← Back
One story - permanent living quarter
33-30 156 STREET
QUEENS · Murray Hill-Broadway Flushing · BIN 4118453
💬 Discuss this project
1925Year Built
1Stories
A2Building Class
R2Zoning
1,120 sfGross Floor Area
1Units
One story - permanent living quarter · 4,040 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 7 docs
Floor 22p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/02/2021$850K—Private party → Private party$759/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LONGVIEW ENGINEERING, PLLC106/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO203/21/2026
Building Lifecycle
All (49)Filed (1)Objection (24)Special Inspection (24)
04/20/2026
Objection raised — Admin
04/20/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
12/30/2025
Special inspection requirement — Permanent certificate
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/08/2025
Objection raised — Zoning
07/08/2025
Objection raised — Admin
07/08/2025
Objection raised — Fire_Protection
07/08/2025
Objection raised — Zoning
07/08/2025
Objection raised — Fire_Protection
07/08/2025
Objection raised — Energy
07/08/2025
Objection raised — Structural
07/08/2025
Objection raised — Zoning
07/08/2025
Objection raised — Inspections
07/08/2025
Objection raised — Admin
07/08/2025
Objection raised — Zoning
06/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED A 2-STORY AND ONE FAMILY BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01231854-I1
06/04/2025
Special inspection requirement — Chimneys and vents
06/04/2025
Special inspection requirement — Concrete - Cast-In-Place
06/04/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/04/2025
Special inspection requirement — Masonry
06/04/2025
Special inspection requirement — Structural Steel - Details
06/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
06/04/2025
Special inspection requirement — Structural Steel - Welding
06/04/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/04/2025
Special inspection requirement — Wood – Prefabricated I-Joists
06/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/04/2025
Special inspection requirement — Air barrier — testing
06/04/2025
Special inspection requirement — Fenestration areas
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
06/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/04/2025
Special inspection requirement — Structural Wood Frame
06/04/2025
Special inspection requirement — Insulation placement and R values
06/04/2025
Special inspection requirement — Air barrier - visual inspection
06/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/04/2025
Special inspection requirement — Fenestration air leakage
06/04/2025
Special inspection requirement — Protection of exposed foundation insulation
05/27/2025
Special inspection requirement — Footing and Foundation
05/27/2025
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 06/16/2025
Concrete Masonry Wood
FiledStatusContractorScope
06/16/2025——Concrete, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
12/30/2025Permanent certificate—energy_progress
06/04/2025Chimneys and vents—special
06/04/2025Concrete - Cast-In-Place—special
06/04/2025Excavations - Sheeting, Shoring, and Bracing—special
06/04/2025Fire-Resistant Penetrations and Joints—special
06/04/2025Masonry—special
06/04/2025Structural Steel - Details—special
06/04/2025Structural Steel - High Strength Bolting—special
06/04/2025Structural Steel - Welding—special
06/04/2025Subsurface Conditions – Fill Placement & In-Place Density—special
06/04/2025Wood – Prefabricated I-Joists—special
06/04/2025Structural Stability – Alterations of existing buildings—special
06/04/2025Air barrier — testing —energy_progress
06/04/2025Fenestration areas—energy_progress
06/04/2025Energy Code Compliance Inspections—progress
06/04/2025Fire-Resistance Rated Construction—progress
06/04/2025Structural Wood Frame—progress
06/04/2025Insulation placement and R values—energy_progress
06/04/2025Air barrier - visual inspection—energy_progress
06/04/2025Fenestration and door U-factor and product ratings—energy_progress
06/04/2025Fenestration air leakage—energy_progress
06/04/2025Protection of exposed foundation insulation—energy_progress
05/27/2025Footing and Foundation—progress
05/27/2025Final—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01231854-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01231854-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01231854-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01231854-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01231854-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026Q01231854-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01231854-I1Open ↗