Elevator apt, fireproof without stores
33-25 JUNCTION BOULEVARD
QUEENS · BIN 4042371
💬 Discuss this project
0Year Built
7Stories
D3Building Class
R6AZoning
17,598 sfGross Floor Area
24Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Elevator apt, fireproof without stores · Owner of record: KELLY'S JUNCTION LLC · 5,392 sf lot · 3.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionLandscape
Roof38p · 1 filing · 20 docs
Floor 737p · 1 filing · 20 docs
Floor 635p · 1 filing · 20 docs
Floor 535p · 1 filing · 20 docs
Floor 435p · 1 filing · 20 docs
Floor 336p · 1 filing · 20 docs
Floor 234p · 1 filing · 20 docs
Floor 136p · 1 filing · 20 docs
Cellar39p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KELLYS PROPERTIES6807/08/2026
APH GROUP503/22/2026
GROUP LLC APH103/22/2026
KELLY JUNCTION LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2022$1.3M—JACKSON HEIGHTS ESTATES, LLC → KELLY'S JUNCTION LLC$73/sf building
12/26/2019$1.1M—BEST GLORY LAND, LLC → JACKSON HEIGHTS ESTATES, LLC$65/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY ENGINEERING PC1003/21/2026
ABC ENGINEERING PLLC603/21/2026
THE GREEN STUDIO503/21/2026
TIMES BUILDINGS ENGINEERING SERVICE103/21/2026
METRO VIBE203/21/2026
MILLENNIUM DESIGNS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APH GROUP LLCGeneral Contractor2107/08/2026
KWONG MING ELECTRIC INCElectrical403/22/2026
TRI STATE PLBG & HTG INCPlumbing407/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor207/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
RRP PLUMBINGPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUST CONSULTING ENGINEERI5865705/18/2026
Z & T ENGINEERING, P.C.591704/10/2024
Building Lifecycle
All (149)Filed (24)Permit Issued (18)Signed Off (9)Violation (13)Inspection (16)Objection (36)Special Inspection (30)Tax Incentive (3)
06/18/2026
Special inspection requirement — Exterior lighting power
XIAOJUN WANG
06/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
06/18/2026
Special inspection requirement — Electrical motors and elevators
XIAOJUN WANG
06/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
06/18/2026
Special inspection requirement — Metering
XIAOJUN WANG
06/18/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
06/18/2026
Special inspection requirement — Lighting in dwelling units
XIAOJUN WANG
06/18/2026
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
06/18/2026
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
06/18/2026
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
06/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
06/18/2026
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
06/18/2026
Special inspection requirement — Interior lighting power
XIAOJUN WANG
06/18/2026
Special inspection requirement — Lighting controls
XIAOJUN WANG
06/18/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
06/17/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Structural
05/18/2026
Filed — New Building
INSTALL NEW HVAC SYSTEM FOR 7 STORY NEW BUILDING IN CONJUNCTION WITH JOB#Q08005225,NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q08005225-A2
05/18/2026
Special inspection requirement — Metering
XIAOJUN WANG
05/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
05/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
05/18/2026
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
05/18/2026
Special inspection requirement — Electrical motors and elevators
XIAOJUN WANG
05/18/2026
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
05/18/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
05/18/2026
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
05/18/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
05/18/2026
Special inspection requirement — Exterior lighting power
XIAOJUN WANG
05/18/2026
Special inspection requirement — Interior lighting power
XIAOJUN WANG
05/18/2026
Special inspection requirement — Lighting controls
XIAOJUN WANG
05/19/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Signed off — New Building
INSTALL NEW HVAC SYSTEM FOR 7 STORY NEW BUILDING IN CONJUNCTION WITH JOB#Q08005225,NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q08005225-S6
05/01/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Energy
03/06/2025
Filed — New Building
INSTALL NEW HVAC SYSTEM FOR 7 STORY NEW BUILDING IN CONJUNCTION WITH JOB#Q08005225,NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q08005225-A1
02/25/2025
Signed off — New Building
INSTALL NEW HVAC SYSTEM FOR 7 STORY NEW BUILDING IN CONJUNCTION WITH JOB#Q08005225,NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q08005225-S1
02/24/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/04/2025
Signed off — Alteration
Q00931132-I1
02/04/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING, NEEDLE BEAM, AND SYSTEM BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00969446-I1
02/04/2025
Signed off — Alteration
FILE CONSTRUCTION FENCE IN CONJUNCTION WITH DEMO#421959303.
Q00750764-I1
01/30/2025
485-x construction completed
01/21/2025
Permit issued — Mechanical Systems
Q08005225-S6-MS
01/21/2025
Permit issued — Curb Cut
Q08005225-S1-CC
01/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/09/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
01/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/30/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2024
Objection resolved — Addressed
12/11/2024
Objection raised — Zoning
12/04/2024
485-x registration filed
12/02/2024
Filed — New Building
INSTALL NEW HVAC SYSTEM FOR 7 STORY NEW BUILDING IN CONJUNCTION WITH JOB#Q08005225,NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q08005225-P9
11/27/2024
Objection resolved — Addressed
11/27/2024
Objection resolved — Addressed
11/27/2024
Objection resolved — Addressed
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAPH GROUP LLC01/21/2025
DOB NOWCurb CutSigned-offAPH GROUP LLC01/21/2025
DOB NOWGeneral ConstructionPermit IssuedAPH GROUP LLC09/04/2024
DOB NOWStructuralSigned-offAPH GROUP LLC08/30/2024
DOB NOWConstruction FenceSigned-offAPH GROUP LLC08/30/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC08/06/2024
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.06/17/2024
DOB NOWConstruction FenceSigned-offAPH GROUP LLC05/08/2024
DOB NOWGeneral ConstructionPermit IssuedAPH GROUP LLC01/10/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC12/19/2023
DOB NOWPlumbingSigned-offDW PLUMBING INC12/14/2023
DOB NOWStructuralSigned-offAPH GROUP LLC09/14/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/12/2023
DOB NOWSupport of ExcavationSigned-offAPH GROUP LLC06/06/2023
DOB NOWConstruction FenceSigned-offAPH GROUP LLC06/06/2023
DOB NOWFoundationSigned-offAPH GROUP LLC03/17/2023
DOB NOWSupport of ExcavationSigned-offAPH GROUP LLC03/02/2023
DOB NOWConstruction FenceSigned-offAPH GROUP LLC08/08/2022
BIS—ISSUEDAPH GROUP LLC08/18/2022
1 project · most recent 05/18/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Signed-offAPH GROUP LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NA3 22,000 BTU · Condensing Unit ×20
MUZ-GL15NA 14,000 BTU · Condensing Unit ×16
MXZ-3C30NA3 28,400 BTU · Condensing Unit ×12
MUZ-FS06NA 6,000 BTU · Condensing Unit ×4
MUZ-GL09NA 9,000 BTU · Condensing Unit ×2
Daikin DFH0363D000001SAA 35,000 BTU · Rooftop Unit ×2
Ventilation
Greenheck G-070-VG 214 CFM · Exhaust Fan ×8
G-080-VG 379 CFM · Exhaust Fan ×8
1 project · most recent 05/18/2026
Sprinkler System
FiledStatusContractorScope
05/18/2026Permit IssuedRRP PLUMBING CORPSprinkler System
1 project · most recent 05/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/18/2026Signed-offTRI STATE PLBG & HTG INCStorm, Water/Sanitary
4 projects · most recent 01/10/2025
General Wiring
FiledStatusContractorScope
01/10/2025CompleteKWONG MING ELECTRIC INC26 meters, 26 new_meters
01/10/2025CompleteKWONG MING ELECTRIC INCGeneral Wiring
03/15/2024Permit IssuedKWONG MING ELECTRIC INC—
09/12/2023CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 05/18/2026
Concrete
FiledStatusContractorScope
05/18/2026Signed-offAPH GROUP LLCConcrete
1 project · most recent 05/18/2026
Fence
FiledStatusContractorScope
05/18/2026Signed-offAPH GROUP LLCFence
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/19/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
01/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/30/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/03/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
06/18/2026Lighting controlsXIAOJUN WANGenergy_progress
06/18/2026Air barrier - visual inspectionXIAOJUN WANGenergy_progress
06/18/2026Interior lighting powerXIAOJUN WANGenergy_progress
06/18/2026Fenestration air leakageXIAOJUN WANGenergy_progress
06/18/2026Lighting in dwelling unitsXIAOJUN WANGenergy_progress
06/18/2026Air barrier — testing XIAOJUN WANGenergy_progress
06/18/2026Fenestration areasXIAOJUN WANGenergy_progress
06/18/2026Exterior lighting powerXIAOJUN WANGenergy_progress
06/18/2026Electrical motors and elevatorsXIAOJUN WANGenergy_progress
06/18/2026Energy Code Compliance InspectionsFei Zengprogress
06/18/2026Fire-Resistance Rated ConstructionFei Zengprogress
06/18/2026Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
06/18/2026Insulation placement and R valuesXIAOJUN WANGenergy_progress
06/18/2026Protection of exposed foundation insulationXIAOJUN WANGenergy_progress
06/18/2026MeteringXIAOJUN WANGenergy_progress
06/18/2026Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
05/18/2026Exterior lighting powerXIAOJUN WANGenergy_progress
05/18/2026Lighting controlsXIAOJUN WANGenergy_progress
05/18/2026Electrical motors and elevatorsXIAOJUN WANGenergy_progress
05/18/2026MeteringXIAOJUN WANGenergy_progress
05/18/2026Protection of exposed foundation insulationXIAOJUN WANGenergy_progress
05/18/2026Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
05/18/2026Interior lighting powerXIAOJUN WANGenergy_progress
05/18/2026Air barrier — testing XIAOJUN WANGenergy_progress
05/18/2026Fenestration areasXIAOJUN WANGenergy_progress
Latest 25 of 111.
▾Documents — 171 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/26/2026Q00750764-I1Request digital key ↗
08/24/2026Q00931132-I1Request digital key ↗
08/24/2026Q00931132-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation2
02/06/2023440748960Open ↗
10/06/2022440748960Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/06/2022440748960Open ↗
09/20/2022421959303Open ↗
▸BISWORK PERMIT APPLICATION1
09/27/2022421959303Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/14/2026Q08005225-A2Open ↗
08/13/2026Q08005225-I1Open ↗
08/13/2026Q08005225-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/14/2026Q08005225-A2Open ↗
08/13/2026Q08005225-P1Open ↗
08/13/2026Q08005225-P9Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/06/2022440748960Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08005225-I1Open ↗
▸Seals & Professional Certifications81
▸DOB NOWSpecial Inspector Seal & Signature31
09/22/2026Q08005225-P7Open ↗
09/01/2026Q08005225-P3Open ↗
09/01/2026Q08005225-P3Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/22/2026Q08005225-P7Open ↗
09/22/2026Q08005225-P7Open ↗
08/30/2026Q08005225-P5Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/24/2026Q00931132-P1Open ↗
08/24/2026Q00931132-I1Open ↗
08/16/2026Q08005225-S1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/27/2022421959303Open ↗
09/20/2022421959303Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/06/2022440748960Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q08005225-I1Open ↗
08/13/2026Q08005225-P1Open ↗
08/13/2026Q08005225-P9Open ↗
▸BISELECTRIC CUT-OFF1
09/27/2022421959303Open ↗
▸BISSEWER CUT-OFF1
09/27/2022421959303Open ↗
▸BISGAS CUT-OFF1
09/27/2022421959303Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist4
08/14/2026Q08005225-A2Open ↗
08/13/2026Q08005225-P1Open ↗
08/13/2026Q08005225-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
09/27/2022421959303Open ↗
09/27/2022421959303Open ↗
▸BISSTREET TREE CHECKLIST2
01/26/2023440748960Open ↗
10/06/2022440748960Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/20/2022421959303Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/26/2023440748960Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/20/2022421959303Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08005225-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08005225-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/27/2022421959303Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/13/2026Q08005225-S3Open ↗
08/13/2026Q08005225-P5Open ↗
08/13/2026Q08005225-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q08005225-S2Open ↗
08/13/2026Q08005225-S3Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/06/2022440748960Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/06/2023440748960Open ↗
09/27/2022421959303Open ↗
09/27/2022421959303Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
09/27/2022421959303Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/27/2022421959303Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
09/27/2022421959303Open ↗
09/20/2022421959303Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/06/2022440748960Open ↗
▸BISEFILING COVER SHEET1
09/20/2022421959303Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/06/2022440748960Open ↗
▸BISADDITIONAL INFORMATION1
02/06/2023440748960Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/14/2026Q08005225-A2Open ↗
08/13/2026Q08005225-P9Open ↗
08/13/2026Q08005225-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/14/2026Q08005225-A2Open ↗
08/13/2026Q08005225-I1Open ↗
08/13/2026Q08005225-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/16/2026Q08005225-P9Open ↗
08/16/2026Q08005225-P1Open ↗
08/15/2026Q08005225-I1Open ↗
Showing 3 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/06/2022440748960Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/06/2022440748960Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08005225-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08005225-S2Open ↗