ECB08/06/200850A.50B.50C.50D.50E.48B.51 50A spillage of carbon monoxide in boiler rm reading of 1045 p.p.m (extremely dangerous) 50B adjust gas burner for complete combustion & efficiency by a licensed person experiencedNothing owed — awaiting certificate of correction
ECB01/19/20073C, 50A. 50A:combustion spillage from draft stat due to defective flue pipe.Nothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB11/14/2025Violation issued-failure to file 2024 internal hgh pressure inspectionAnswered on the city's records: a 2024 boiler inspection report was accepted (May 10, 2024)
DOB11/14/2025Violation issued-failure to file 2024 external hgh pressure inspectionAnswered on the city's records: a 2024 boiler inspection report was accepted (May 10, 2024)
DOB09/23/2024Violation issued-failure to file 2023 internal hgh pressure inspectionAnswered on the city's records: a 2023 boiler inspection report was accepted (May 9, 2023)
DOB09/23/2024Violation issued-failure to file 2023 external hgh pressure inspectionAnswered on the city's records: a 2023 boiler inspection report was accepted (May 9, 2023)
DOB06/30/2023Violation issued-failure to file 2020 internal hgh pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2025). This one is not shown as answered
DOB06/30/2023Violation issued-failure to file 2021 external hgh pressure inspectionAnswered on the city's records: a 2021 boiler inspection report was accepted (Nov 15, 2021)
DOB06/30/2023Violation issued-failure to file 2021 internal hgh pressure inspectionAnswered on the city's records: a 2021 boiler inspection report was accepted (Nov 15, 2021)
DOB06/30/2023Violation issued-failure to file 2020 external hgh pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2025). This one is not shown as answered
DOB06/20/2023Violation issued-failure to file 2019 internal hgh pressure inspectionAnswered on the city's records: a 2019 boiler inspection report was accepted (Jan 31, 2019)
DOB04/25/2023Violation issued-failure to file 2022 internal high pressure inspectionAnswered on the city's records: a 2022 boiler inspection report was accepted (Oct 18, 2022)
DOB04/25/2023Violation issued-failure to file 2022 external high pressure inspectionAnswered on the city's records: a 2022 boiler inspection report was accepted (Oct 18, 2022)