Two stories - detached, small or mid-size
33-25 162 STREET
QUEENS · Murray Hill-Broadway Flushing · BIN 4118627
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R1-2AZoning
3,036 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 10,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof1p · 1 filing · 14 docs
Floor 24p · 3 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar7p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2022$1.6M—Private party → Private party$527/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APEX ENERGY SOLUTIONS604/02/2026
LNZ, LLC208/05/2025
SORKIN ENGINEERING SERVICES PC310/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A T CONCEPT INCGeneral Contractor1007/08/2026
TRI STATE PLBG & HTG INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC15061004/02/2026
AMARACON TESTING & INSPEC5842107/02/2024
Building Lifecycle
All (97)Filed (11)Permit Issued (9)Inspection (5)Objection (42)Special Inspection (30)
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
04/16/2026
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
04/02/2026
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION ALT II FOR EXISTING RESIDENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. NO BOILER ON PREMISES. ELECTRIC HEATING ONLY.
Q00919958-P3
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
03/30/2026
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
01/30/2026
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION ALT II FOR EXISTING RESIDENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. NO BOILER ON PREMISES. ELECTRIC HEATING ONLY.
Q00919958-P2
01/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
01/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
01/22/2026
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
01/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
01/12/2026
Special inspection requirement — Final
XIAOHONG ZHAO
01/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
01/12/2026
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
01/12/2026
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
01/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
01/06/2026
Filed — Alteration
PROPOSAL MECHANICAL WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
Q00919957-P1
12/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
12/18/2025
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
12/18/2025
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
12/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/03/2025
Permit issued — Plumbing
Q00919958-I1-PL
08/05/2025
Filed — Alteration
PROPOSE EXTERIOR RENOVATION WITH NEW FACADE, FENESTRATIONS & INTERIOR RENOVATION WITH NEW PARTITIONS. FINISH WORKS AND MECHANICAL/PLUMBING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00919955-P1
07/25/2025
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION ALT II FOR EXISTING RESIDENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. NO BOILER ON PREMISES. ELECTRIC HEATING ONLY.
Q00919958-P1
02/25/2025
Permit issued — General Construction
Q00932932-I1-GC-CX
02/20/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2024
Permit issued — Mechanical Systems
Q00919957-I1-MS
11/26/2024
Permit issued — General Construction
Q00919955-I1-GC
10/31/2024
Filed — Alteration
PROPOSE EXTERIOR RENOVATION WITH NEW FACADE, FENESTRATIONS & INTERIOR RENOVATION WITH NEW PARTITIONS. NO VERTICAL OR HORIZONTAL ENLARGEMENT. FRAMING ALTERATIONS (ADJUSTMENT OF BEARING LINES,SHIFTING OF POSTS) AS PER PLANS.NO CHANGE IN USE,EGRESS,OCCUPANCY
Q00932932-P2
08/05/2024
Permit issued — Plumbing
Q00919958-I1-PL
07/02/2024
Filed — Alteration
PROPOSE EXTERIOR RENOVATION WITH NEW FACADE, FENESTRATIONS & INTERIOR RENOVATION WITH NEW PARTITIONS. NO VERTICAL OR HORIZONTAL ENLARGEMENT. FRAMING ALTERATIONS (ADJUSTMENT OF BEARING LINES,SHIFTING OF POSTS) AS PER PLANS.NO CHANGE IN USE,EGRESS,OCCUPANCY
Q00932932-P1
04/09/2024
Permit issued — Plumbing
Q00919958-I1-PL
03/11/2024
Permit issued — General Construction
Q00932932-I1-GC-CX
02/27/2024
Permit issued — General Construction
Q00919955-I1-GC
02/27/2024
Permit issued — Mechanical Systems
Q00919957-I1-MS
02/15/2024
Objection resolved — Addressed
02/07/2024
Objection resolved — Addressed
02/07/2024
Objection resolved — Addressed
02/07/2024
Objection resolved — Addressed
02/07/2024
Objection resolved — Addressed
02/07/2024
Objection resolved — Addressed
01/29/2024
Objection resolved — Addressed
01/29/2024
Objection resolved — Addressed
01/26/2024
Objection resolved — Addressed
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC10/03/2025
DOB NOWGeneral ConstructionSigned-offA T CONCEPT INC02/25/2025
DOB NOWMechanical SystemsSigned-offA T CONCEPT INC11/27/2024
DOB NOWGeneral ConstructionSigned-offA T CONCEPT INC11/26/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC08/05/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC04/09/2024
DOB NOWGeneral ConstructionSigned-offA T CONCEPT INC03/11/2024
DOB NOWGeneral ConstructionSigned-offA T CONCEPT INC02/27/2024
DOB NOWMechanical SystemsSigned-offA T CONCEPT INC02/27/2024
1 project · most recent 01/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2026Signed-offA T CONCEPT INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 3MXL24WMVJU9 27,400 BTU · Condensing Unit ×2
4MXL36WVJU9 36,600 BTU · Condensing Unit ×2
RXTG36TBVJUB 36,600 BTU · Vrf Outdoor ×2
RXTG48TBVJUB 54,000 BTU · Condensing Unit ×2
RXTQ36TBVJUA 40,000 BTU · Vrf Outdoor ×2
RZQ24TBVJUA 27,400 BTU · Condensing Unit ×2
Ventilation
Greenheck SP-L80 50 CFM · Exhaust Fan ×10
1 project · most recent 04/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/02/2026Signed-offTRI STATE PLBG & HTG INCGas, Storm, Water/Sanitary
2 projects · most recent 01/21/2026
General Wiring
FiledStatusContractorScope
01/21/2026CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
01/21/2026CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 10/31/2024
FiledStatusContractorScope
10/31/2024Signed-offA T CONCEPT INC2 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
04/16/2026Maintenance informationXIAOHONG ZHAOenergy_progress
04/16/2026HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
04/16/2026HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
04/16/2026HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
04/16/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
04/16/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
03/30/2026HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
03/30/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
03/30/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
03/30/2026HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
03/30/2026HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
03/30/2026Maintenance informationXIAOHONG ZHAOenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
01/22/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
01/22/2026HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
01/22/2026HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
01/22/2026Maintenance informationXIAOHONG ZHAOenergy_progress
01/22/2026HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
01/12/2026HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
01/12/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
01/12/2026FinalXIAOHONG ZHAOprogress
01/12/2026HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
01/12/2026Maintenance informationXIAOHONG ZHAOenergy_progress
01/12/2026HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
01/12/2026Mechanical SystemsXIAOHONG ZHAOspecial
Latest 25 of 83.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/22/2026Q00932932-P2Request digital key ↗
08/22/2026Q00932932-P1Request digital key ↗
08/22/2026Q00932932-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature22
09/20/2026Q00919958-I1Open ↗
09/20/2026Q00919958-I1Open ↗
09/01/2026Q00932932-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026Q00932932-P2Open ↗
08/22/2026Q00932932-P1Open ↗
08/22/2026Q00932932-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/20/2026Q00919958-I1Open ↗
09/01/2026Q00932932-I1Open ↗
09/01/2026Q00932932-P2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/22/2026Q00932932-P2Open ↗
08/22/2026Q00932932-P1Open ↗
08/22/2026Q00932932-I1Open ↗
Showing 3 of 11 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00932932-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026Q00919955-I1Open ↗
08/13/2026Q00919955-P1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00932932-I1Open ↗