← Back
Elevator cooperative
33-25 92 STREET
QUEENS · BIN 4431417
💬 Discuss this project
1958Year Built
6Stories
D4Building Class
R6AZoning
395,940 sfGross Floor Area
360Units
LL97 CoveredRent Stabilized40 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: SOUTHRIDGE COOPERATIVE SEC I · 115,000 sf lot · 3.44 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOUTHRIDGE COOPERATIVE SECTION 11009/10/2026
SOUTH RIDGE COOPERATIVE303/22/2026
SOUTHRIDGE COOP SEC 1203/21/2026
SOUTHRIDGE CO-OPERATIVE SECTION403/21/2026
SOUTHRIDGE COOP - SECTION 1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM ENGINEERING PLLC104/08/2026
BADALY ENGINEERING PLLC108/31/2021
KZ ENGINEERING, P.C204/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOIST & SCAFFO*General Contractor807/08/2026
2260 MAG CORPGeneral Contractor303/21/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
VOLTAIC SOLAIRE LLCGeneral Contractor109/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244104/08/2026
BADALY ARCHITECT PLLC7137108/31/2021
Building Lifecycle
All (60)Filed (5)Permit Issued (7)Signed Off (2)Facade (FISP) (15)Violation (26)Special Inspection (5)
09/18/2026
Permit issued — Suspended Scaffold
Q01441419-I1-SC
09/09/2026
Permit issued — Solar
Q01373385-I1-SL
08/27/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Q01441419-I1
05/08/2026
Violation issued (HPD, open)
A
04/08/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01373385-I1
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/17/2026
Special inspection requirement — Final
NARESH MAHANGU
03/17/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
03/11/2026
Violation issued (FDNY_NOV, closed)
11/21/2025
Violation issued (HPD, open)
I
06/13/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, open)
I
07/12/2023
Signed off — Alteration
Q00209688-I1
03/30/2023
Violation issued (HPD, closed)
A
02/06/2023
Cycle 9 facade report submitted
02/02/2023
Cycle 9 facade report signed — SAFE
12/21/2022
Cycle 9 facade inspection completed
08/16/2022
Cycle 8 facade report submitted
08/15/2022
Cycle 8 facade report signed — SAFE
08/03/2022
Cycle 8 facade inspection completed
04/04/2022
Permit issued — Sidewalk Shed
Q00209688-I1-SH
03/08/2022
Violation issued (HPD, closed)
A
11/29/2021
Signed off — Alteration
Q00574356-I1
09/08/2021
Permit issued — General Construction
Q00574356-I1-GC
08/31/2021
Filed — Alteration
Q00574356-I1
04/26/2021
Filed — Alteration
Q00209688-P1
04/19/2021
Violation issued (HPD, closed)
A
04/01/2021
Permit issued — Sidewalk Shed
Q00209688-I1-SH
04/07/2020
Permit issued — Sidewalk Shed
Q00209688-I1-SH
10/09/2019
Violation issued (ECB, closed)
Construction
10/04/2019
Cycle 8 facade report submitted
10/04/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/18/2019
Cycle 8 facade report signed — UNSAFE
08/29/2019
Cycle 8 facade inspection completed
08/19/2019
Permit issued — Sidewalk Shed
Q00209688-I1-SH
08/16/2019
Filed — Alteration
Q00209688-I1
01/14/2019
Violation issued (ECB, closed)
Local Law
10/25/2018
Violation issued (HPD, closed)
I
07/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/25/2016
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
08/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2012
Cycle 7 facade report submitted
09/20/2012
Cycle 7 facade report signed — SWARMP
09/14/2012
Cycle 7 facade inspection completed
09/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/29/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/07/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/07/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/20/2007
Cycle 6 facade report submitted
02/15/2007
Cycle 6 facade report signed — SWARMP
01/24/2007
Cycle 6 facade inspection completed
10/09/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/13/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/22/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/13/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/08/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM09/18/2026
DOB NOWSolarPermit IssuedVOLTAIC SOLAIRE LLC09/09/2026
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*04/04/2022
DOB NOWGeneral ConstructionSigned-off2260 MAG CORP09/08/2021
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*04/01/2021
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*04/07/2020
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*08/19/2019
BISOTISSUEDTWO-TONE CONTRACTING CORP.07/01/2022
BISOTISSUEDTWO-TONE CONTRACTING CORP.08/25/2021
BIS—ISSUEDTWO-TONE CONTRACTING CORP.03/27/2017
BISPLISSUEDPETER MICELI PLUMBING02/28/2017
BIS—ISSUEDTWO-TONE CONTRACTING CORP.01/23/2017
BISOTISSUEDEDIFICE DESIGN INC05/21/2015
BISEQISSUEDGUL & G CONSTR. CORP08/18/2014
BISOTISSUEDPINNACLE RESTORATION LTD07/10/2013
2 projects · most recent 02/26/2026
FiledStatusContractorScope
02/26/2026Permit IssuedBERGER QUALITY ELEC'L CON—
08/13/2019CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Permit IssuedVOLTAIC SOLAIRE LLC206 panels, 121.54 kw, 18,736 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/17/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/17/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
03/17/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/17/2026FinalNARESH MAHANGUprogress
03/17/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
09/01/2026Q01441419-I1Request digital key ↗
08/27/2026Q00574356-I1Request digital key ↗
08/17/2026Q01373385-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00209688-I1Request digital key ↗
08/15/2026Q00209688-P1Request digital key ↗
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION9
08/25/2021440631363Open ↗
11/07/2019421559110Open ↗
04/11/2017421056788Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/08/2020440631363Open ↗
06/14/2019421559110Open ↗
06/14/2017421056788Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/30/2018421056788Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/12/2019421559110Open ↗
01/24/2017421056788Open ↗
05/27/2016420855024Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00574356-I1Open ↗
08/17/2026Q01373385-I1Open ↗
08/13/2026Q00209688-P1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/08/2020440631363Open ↗
07/14/2013440094425Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/08/2020440631363Open ↗
07/14/2013440094425Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/08/2020440631363Open ↗
07/14/2013440094425Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01373385-I1Open ↗
08/27/2026Q01373385-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/10/2013420855024Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/10/2013420855024Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01373385-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/14/2019421559110Open ↗
10/26/2015421056788Open ↗
▸BISSPRINKLER SYSTEMS1
11/19/2020421559110Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
09/16/2019421559110Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
09/12/2019421559110Open ↗
09/12/2019421559110Open ↗
10/08/2020440631363Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026Q00209688-I1Open ↗
08/13/2026Q00209688-P1Open ↗
▸BISSTREET TREE CHECKLIST1
10/26/2015421056788Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/08/2020440631363Open ↗
06/14/2019421559110Open ↗
10/26/2015421056788Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00574356-I1Open ↗
08/17/2026Q01373385-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/12/2019421559110Open ↗
01/24/2017421056788Open ↗
01/24/2017421056788Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/20/2023440631363Open ↗
08/25/2021440631363Open ↗
10/08/2020440631363Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/20/2023440631363Open ↗
12/09/2015420855024Open ↗
▸BISNYCECC ANALYSIS1
10/08/2020440631363Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/08/2020440631363Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/20/2023440631363Open ↗
06/20/2023440631363Open ↗
08/25/2021440631363Open ↗
Showing 3 of 9 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/25/2021440631363Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
07/29/2019440094425Open ↗
▸BISHYDRO FLOW TEST LETTER1
09/16/2019421559110Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/23/2023440631363Open ↗
03/01/2021421559110Open ↗
05/26/2020421559110Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
04/25/2016421056788Open ↗
10/26/2015421056788Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/16/2019421559110Open ↗
08/26/2014440094425Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/10/2013420855024Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
06/20/2023440631363Open ↗
11/19/2020421559110Open ↗
10/08/2020440631363Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION5
02/14/2020421559110Open ↗
07/11/2017421056788Open ↗
08/22/2016421056788Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
06/14/2019421559110Open ↗
10/26/2015421056788Open ↗
07/05/2013420855024Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/08/2020440631363Open ↗
07/14/2013440094425Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
08/16/2016421056788Open ↗
10/26/2015421056788Open ↗
▸BISSupporting Document: Fee Exempt1
05/28/2015420855024Open ↗
▸DOB NOWIRA Certification1
09/01/2026Q01441419-I1Open ↗