Two stories - detached, small or mid-size
33-41 150 STREET
QUEENS · BIN 4112893
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2AZoning
1,831 sfGross Floor Area
1Units
Rent Stabilized3 Open Violations ▸
Two stories - detached, small or mid-size · Owner of record: 3341 150TH ST LLC · 4,400 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
StructuralElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 8 docs
Floor 2Under Construction1p · 1 filing · 8 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC102/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINITY SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036102/22/2026
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Violation (3)Special Inspection (5)
02/25/2026
Permit issued — Solar
Q01361589-I1-SL
02/22/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01361589-I1
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
02/18/2026
Special inspection requirement — Final
Ayracon Almaraz
02/18/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC02/25/2026
1 project · most recent 05/21/2026
FiledStatusContractorScope
05/21/2026CompleteREDLINE ELECTRIC INC—
1 project · most recent 02/22/2026
FiledStatusContractorScope
02/22/2026Permit IssuedTRINITY SOLAR LLC22 panels, 9.02 kw, 868 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/18/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
02/18/2026Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
02/18/2026Energy Code Compliance InspectionsAyracon Almarazprogress
02/18/2026FinalAyracon Almarazprogress
02/18/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01361589-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01361589-I1Open ↗
08/23/2026Q01361589-I1Open ↗
08/23/2026Q01361589-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01361589-I1Open ↗
08/23/2026Q01361589-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01361589-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01361589-I1Open ↗