire-Resistant Penetrations and JointsJinfar Liuspecial
06/10/2020Fire-Resistant Penetrations and JointsJinfar Liuspecial
01/20/2020Fire-Resistant Penetrations and JointsJinfar Liuspecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing3
08/28/2026Q00268462-I1Request digital key ↗
08/15/2026Q00268462-P1Request digital key ↗
08/15/2026Q00268462-P2Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
12/04/2019421940163Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/04/2019421940163Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00268462-I1Open ↗
08/13/2026Q00268462-P1Open ↗
08/13/2026Q00268462-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q00268462-I1Open ↗
08/26/2026Q00268462-P1Open ↗
08/25/2026Q00268462-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/14/2020421940163Open ↗
12/04/2019421940163Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/04/2019421940163Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/04/2019421940163Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026Q00268462-I1Open ↗
08/13/2026Q00268462-P2Open ↗
08/13/2026Q00268462-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/04/2019421940163Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/14/2020421940163Open ↗
12/04/2019421940163Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/14/2020421940163Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
02/14/2020421940163Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/14/2020421940163Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/14/2020421940163Open ↗
12/04/2019421940163Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
12/04/2019421940163Open ↗
▸BISADDITIONAL INFORMATION1
01/28/2020421940163Open ↗